Northlake 635(2)-LR 970204 (3)Max
2E
TECHNOLOGIES INC
REPORT OF
IN-PLACE DENSITY
CLIENT:
Lincoln Property Co.
500 N. AKARD, SUITE 3300
ATTN: LARRY MOON
Dallas, TX 75201
PROJECT:
COPPELL BUSINESS CENTER
WRANGLER DR. & BELTLINE RD.
COPPELL, TX
PROJECT NO.: 090."
REPORT NO.: 1112
DATE OF SERVICE:
AUTHORIZATION:
REPORT DATE: 2/,
SERVICES:
Perform in-place density and moisture content tests to d,
of field compaction.
CONTRACTOR: BUTLER CONSTRUCTION
TEST OF: BUILDING B PAD FILL.
PROJECT DATA
MATERIALS
110175 LIGHT BROWN CLAY SAND
WITH GRAVEL.
M
METHOD OF TEST:
DENSITY: ASTM D2922
MOISTURE: ASTM D3017
SPECIFICATION
DENSITY: 95% MIN. DENSITY.
M
TEST
NO LOCATION
1. GRIDLINES D/2 BUILDING B,
1ST LIFT. (RETEST)
2. GRIDLINES D/5 BUILDING B
lST LIFT. (RETEST)
3. GRIDLINES D/8 BUILDING B,
1ST LIFT. (RETEST)
4. E.5/8.0 BUILDING B, 1ST LIFT.
(RETEST)
REPORT OF TESTS
FIELD OPTIMUM
MOISTURE MOISTURE
(%) (%)
12.8 10.5
10.6 10.5
10.5 10.5
11.2 10.5
Report Of Tests Continued On Page 2
1OO7 DY
im Tach. · Southwestern Labs
75 Lone Star Dr. · P.O. Box 224227
Dallas, Texas 75222
Telephone: (214) 631-2700
FAX: {214) 920-1891
605034
?0
[/18/97
)4/97
~termine the degree
DISTURE/DENSITY RELATIONS
=TIMUM MAXIMUM
OISTURE % DENSITY pcf
10.5 125.0
01STURE: OPT. +3%
:IELD MAXIMUM
:NSITY DENSITY DENSITY
[Pcf) {Pcf) {% max)
21.6 125.0 97
[8.8 125.0 95
21.5 125.0 97
[9.6 125.0 96
Our letters and reports are for the exclusive use of the client to whom they are ad~reesed arid shall net be. re~orod, L ced except in
full without the approval of the testin~ laboratory. The u~e of ourname must receive our written approval, uur la :tare ertl reports
apply only to the sample {iested end/or insoected, and are not indicative of the Quantities of a0parently identical or similar ~roducts.
Lincoln Property Co.
PROJECT NO. 0903605034
DATE OF SERVICE: 1/18/97
REPORT OF TESTS (Continued)
FIELD OPTIMUM
TEST MOISTURE MOISTURE
NO LOCATION (%) (%)
5. E.5/5.0, BUILDING B, 1ST LIFT.
(RETEST) 10.8 10.5 1
6. E.5/2.0 BUILDING B, lST LIFT.
(RETEST) 13.5 10.5 1
7. A.5/2.5 BUILDING B, 2ND LIFT.
FINAL. 7.2 * 10.5 1
8. A.5/5.0 BUILDING B, 2ND LIFT,
FINAL. 7.1 * 10.5 1
9. A.5/7.5 BUILDING B, 2ND LIFT,
FINAL. 9.3 * 10.5 1
An asterisk (*) appears next to test results w
do NOT meet the project specifications as noted on
ADDITIONALCOMMENTS:
DENSITY TESTS RESULTS OVER 102.0 MAY BE DUE TO A MISMATCH
OVERCOMPACTION.
Technician: Steve Long
Technician
Started: 09:00AM
Stopped: ll:30AM
Report Distribution:
(1) Lincoln Pr'opert¥ Co. ~MAXIM T_F.J
(1) BUTLER CONSTRUCTION [NCORP.
(1) 8ROCKETT-DAVIS-ORAKE, INC. ~
(1) THE CITY OF COPPELL '~ ( '- -'
(1) THE CITY OF COPPELL ~__~...~.../~,~
1007 DY Our leffarl and repo~s are for the exc c~ive use of the client to whom they are Iddre#ed
futl without the approvll of the tel,lng laboratory. The u/e of oumame muir race,va our written approval, uur ·
apply only to the sample te~ted and/or inspected, and are not indicative of the quantities of apparently identical or
REPORT NO. 111270
PAGE 2
· 'IELD MAXIMUM
[NSITY DENSITY DENSITY
[Pcf) (Pcf) (% max)
L9.0 125.0 95
21.4 125.0 97
30.7 125.0 105
23.6 125.0 99
)~0.7 125.0 97
~ich
page 1.
MATERIAL OR
.~J?~n, B.S. Ch.E.
~o]ect Manager