Northlake 635(2)-LR 970206 (5)Maxi 25 TECHNOLOGIES INC CLIENT: PROJECT: SERVICES: REPORT OF DRILLED PIER INSPECTION Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PROJECT NO.: 0903 REPORT NO.: 1121.' DATE OF SERVICE: AUTHORIZATION: REPORT OATE: 2 / Perform Drilled Pier Inspection. REPORT OF TESTS On this date, a Maxim Technologies representative arrived ~ scheduled to perform Drilled Pier Inspection. See attached of the inspection. Time: 7:00 am - 6:30 pm Technician: Abdullah Ethem Technician Report Distribution: MAXIM TE{ (1) Lincoln Property Co. (1) BUTLER CONSTRUCTION [NCORP. ~ (1) BROCKETT-DAVIS-DRAKE. INC. ~ (1) THE C[TY OF COPPELL / -~ (1) THE CITY OF COPPELL .~-~., ,, ~ ap~y ~y ~o t~ s~e t~ ~/~ i~, ~ Me ~t i~lc~ve of t~ qu~ ~P Y Tech. ·Southwestem Labs Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 605034 ~9 !/03/97 )6/97 >n site as for the results :H.~ LABS ~faL~ken, B.S. Ch.E. roject Manager ~ ex~ ~n mmil~ products. TECHNOLOGIES INC LINCOLN PROPERTY COMPANY Project N~:0903605034 Service Date:2/03/9? 2575 Lone Star Drive · P.O. Box 224227 · Dallat Texas 75222 (214) 631-2700 · Fax (214) 920-189 DRILLED PIER INSPECTION (STRAIGHT SHAFT) Report N~: 112139 Page 2 of 4 Date Drilled: 2/03/97***OBSERVATION OF DRILLED FOUNDATION CONSTRUCTION*** Pier identification A/4.5 A/5.0 A/5.5 Al6.0 A/6.5 A/7.0 A/7.5 Pier diameter(in) 24 24 24 24 24 24 24 Depth of pier from surface(fa) 34.5 32.2 35.0 32.5 34.2 33.2 32.0 Depth bearing stratum from surface(ft) 27.0 26.0 27.5 26.0 28.0 27.0 26.0 Required penetration(fa) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Actual penetration(ft)* 7.5 6.2 7.5 6.5 6.2 6.2 6.0 Condition of bottom(wet/dry) WET WET WET WET WET WET WET Plumb within tolerance(yes/no) YES YES YES YES YES YES YES # of bars/Reinforcing bar size(//) 6///6 61//6 6///6 6///6 6///6 6///6 61#6 Length of reinforcing steel(fO 33.4 31.0 34.0 31.5 33.2 32.3 31.2 Time drilling was completed(am/pm) 10:00a 10:20a 10:50a 11:45a 1:25p 2:00p 2:25p Time concrete was placed(am/pm) 10: 35a 10:50a 11:00a° 12:20p 1:40p 2:10p 2:40p Depth of pier from top of concrete(fO 33.8 31.5 34.3 31.8 33.5 32.7 31.5 Elevation:Top of pier {fa)** 98.0 98.0 98.0 98.0 98.0 98.0 98.0 Elevation:Bottom pier (ft)** 64.2 66.5 63.7 66.2 64.5 65.3 66.5 Elevation: Top of bearing stratum(ft)* · 71.7 72.7 71.2 72.7 70.7 71.5 72.5 Bearing stratum (Description) DARK GRAY SHALE NOTE: TIME: SEE REPORT # 112140 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. ELEVATION BY OTHERS 7:00 A.M. TO 6:30 P.M. Our letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced excap laboratory. The use of our name must receive prior written approval of Maxim Technologies, ]nc. Letters and reports apply and are not indicative of the quantity of apparently identical or similar products. I in full without the approval of the testing )nly to the sample tested and/or inspected TiCNli OLOII El BIIC LINCOLN PROPERTY COMPANY Project N~:0903605034 Scrvi~ Date:2/03/9? 2575 Lone Star Drive · P.O. Box 224227 · Dallas Texas 75222 (214) 531-2700 · Fax (214} 920-189 DRILLED pI'F.R INSPECTION (STRAIGHT SHAFD Report N°: 112139 Page 3 of 4 Date Ddlled: 2/03/97***OBSERVATION OF DRILLED FOUNDATION CO1 q'STRUCTION*** Pier identification A/7.8 A/8.0 A/8.4 A/8.5 ! A/8.9 A. 1/8.0 A.1/8.4 Pier diameter(in) 24 24 24 24 24 18 18 Depth of pier from surface{ft) 32.0 33.0 34.5 33.5 32.5 33.5 34.2 Depth bearing stratum from surface{ft} 25.5 25.8 28.0 27.4 25.5 27.0 27.4 Required penetration{ft) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Actual penetration(ft)* 6.5 7.2 6.5 6.2 7.0 6.5 6.8 Condition of bottom(wet/dry) DRY DRY DRY DRY WET WET WET Plumb within tolerance(yes/no) YES YES YES YES YES YES YES //of bars/Reinforcing bar size(//) 6///6 6///6 6///6 6///6 6///6 41//5 4///5 Length of reinforcing steel(ft) 31.4 31.7 34.2 32.8 31.7 32.7 33.4 Time drilling was completed(am/pm) 2:50p 3:50p 4:15p 4:30p 5:00p 2:10p 2:45p Time concrete was placed(am/pm) 3:00p 4:10p 4:25p ° 4:50p 5:10p 2:30p 3:30p Depth of pier from top of concrete(ft) 31.7 33.0 34.5 33.2 32.0 33.0 33.7 Elevation:Top of pier (ft}** 98.0 98.0 98.0 98.0 98.0 98.0 98.0 Elevation:Bottom pier (ft)·* 66.3 65.0 63.5 64.8 66.0 65.0 64.3 Elevation: Top of bearing stratum(ft)*' 72.8 72.2 70.0 71.0 73.0 71.5 71.1 Bearing stratum (Description) DARK GRAY SHALE NOTE: TIME: SEE REPORT # 112140 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. ELEVATION BY OTHERS 7:00 A.M. TO 6:30 P.M. Our letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced except laboratory. The use of our name must receive prior written approval of Maxim Technologies. Inc. Letters and reports apply gl and ara not indicative of the quantity of apparently identical o~ similar products. full without the epproval of the testing tly to the sample tested and/or inspected TECHIIOLOIIEI INC LINCOLN PROPERTY COMPANY Project N~:0903605034 Service Date:2/03/97 2575 LOne Star Drive · P.O. Box 224227 · Dallas Texas 75222 (214) 631-2700 * Fax (214) 920-189 DRILLED PIF~R INSPECTION (STRAIGHT SHAVF) Report Na: 112139 Page 4 of 4 Date Drilled: 2/03/97***OBSERVATION OF DRILLED FOUNDATION CO! ISTRUCTION*** Pier identification A. 1/8.7 A.511.1 A.311.1 A.1/1.2 A.1/1.5 A.111.7 A.112.0 Pier diameter(in) 18 18 18' 1833 18.518 18 Depth of pier from surface(ft) 32.7 34.0 34.0 33.1 33.5 33.6 Depth bearing stratum from. surface(ft) 25.5 27.4 28.0 26.5 27.0 27.0 26.7 Required penetration(ft) 6.0 6.0 6.0 6.016.6.0 6.0 6.0 Actual penetration(ft)* 7.2 6.6 6.0 6.6 16.5 6.5 6.9 Condition of bottom(wet/dry) WET DRY DRY WETt/vET WET WET Plumb within tolerance(yes/no) YES YES YES YES ~Y[!S YES YES # of bars/Reinforcing bar size(#) 41#5 4/#5 4t#5 41#5Il#5 4/#5 4/#5 Length 'of reinforcing steel(ft) 31.9 33.1 33.2 32.4 132.7 32.6 32.8 Time drilling was completed(am/pm) 2:30p 5:00p 3:15p 3:40p [4:00p 3:00p 4:15p / Time concrete was placed(am/pm) 2:55p 5:30p 3:40p 4:00p ~4:10p 4:15p 4:30p Depth of pier from top of concrete(ft) 32.2 33.5 33.5 32.6 133.0 33.0 33.1 Elevation:Top of pier (ft)** 98.0 98.0 98.0 98.0 p;.O 98.0 98.0 Elevation:Bottom pier (ft)** 65.8 64.5 64.5 65.4f15.0 65.0 64.9 Elevation: Top of bearing stratum(ft)** 73.0 71.1 70.5 72.0 .5 71.5 71.8 Bearing stratum (Description) DARK GRAY SHALE NOTE: TIME: SEE REPORT// 112140 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. ELEVATION BY OTHERS 7:00 A.M. TO 6:30 P.M. Our letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced excep! laboratory. The use of our name must receive prior written approval of Maxim Technologies, Inc. Letters and reports apply c and are not indicative of the quantity of apparently identical or similar products. in full without the approval of the testing nly to the sample tested and/or inspected