Loading...
Northlake 635(2)-LR 970204 (3)Max 2E TECHNOLOGIES INC REPORT OF IN-PLACE DENSITY CLIENT: Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 PROJECT: COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PROJECT NO.: 090." REPORT NO.: 1112 DATE OF SERVICE: AUTHORIZATION: REPORT DATE: 2/, SERVICES: Perform in-place density and moisture content tests to d, of field compaction. CONTRACTOR: BUTLER CONSTRUCTION TEST OF: BUILDING B PAD FILL. PROJECT DATA MATERIALS 110175 LIGHT BROWN CLAY SAND WITH GRAVEL. M METHOD OF TEST: DENSITY: ASTM D2922 MOISTURE: ASTM D3017 SPECIFICATION DENSITY: 95% MIN. DENSITY. M TEST NO LOCATION 1. GRIDLINES D/2 BUILDING B, 1ST LIFT. (RETEST) 2. GRIDLINES D/5 BUILDING B lST LIFT. (RETEST) 3. GRIDLINES D/8 BUILDING B, 1ST LIFT. (RETEST) 4. E.5/8.0 BUILDING B, 1ST LIFT. (RETEST) REPORT OF TESTS FIELD OPTIMUM MOISTURE MOISTURE (%) (%) 12.8 10.5 10.6 10.5 10.5 10.5 11.2 10.5 Report Of Tests Continued On Page 2 1OO7 DY im Tach. · Southwestern Labs 75 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: {214) 920-1891 605034 ?0 [/18/97 )4/97 ~termine the degree DISTURE/DENSITY RELATIONS =TIMUM MAXIMUM OISTURE % DENSITY pcf 10.5 125.0 01STURE: OPT. +3% :IELD MAXIMUM :NSITY DENSITY DENSITY [Pcf) {Pcf) {% max) 21.6 125.0 97 [8.8 125.0 95 21.5 125.0 97 [9.6 125.0 96 Our letters and reports are for the exclusive use of the client to whom they are ad~reesed arid shall net be. re~orod, L ced except in full without the approval of the testin~ laboratory. The u~e of ourname must receive our written approval, uur la :tare ertl reports apply only to the sample {iested end/or insoected, and are not indicative of the Quantities of a0parently identical or similar ~roducts. Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 1/18/97 REPORT OF TESTS (Continued) FIELD OPTIMUM TEST MOISTURE MOISTURE NO LOCATION (%) (%) 5. E.5/5.0, BUILDING B, 1ST LIFT. (RETEST) 10.8 10.5 1 6. E.5/2.0 BUILDING B, lST LIFT. (RETEST) 13.5 10.5 1 7. A.5/2.5 BUILDING B, 2ND LIFT. FINAL. 7.2 * 10.5 1 8. A.5/5.0 BUILDING B, 2ND LIFT, FINAL. 7.1 * 10.5 1 9. A.5/7.5 BUILDING B, 2ND LIFT, FINAL. 9.3 * 10.5 1 An asterisk (*) appears next to test results w do NOT meet the project specifications as noted on ADDITIONALCOMMENTS: DENSITY TESTS RESULTS OVER 102.0 MAY BE DUE TO A MISMATCH OVERCOMPACTION. Technician: Steve Long Technician Started: 09:00AM Stopped: ll:30AM Report Distribution: (1) Lincoln Pr'opert¥ Co. ~MAXIM T_F.J (1) BUTLER CONSTRUCTION [NCORP. (1) 8ROCKETT-DAVIS-ORAKE, INC. ~ (1) THE CITY OF COPPELL '~ ( '- -' (1) THE CITY OF COPPELL ~__~...~.../~,~ 1007 DY Our leffarl and repo~s are for the exc c~ive use of the client to whom they are Iddre#ed futl without the approvll of the tel,lng laboratory. The u/e of oumame muir race,va our written approval, uur · apply only to the sample te~ted and/or inspected, and are not indicative of the quantities of apparently identical or REPORT NO. 111270 PAGE 2 · 'IELD MAXIMUM [NSITY DENSITY DENSITY [Pcf) (Pcf) (% max) L9.0 125.0 95 21.4 125.0 97 30.7 125.0 105 23.6 125.0 99 )~0.7 125.0 97 ~ich page 1. MATERIAL OR .~J?~n, B.S. Ch.E. ~o]ect Manager ced except in /ere M~i ,eporta similu products.