Loading...
Northlake 635(2)-LR 970203 (3)Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 1/24/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Cont i nued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 5" METHOD OF TEST: ASTM C-39 PROJECT DATA MIX DESIGN NUMBER: 9349 DATE OF PLACEMENT: 1/2 TIME SAMPLED: 11: 48AM TEMPERATURE ( I F) - AIR: 58 TRUCK NO: 87 AIR CONTENT(%): N/A LOCATION OF PLACEMENT: 38' North of south, CYLINDER MEASURED MARKED SLUMP DATE gET NO. (inches) TESTED 2 1 5.50 1/31/97 2 2 5.50 1/31/97 2 3 2/21/97 2 4 2/21/97 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM AGE DIAMETER AREA LOAD (days) (in,) (sq.in.} (lbs. force) 7 6.00 28.27 1%6440 7 6.00 28.27 118530 28 28 Technician: Ronnie Lauderdale Technician Report Of Tests Continued On Page 3 1001 LW REPORT NO. PAGE 2 SET NO. 2 111608 4/97 BY: Ronnie Lauderdale CONCRETE: 67 TICKET NO: 334454 20' west of east 3MPRESSIVE STRENGTH (psi) 4120 4190 REMARKS Our letters a~l reports are for the exclusive use of the client to whm"n they are addressed a~l I1~11 not ~ re~uc~ d except in full without ~ approval of t~ t~ti~ I~orato~. ~ m of o~nlme m~t receive our written approvM. O~ le~l m ~ repo~ aDpty only to t~ sempte teated a~/or i~pected, a~ are not i~icative of t~ qu~titi~ of apparently identical or si, nilar pr~ucte. Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 1/24/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Con~ i hued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 5" METHOD OF TEST: ASTM C-39 PROJECT DATA MIX DESIGN NUMBER: 9349 DATE OF PLACEMENT: 1/2, TIME SAMPLED: 12: 20PM TEMPERATURE ( I F) - AIR: 53 TRUCK NO: 728 AIR CONTENT(%): N/A LOCATION OF PLACEMENT: 60' North of south, CYLINDER MEASURED MARKED SLUMP DATE SET NO~ {inches) TESTED 3 1 5.00 1/31/97 3 2 5.00 1/31/97 3 3 2/21/97 3 4 2/21/97 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM AGE DIAMETER AREA LOAD {days) (in.) (sq.in.) (lbs. force) 7 6.00 28.27 12p380 7 6.00 28.27 116370 28 28 Technician: Ronnie Lauderdale Technician Report Of Tests Continued On Page 4 1001 LW REPORT NO. PAGE 3 SET NO. 3 111608 [/97 BY: Ronnie Lauderdale CONCRETE: 67 TICKET NO: 334460 5' west of east MPRESSIVE ;TRENGTH {psi) 4260 4120 REMARKS Our letters and reports are for the exclusive use of the client to whom they ate ~ddre~ed ~ shell not be repro4uce I ex.pt in full without t~ approval of t~ t~ti~ laboratory. T~ ~ of o~name m~t receive our written epDrovel. Our le~te s ~ re~o~s apply only to t~ sample t~ted a~/or i~pected, a~ are not i~Jcative of the quantities of appuently identicN or sir til~ pr~ucts. Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 1/24/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH ( Cent i nued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000pal @ 28 DAYS SLUMP: 5" METHOD OF TEST: ASTM C-39 PROJECT DATA MIX DESIGN NUMBER: 934c~ DATE OF PLACEMENT: TIME SAMPLED: 01: 40PM TEMPERATURE ( I F) - AIR: 66 TRUCK NO: 512 AIR CONTENT(%): N/A LOCATION OF PLACEMENT: 80' North of south, CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 4 1 5.50 1/31/97 4 2 5.50 1/31/97 4 3 2/21/97 4 4 2/21/97 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM AGE DIAMETER AREA LOAD (days) (in.) (sq.in.) (lbs. force~ 7 6.00 28.27 1~2600 7 6.00 28.27 132680 28 28 Technician: Ronnie Lauderdale Technician Report Of Tests Continued On Page 5 1001 LW REPORT NO. PAGE 4 SET NO. 4 111608 4/97 BY: Ronnie Lauderdale CONCRETE: 71 TICKET NO: 334469 45' west of east 0MPRESSIVE STRENGTH (psi) 4340 4690 REMARKS Our letters and reports ere for the exclusive use of the client to whom they are addressed and shall not be reproduc( d except irt full without the approval of the tearing let)oratory. The ule of ournamo mu~t receive ou~ written approval. Our loft( ri end rep~tl apply only ;o the sample te~ted al3d/or inspected, and are not indicative of the quentitie~ of &pp~entJy identica~ or si nilar productl. Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 1/24/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH ( Cont i nued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 5" METHOD OF TEST: ASTM C-39 PROJECT DATA MIX DESIGN NUMBER: 9349 DATE OF PLACEMENT: 1/2 TIME SAMPLED: 02:38PM TEMPERATURE ( I F) - AIR: 73 TRUCK NO: 390 AIR CONTENT(%): N/A LOCATION OF PLACEMENT: 60' South of north, CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 5 1 5.00 1/31/97 5 2 5.00 1/31/97 5 3 2/2i/97 5 4 2/21/97 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM AGE DIAMETER AREA LOAD (days) (in.) (sq.in.) (lbs. force) 7 6.00 28.27 1%9760 7 6.00 28.27 118050 28 28 Technician: Ronnie Lauderdale Technician Report Of Tests Continued On Page 6 1001 LW REPORT NO. PAGE 5 SET NO. 5 111608 4/97 BY: Ronnie Lauderdale CONCRETE: 78 TICKET NO: 335993 30' east of west OMPRESSIVE STRENGTH (psi) 4240 4170 REMARKS Our letter~ end reports ere for the exclusive u~e of the client to whom they ere addressed and shall no{ be rej0roducl d except in full without the approval of the te~ting laboratory. The use of ourname must receive our written approval. Our {att4 rs and reports apply onty to the sample tested and/or inspected, and are not indicative of the quantities of apparently identical or si miler products. Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 1/24/97 CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 5" METHOD OF TEST: ASTM C-39 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Cent i hued) CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inchas) TESTED PROJECT DATA MIX DESIGN NUMBER: 9349 DATE OF PLACEMENT: 1/2 TIME SAMPLED: 04: 05PM TEMPERATURE ( I F) - AIR: 60 TRUCK NO: 120 AIR CONTENT(%): 1.5 LOCATION OF PLACEMENT: 30' South of north, 6 1 5.00 1/31/97 6 2 5.00 1/31/97 6 3 2/21/97 6 4 2/21/97 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM AGE DIAMETER AREA LOAD (days) (in.) {sq.in.I {lbs. force~ 7 6.00 28.27 1%6660 7 6.00 28.27 117180 28 28 ADDITIONALCOMMENTS: Fifteen gallons of water added Technician: Ronnie Lauderdale Technician Report Of Tests Continued On Page 7 1001 LW REPORT NO. PAGE 6 SET NO. 6 111608 4/97 BY: Ronnie Lauderdale CONCRETE: 76 TICKET NO: 336011 10' east of west C)MPRESSIVE STRENGTH (psi) 4130 4140 REMARKS Our letters and reports are fro' the exclusive use of the client to whom they are eddreued and shall not be reproduc; d except in full without the approval of the testing laboratory. The ule of ourneme must receive our written approval. Our lett~ re end reports ao~ly only to the semele tested and/or ir~)ected, and are not indicative of the quantities of apparently ~dentical or si miler 13roducts. Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 1/24/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000pa£ @ 28 DAYS SLUMP: 5" METHOD OF TEST: ASTH C-39 PROJECT DATA MIX DESIGN NUMBER: 934g DATE OF PLACEMENT: 1/2 TIME SAMPLED: 04: 50PM TEMPERATURE ( I F) - AIR: 71 TRUCK NO: 736 AIR CONTENT(%): 2.0 LOCATION OF PLACEMENT: 80' East of west, 30 CYLINDER MEASURED MARKED SLUMP DATE SET NO. {inches) TESTED 7 1 5.00 1/31/97 7 2 5.00 1/31/97 7 3 2/21/97 7 4 2/21/97 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM AGE DIAMETER AREA LOAD {days) (in.) {sq.in.) {lbs. force) 7 6.00 28.27 196200 7 6.00 28.27 107640 28 28 Technician: Ronnie Lauderdale Technician Report Of Tests Continued On Page 8 1OO1 LW REPORT NO. PAGE 7 SET NO. 7 111608 4/97 BY: Ronnie Lauderdale CONCRETE: 78 TICKET NO: 334495 south of north MPRESSIVE STRENGTH (psi) 3760 3810 REMARKS Ou~ lettere and reportl are for the excluaive u~e of the client to whom they ere addreaeed ~ ~ell ~t ~ r~r~ucl ~ ~ in full witho~ t~ approval of t~ t~ti~ laboratory, T~ ~ of ~nlme m~t re~ive ~ written aeprovN. O~ I~e ~ ~ re0o~l apply only to t~ s~ple test~ a~/or im~ct~, a~ are not i~icative of t~ quantiti~ of aopMently idenficN or sil ~ilar ~uct8. Lincoln Prope=ty Co. PROJECT NO. 0903605034 DATE OF SERVICE: 1/24/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) PROJECT DATA CONTRACTOR: BUTLER CONSTRUCTION MIX DESIGN NUMBER: 934c. CONCRETE SUPPLIER: PIONEER DATE OF PLACEMENT: 1/2 PLANT: 29 TIME SAMPLED: 06:00PM SPECIFICATION REQUIREMENTS TEMPERATURE ( I F) - AIR: 7(~ STRENGTH: 4000psi @ 28 DAYS TRUCK NO: 87 SLUMP: 5" AIR CONTENT(%): 1.5 METHOD OF TEST: ASTM C-39 LOCATION OF PLACEMENT: 10' West of east, 5 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches} TESTED REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM AGE DIAMETER AREA LOAD (days) {in.} (sq.in.) (lbs. force} 8 1 5.00 1/31/97 7 6.00 28.27 150430 8 2 5.00 1/31/97 7 6.00 28.27 118050 8 3 2/21/97 '28 8 4 2/21/97 28 Technician: Ronnie Lauderdale Technician Report Distribution: (1) Lfnco[n Property Co. MAXI~ (~) BUTLER CONSTRUCTION INCORP. //~ (1) BROCKETT-DAVIS-DRAKE, INC. / /~ . (1) THE CITY OF COPPELL / ~/'~ Cl) THE CZTY OF COPPELL // ~'"~C~ (1) O'BRIEN ASSOCIATES, INC. / / ~'~ Pr 1001LW I IV f w Our letterl ~ repo~e are for the exc ua' · u~e o the client to hem they a~al~r~ed and ~l~J~net be reproducl f~l wl~o~ t~e approvN of the tNting laboratory. The u~e of ourname m~t re~ive our wri~"n epprovN. Our lett* apply only to the sample t~ted and/or inspected, and are not inaicative of the quantities of apparently identical or REPORT NO. PAGE 8 SET NO. 8 111608 4/97 BY: Ronnie Lauderdale CONCRETE: 73 TICKET NO: 334503 south of north OMPRESSIVE STRENGTH (psi) 4260 4170 REMARKS N LABS -~T-acken, B. S. ~ject Manager d ex.pt in Ch. E. TECHNOLOGIES INC MaxJ 25~ REPORT OF CONCRETE COMPRESSIVE STRENGTH CLIENT: Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 PROJECT: COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PROJECT NO.: 09031 REPORT NO.: 11160 DATE OF SERVICE: 1 AUTHORIZATION: REPORT DATE: 2/0 SERVICES: Test compressive strength specimens prepared in conjuncti inspection. CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 5" METHOD OF TEST: ASTM C-39 PROJECT DATA MIX DESIGN NUMBER: 9349 DATE OF PLACEMENT: 1/2 TIME SAMPLED: 10: 302~[ TEMPERATURE (°F) - AIR: 55 TRUCK NO: 654 AIR CONTENT(%): 2.0 LOCATION OF PLACEMENT: 10' East of west, 5' CYLINDER MEASURED MARKED SLUMP DATE SET NO. {inches) TESTED 1 1 5.00 1/31/97 1 2 5.00 1/31/97 1 3 2/21/97 1 4 2/21/97 28 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM AGE DIAMETER AREA LOAD {days) (in.) (sq.in.) (Ibs. force) 7 6.00 28.27 123320 7 6.00 28.27 126940 28 CI ADDITIONAL COMMENTS: Twenty gallons of water added Technician: Ronnie Lauderdale Technician Report Of Tests Continued On Page 2 1001 LW ~ Tach. · Southwestern Labs '5 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: {214) 920-1891 i05034 /24/97 3/97 Dn with concrete ~/97 BY: Ronnie Lauderdale CONCRETE: 65 TICKET NO: 334439 north of south )MPRESSIVE ;TRENGTH lpsi) 4360 4490 REMARKS Our letters snd reports ere fo~ the exclusive uss of the client to whom they ars addressed end ~hall not be roproduce~ i exciter in full without the approval of the testing laboratory. The u~ of ourneme must receive our written approval. Our lettel I ~ reports al3ply only to the simple tested and/or ir~pected, end lire not indicative of the qusntitiea of &pps~'ently identical or sin ~ilar products.