Loading...
Northlake 635(2)-LR 970206 (2)TECHNOLOGIES INC Msx REPORT OF CONCRETE COMPRESSIVE STRENGTH CLIENT: Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 PROJECT: COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PROJECT NO.: 0903 REPORT NO.: 1118! DATE OF SERVICE: AUTHORIZATION: REPORT DATE: 2 / SERVICES: Test compressive strength specimens prepared in conjunctl inspection. CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 5" AIR: 3-6% METHOD OF TEST: ASTM C-39 PROJECT DATA MIX DESIGN NUMBER: 933! DATE OF PLACEMENT: 1/2 TIME SAMPLED: 0.8: 15~ TEMPERATURE (°F) - AIR: 4( TRUCK NO: 552 AIR CONTENT(%): 5.0 LOCATION OF PLACEMENT: 75' West, 50' nroth corner REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS CYLINDER MEASURED MARKED SLUMP DATE AGE SET NO. (inches) TESTED {days) i 1 5.00 2/06/97 7 1 2 2/27/97 28 1 3 2/27/97 28 1 4 HOLD HOLD MAXIMUM DIAMETER AREA LOAD (in.) (sq.in.) (lbs. force) 6.00 28.27 82020 ADDITIONALCOMMENTS: Ten (10) gallons of water added Concrete contractor adding water to trucks after slump is Technician: Steve Long Technician Report Of Tests Continued On Page 2 1001 LW rm Tach. · Southwestern Labs 75 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 605034 )0 ~/30/97 )6/97 .on with concrete ) 10/97 BY: Steve Long CONCRETE: 50 TICKET NO: 336236 of northeast building :OMPRESSIVE STRENGTH {psi) 2900 REMARKS let. Our letters end reports ue for the exclusive usa of the client to whom they are Iddrelaed and shill not be ropredu ed except in full without the approval of the tearing laboratory. The ule of ourname must receive our written approvil, Our te ere end reports apply only to the ssmple teated and/or inspected, and are not indicative of the quantities of apparently identicst or ! imilsr Droducte. Lincoln Property Co. PROJECT NO. 0903605034 DATE OFSERVICE: 1/30/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 5" AIR: 3-6% METHOD OF TEST: ASTM C-39 PROJECT DATA MIX DESIGN NUMBER: 933c~ DATE OF PLACEMENT: 1/2 TIME SAMPLED: ll:20AM TEMPERATURE ( I F) - AIR: 50 TRUCK NO: 131 AIR CONTENT(%): 6.0 LOCATION OF PLACEMENT: 70' East, 40' north corner CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM AGE DIAMETER AREA LOAD (days) {in.} (sq.in.) (lbs. force) 2 1 6.50 2/06/97 7 2 2 2/27/97 28 2 3 2/27/97 28 2 4 HOLD HOLD 6.00 28.27 76810 ADDITIONALCOMMENTS: Fifteen (15) gallons of water added. Concrete contractor ad slump was visually set. Technician: Steve Long Technician Report Distribution: (1) Lincoln Property Co. M~ (1) BUTLER CONSTRUCTION INCORP. / (1) SROCKETT-DAVIS-DRAKE, INC. / (1) THE CITY OF COPPELL // (1) T"E CITY OF COPPELL / ~(a'~"l~/ (1) 0'8RIEN ASSOCIATES, INC. ~ 1001 LW Our le~S ~ re,otis are for t~ excl~ive ~ of t~ client te w~m t~y ~e ~dr~ ~ ~ full withe~ t~ a~revN of t~ t~ti~ laboratory. T~ ~ of o~neme m~t re~ive ~ written ~gr~val. O~ aD~Iy only to t~ sample teated and/or i~Dected, a~ are not i~icative of t~ quantities of a¢garently identical or REPORT NO. PAGE 2 SET NO. 2 111890 0/97 BY: Steve Long CONCRETE: 55 TICKET NO: 336276 of northwest building OMPRESSIVE STRENGTH (psi) REMARKS 2720 ding water after 3ject Manager d except in ri M~d reporta nil~f producte.