Loading...
Northlake 635(4)-LR000908 (2) GEO~'ECHNICALAND ~ R r"l I I F=~ ENVIRONMENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Coppell Tech Center II Lakeshore Drive and Crestside Coppell, Texas REPORTED TO: Bob Moore Construction Co. REPORT NO. 7 1110 N. Watson Road REPORT DATE: 09-08-00 Arlington, Texas 76011 REG PROJECT NO. 7044 ATTN: Mr. Ed T. McGuire TECHNICIAN: F. Thornton & P. Olegario & R. Hollings PAGE: 1 of 1 CONTRACTOR: Bob Moore Construction Co. On these dates a representative of Reed Engineering Group, Inc. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification InjeCtion Depth I Injection Spacing I Injection Pressure Injection Intervals (ft) I (ft)I (psi) (in) 10 5 100-200 12-18 Equipment Number of I Number of Probes I Length of Probes Probe Spacing Rigs i (ea) I (ft) (ft) 3 4 13 5 Date I Area Injected (sq ft) I Average Pressure (psi) Pass No. 09-01-00 13,540 125 1 33,600 105 4 09-02-00 31,000 125 4 Surfactant added at regular intervals: Yes Mail Submitted by: Distribution: (1) Bob Moore Construction Co./ Mr. Ed T. McGuire REED ENGINEERING GROUP, INC. (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Original Signed By (1) McHale Consulting Engineering/ Mr. Gary McHale James F. Phipps, P.E. (1) CMC-Commercial Realty/ KNcg Mr. Steve Huff 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · :AX [214] 350 0019