Loading...
Northlake 635(2)-LR 970203 (5)Max 2; TECHNOLOGIES INC REPORT OF IN-PLACE DENSITY CLIENT: Lincoln Property Co. 500 N. AKARD, SUITE-3300 ATTN: LARRY MOON Dallas, TX 75201 PROJECT: COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PROJECT NO.: 0903 REPORT NO.: 11181 DATE OF SERVICE: AUTHORIZATION: REPORT DATE: 2 / SERVICES: Perform in-place density and moisture content tests to dl of field compaction. CONTRACTOR: BUTLER CONSTRUCTION TEST OF: Sewer line fill Building B PROJECT DATA MATERIALS 110197 Tan med. brown dark ** 109289 Dark light brown clay M OI M, METHOD OF TEST: DENSITY: ASTM D2922 MOISTURE: ASTM D3017 SPECIFICATION DENSITY: 95% Dry Density M~ TEST NO 1. 2. 3. 4. LOCATION 20' S 275' E of NW building corner. 1st lift. (Retest) of $1 20'S 250' E of NW building corner. 1st lift. 20' S 75'E of NW building, corner. 2nd lift. 20' S 280 E of NW building corner. 2nd lift. REPORT OF TESTS FIELD MOISTURE OPTIMUM f MOISTURE DE 23.8 * 24.5 24.5 24.5 26.2 24.5 25.8 24.5 Report Of Tests Continued On Page 2 1007 Fl% im Tach. ·Southwestem Labs 75 Lone Star Dr. · P.O..Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 605034 19 ~/29/97 )3/97 ~termine the degree )ISTURE/DENSITY RELATIONS q'IMUM MAXIMUM )ISTURE % DENSITY ocf 20.0 103.0 24.5 93.5 )ISTURE: +4 opt. moist IELD MAXIMUM NSlTY DENSITY DENSITY Pef) (Pcf) (% max) i3.8 93.5 90 ~9.5 93.5 96 ~0.4 93.5 97 ~9.6 93.5 96 Ou~ letters ~nd re~ ~e f~ the exduMve uae ~ ~ d~ to w~ ~y ~e ~r~ ~ ~1 ~ ~ ~ ~ ~ in full with~ t~ ~ovd of t~ ~fi~ I~at~. ~ ~ of ~e m~ ~ve ~ w~ ~ovM. O~ k ~ ~ re~ ~ply ~y to t~ ~p~ t~ ~/~ i~ctM, ~ ~e ~( i~ic;~e of t~ qumtit~ of ~y i~cd ~ ~ imil~ ~M~. Lincoln Property Co. PROJECT NO. 0903605034 DATE OFSERVICE: 1/29/97 REPORT OF TESTS (Continued) FIELD OPTIMUM TEST MOISTURE MOISTURE NO LOCATION (%) (%) 20' S 275' E of NW building corner. 3rd lift. 24.6 24.5 50' N 75' S of NE building, corner. 3rd lift. 24.1 * 24.5 An asterisk (*) appears next to test results w do NOT meet the project specifications as noted on ADDITIONALCOMMENTS: ** clay with gray limestone. Stayed all day at contractrors request. Technician: steve Long Technician Started: 08:30AM Stopped: 07:00AM Report Distribution: M~ (1) LJncotn Property Co. (1) BUTLER CONSTRUCTION ]NCORP. (1) BROCKETT-DAVIS-DRAk'E, (1) THE CITY OF COPPELL (1) THE CITY OF COPPELL 1007 FR Ow le~em end repor~ we f~ the ~du~ve u~e ~ the ~ie~t to whom they ~® ed~. ree~ed ~ ~ net be fu~l wi~ou~ the ~ov~ ~ the t~fi~ I~ow. The u~ ~ ourfl~ mu~ receive ~ur wn~ ~provM. REPORT NO. 111839 PAGE 2 -'IELD MAXIMUM -'NSITY DENSITY DENSITY [Pcf) {Pcf) {% max) )1.2 93.5 98 )1.5 93.5 98 ~ich page 1. LABS ~acken, B.S. Ch.E. 'oject Manager imilw ~oduc~.