Loading...
Northlake 635(2)-LR 970207 (3)Maxi 25 TECHNOLOGIES INC REPORT OF MOISTURE-DENSITY RELATIONS CLIENT: Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 -PROJECT: COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PROJECT NO.: 0903 REPORT NO.: 1121; DATE OF SERVICE: AUTHORIZATION: REPORT DATE: 2 / SERVICES: Obtain sample of material used for construction, prepare perform moisture-density relations test to establish the and optimum moisture of the material. CONTRACTOR: BUTLER CONSTRUCTION TEST FOR: P. roposed Select Fill MATERIAL: Reddish Brown Clayey Sand METHOD OF TEST: ASTM D698, Method A ASTM D4318, Proc. A PROJECT DATA DATE SAMPLED: 2/03/ SAMPLED BY: Daniel SAMPLE LOCATION: On Dry Dans. (pcf) REPORT OF TESTS 11 11 11 11 9 1 13 15 17 19 21 MAXI/~ OPTIML LIQUID PLASTIC PLASTICITY E = Est~ MOISTURE CONTENT (%) Technician: Jason B. Allen Technician Report Distribution: MAXIM TEC: (1) tinco[n Property Co. (1) BUTLER CONSTRUCTION [NCORP. (1) BROCKETT-DAVIS-DRAKE, INC. (1) THE CITY OF COPPELL 1008 JBA Our lettem and rel:)oKI i~e fo~ the exclusive uae of the client to whom tl~Hjr~rlSdreesed and shall not be re~rodu~ full without the aS)torov~ of the teltir~ laboratory. The uae of ourname must receive our written a~l~rovd. Our lek ~ply o~ly to the limple Tach. · Southwestern Labs Lone Star Dr. · P.O. Box 224227 Dallas. Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 05034 /03/9? 7/97 samples and maximum density 97 Hernandez ite Stockpile/Borrow JM DENSITY, PCF: 115. O M MOISTURE (%): 13 · 5 IMIT: 30 IMIT: 15 IDEX: 15 ated Value REQUIREMENTS Range 7 - 16 oject Manager ~1 excel~ in ,niler