Loading...
Northlake 635(2)-LR 970203 (4)Max TECHNOLOGIES INC CLIENT: PROJECT: SERVICES: REPORT OF DRILLED PIER INSPECTION Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PROJECT NO.: 0903 REPORT NO.: 1119! DATE OF SERVICE: AUTHORIZATION: REPORT DATE: 2 / Drilled Pier Inspection. REPORT OF INSPECTION On this date, a Maxim Technologies representative arrived ¢ scheduled to perform a Drilled Pier Inspection. See attache results of the inspection. Time: 6:30 am - 3:30 pm Technician: Abdullah Ethem Technician Report Distribution: ~a~a~tM~ (1) Lfncotn Property Co. ~ (1) BUTLER CONSTRUCT]ON INCORP. (1) BROCKETT-DAVIS-DRAKE, INC. (1) THE CITY OF COPPELL (1) THE CITY OF COPPELL 1099 FR OW leKem ~¢1 report~ ee f~ the ~d~i~ u~ of the ~ient to w~ ~y ~e ~ ~ ~ ~ ~ ~ fall wi~ t~ ep~ovd ~ h t~i~ I~. T~ ~ of ~ m~ r~v~ ~ wrl~ ~o~d. ~ ~ rm Tach. ,, Southwestem Labs 75 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 605034 ~2 ./31/97 ~3/97 ,n site as ~d report for the ~m~ken, B.S. Ch.E. oject Manager KI ex~ in mile TS'C H IIG LOll, I ES INC LINCOLN PROPERTY CO. Project Nn:0903605034 Service Date.' 1/31/97 2575 Lone Star Drive · P.O. Box 224227 * Dali8 ~, Texas 75222 (214) 631-2700 * Fax (214) 920-18~.~1 DRILLED p1F~R INSPECTION (STRAIGHT SHAFT) Report Nh: 111982 Page 2 of 3 Date Drilled: 1/31/97***OBSERVATION OF DRILLED F()UNDATION CO NSTRUCTION*** Pier identification Fl1.0 A.5/1.0 Al1.0 Al1.5 A/1.7 Al2.0 A/2.2 Pier diameter(in) 24 24 24 24 24 24 24 Depth of pier from surface(ft) 31.4 35.3 35.2 34.0 34.5 35.0 34.3 Depth bearing stratum from surface(ft) 25.0 28.0 28.3 27.0 27.4 28.2 28.0 Required penetration(ft) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Actual penetration(ft)* 6.4 7.3 6.9 7.0 7.1 6.8 613 Condition of bottom(wet/dry) WET DRY WET WET WET WET WET Plumb within tolerance(yes/no) YES YES YES YES YES YES YES //of bars/Reinforcing bar size(//) 6///6 6///6 61//6 6///6 6///6 6///6 61//6 Length of reinforcing steel(ft) 30.5 34.0 33.8 33.7 34.2 34.5 33.7 Time drilling was completed(am/pm) 8:30a 8:25a 8:55a 9:20a 9:50a 10:20a 10:55a Time concrete was placed(am/pm) 8:40a 8:45a 9:10a' 9:30a 9:55a 10:35a 11:30a Depth of pier from top of concrete(ft) 30.9 34.3 34.2 34.0 34.5 35.0 34.3 Elevation:Top of pier (ft)** 95.5 98.0 98.0 98.0 98.0 98.0 98.0 Elevation:Bottom pier (ft)** 64.6 63.7 63.8 64.0 63.5 63.0 63.7 Elevation: Top of bearing stratum(ft)** 71.0 71.0 70.7 71.0 70.6 69.8 70.0 Bearing stratum (Description) DARK GRAY SHALE NOTE: SEE REPORT # 111983 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. · ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. · · ELEVATION BY OTHERS TIME: 6:30 A.M. TO 3:30 P.M. Our letters and reports are for the exclusive u~e of the client to whom they are addressed and shall not be reproduced excer t in full without the approval of the testing laboratory. The uae of our name rnu~ receive prior written approval of Maxim Technologies, Inc. Letters and reports apply =nly to the sample teated and/or irmpeoted and are not indicative of the quantity of apparently identical or similar product~. TECll N QLOI~I El, LINCOLN PROPERTY CO. Project Na:0903605034 Service Date: 1/31/97 Date Drilled: 2575 Lone Star Drive · P.O. Box 224227 · Dall~ ,, Texas 75222 (214) 631-2700 * Fax (214) 920-18)1 DRILLED PIER INSPECTION (STRAIGHT SHAFT) 1/31/97***OBSERVATION OF DRII.IJED FOUNDATION CC Report Na: 111982 Page 3 of 3 ~NSTRUCTION*** Pier identification A/2.5 A/3.0 A/3.5 A/4.0 A. 1/8.5 A.2/8.8 A.5/8.8 Pier diameter(in) 24 24 24 2432 18.3 18 18 Depth of pier from surface(ft) 35.4 34.0 36.6 34.1 34.8 34.2 Depth bearing stratum from surface(ft) 29.0 27.5 30.0 28.0 26.3 28.0 27.4 Required penetration(ft) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Actual penetration(ft)* 6.4 6.5 6.6 6.1 6.0 6.8 6.8 Condition of bottom(wet/dry) WET WET DRY DRY RY DRY DRY Plumb within tolerance(yes/no) YES YES YES YES ES YES YES # of bars/Reinforcing bar size(#) 6/#6 6/#6 6/#6 6/#6 //5 4/#5 4/#5 Length of reinforcing steel(ft) 34.4 33.2 35.7 33.2 ~1.4 34.0 33.3. Time drilling was completed(am/pm) 1:45p 2:00p 1:30p 2:15pll:10p 1:30p 1:15p Time concrete was placed(am/pm) 2:00p 2:10p 1:35;) 2:30p 11:20;) 1:40p 1:30p L Depth of pier from top of concrete(ft) 34.9 33.5 36.1 33.6 1~3' .8 34.3 33.7 Elevation:Top of pier (ft)* · 98.0 98.0 98.0 98.0Ii2 8.0 98.0 98.0 Elevation:Bottom pier (ft)** 63.1 64.5 61.9 64.4 6.2 63.7 64.3 Elevation: Top of bearing stratum(ft)** 69.5 71.0 68.5 70.5 .2 . 70.5 71.1 Bearing stratum (Description) DARK GRAY SHALE NOTE: TIME: SEE REPORT # 111983 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. ELEVATION BY OTHERS 6:30 A.M. TO 3:30 P.M. Our letters and reports are for the exclusive uae of the client to whom they are addressed and shall not be reproduced exce~ laboratory. The use of our name must receive prior written approval of Maxim Technologies, Inc. Letters and raportl apply and are not indicative of the quantity of apparently identical or eimilar produm. )t in full without the approval of the testing only to the sample tested end/or inspected