Loading...
Northlake 635(2)-LR 970206 (3)M~ TECHNOLOGIES INC REPORT OF IN-PLACE DENSITY CLIENT: Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARR~ MOON Dallas, TX 75201 PROJECT: COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX SERVICES: PROJECT NO.: 090,] REPORT NO.: 1119: DATE OF SERVICE: AUTHORIZATION: REPORT DATE: 2 / Perform in-place density and moisture content tests to d, of field compaction. CONTRACTOR: BUTLER CONSTRUCTION TEST OF: Storm drain fill** Storm drain fill** Storm drain fill** METHOD OF TEST: DENSITY: ASTM D2922 MOISTURE: ASTM D3017 PROJECT DATA MATERIALS 109289 Dark light brown clay 110197 Tan medium brown *** 109291 Gray weather **** M SPECIFICATION DENSITY: 95% Dry Density M TEST NO LOCATION 1. Line C between building A+B sta. #3+70, 1st lift. 2. Line C between building A+B sra. ~3+70, 2nd lift. 3. Line C between buildng A+B sta. #2+60, 1st lift. 4. Line B between building A+B sta. #2+60, 2nd lift. REPORT OF TESTS FIELD OPTIMUM I MOISTURE MOISTURE DI 25.0 24.0 20.4 20.0 1 27.1 * 18.5 18.7 18.5 I Report Of Tests Continued On Page 2 1007 FR im Tach. *Southwestem Labs 75 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 605034 ~9 L/30/97 )6/97 }termine the degree 31STURE/DENSITY RELATIONS 'TIMUM MAXIMUM :)ISTURE % DENSITY pcf 24.0 93.5 20.0 103.0 18.5 110.0 :)ISTURE: opt. moist +4 :IELD MAXIMUM !NSITY DENSITY DENSITY Pcfl (Pcf) (% max) }5.0 93.5 102 )1.8 103.0 99 }1.7 110.0 83 )7.7 110.0 98 Our lettm~ end report~ ~e fo~ the excJ~mive uae of t~ cl~ to w~ ~y we ~ ~ ~ ~t ~ ~ ~ exit in f~l wit~ ~ ~ptovd of ~ t~i~ Imb~et~. T~ ~ ~ ~e m~ relive ~ wrl~ ~rovm. u~ m~ tern ~ r~ ~ply ~y to t~ s~p~ t~ ~1~ i~ct~, ~ ~e ~t i~ic~Jve of t~ q~t~ of ~ently id~cd ~ Hmil~ pr~ucts. TEST NO 5. 6. 7. 8. 9. 10. 12. 13. 14. 15. 16. 1007 FR Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 1/30/97 REPORT OF TESTS (Cont1nued) LOCATION Line B south of building B sra. $1+80, 1st lift. Line B south of building B sta $1+80, 2nd lift. Line A east of building B sta. $3+25, 1st lift. Line A east of building B sra. $3+25, 2nd lift. Line A east of building B sra. $2+28, 1st lift. Line A east of building B sta. $2+25, 2nd lift. Storm drain in drive entrance east of building C. 1st. lift. Storm drain in drive entrance between bldg. B+C. 1st lift. Storm drain in drive entrance between bldg. A+B. 1st lift. 50'W 60'S of NE corner of building B, 2nd lift. 50'W 225'S of NE corner of NE corner of building B, 1st lift. 50'W 210' S of NE corner of building B. FIELD OPTIMUM MOISTURE MOISTURE {%) 27.6 24.0 19.2 18.5 27.9 24.0 20.0 18.5 26.5 24.0 20.9 18.5 26.8 24.0 25.1 24.0 24.6 24.0 20.3 20.0 20.8 20.0 21.2 20.0 50' W 175' S of NW corner of building B. 23.4 20.0 1 An asterisk (*) appears next to test results wi do NOT meet the project specifications as noted on Report Of Tests Continued On Page 3 f~l without the approval of the testing I~bO~ltO~y. The Lei of ~'n~le mu.t receive ou~ wrl[[en app ovM. M~f)Iy onJy to the samOle re.reel and/M inlpected, and ire not indicative of the qulntitiee of M~Mently identicM o, REPORT NO. PAGE 2 I~tELD MAXIMUM NSlTY DENSITY Pcf) {Pcf) t3.8 93.5 )6.6 110.0 ~4.8 93.5 )5.5 110.0 ~2.5 93.5 )4 · 9 110.0 ~2.1 93.5 )3.O 93.5 )3.8 93.5 )8.5 103.0 )9.4 103.0 )8.6 103.0 )l.l 103.0 ~ich page 1. 111929 DENSITY (% max) 100 97 101 96 99 95 99 99 100 96 97 96 98 Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 1/30/97 ADDITIONAL COMMENTS: Technician: REPORT OF TESTS **and sewer in building. ***dark brown clay with gray limestone. **** limestone. Steve Long Technician Started: 02:00PM Stopped: 05:00PM REPORT NO. 111929 PAGE 3 Report Distribution: MAXIM TE( :H. ~)UT~ LABS (1) Lincoln Property Co. (1) BUTLER CO.STRUCTIO. [.CORP. (1) BROCKETT-DAVIS-DRAKE, INC. (1) THE CITY OF COPPELL / ~~c~en, B.S. Ch.m.. (1) THE CITY OF COPPELL ~ /~"'P~o4ect Manaaer (1) O'BRIEN ASSOCIATES, INC. 1007 FR Ou~ h~er~ ~d re~o~ me f0~ the exdumve ,u,, .,,,,,o,,, ,,,...,o,,. ,,, ,he ,-,.,.,.~-.,0,... ~ - o,..~. -,,. ,,,.~ ..... ? ~ ?,,-.,,_?. ~2..'~ .... ,=uu:,.. /