Northlake 635(2)-LR 970203 (5)Max
2;
TECHNOLOGIES INC
REPORT OF
IN-PLACE DENSITY
CLIENT:
Lincoln Property Co.
500 N. AKARD, SUITE-3300
ATTN: LARRY MOON
Dallas, TX 75201
PROJECT:
COPPELL BUSINESS CENTER
WRANGLER DR. & BELTLINE RD.
COPPELL, TX
PROJECT NO.: 0903
REPORT NO.: 11181
DATE OF SERVICE:
AUTHORIZATION:
REPORT DATE: 2 /
SERVICES:
Perform in-place density and moisture content tests to dl
of field compaction.
CONTRACTOR: BUTLER CONSTRUCTION
TEST OF: Sewer line fill
Building B
PROJECT DATA
MATERIALS
110197 Tan med. brown dark **
109289 Dark light brown clay
M
OI
M,
METHOD OF TEST:
DENSITY: ASTM D2922
MOISTURE: ASTM D3017
SPECIFICATION
DENSITY: 95% Dry Density
M~
TEST
NO
1.
2.
3.
4.
LOCATION
20' S 275' E of NW
building corner. 1st lift.
(Retest) of $1 20'S 250' E of
NW building corner. 1st lift.
20' S 75'E of NW building,
corner. 2nd lift.
20' S 280 E of NW building
corner. 2nd lift.
REPORT OF TESTS
FIELD
MOISTURE
OPTIMUM f
MOISTURE DE
23.8 * 24.5
24.5 24.5
26.2 24.5
25.8 24.5
Report Of Tests Continued On Page 2
1007 Fl%
im Tach. ·Southwestem Labs
75 Lone Star Dr. · P.O..Box 224227
Dallas, Texas 75222
Telephone: (214) 631-2700
FAX: (214) 920-1891
605034
19
~/29/97
)3/97
~termine the degree
)ISTURE/DENSITY RELATIONS
q'IMUM MAXIMUM
)ISTURE % DENSITY ocf
20.0 103.0
24.5 93.5
)ISTURE: +4 opt. moist
IELD MAXIMUM
NSlTY DENSITY DENSITY
Pef) (Pcf) (% max)
i3.8 93.5 90
~9.5 93.5 96
~0.4 93.5 97
~9.6 93.5 96
Ou~ letters ~nd re~ ~e f~ the exduMve uae ~ ~ d~ to w~ ~y ~e ~r~ ~ ~1 ~ ~ ~ ~ ~ in
full with~ t~ ~ovd of t~ ~fi~ I~at~. ~ ~ of ~e m~ ~ve ~ w~ ~ovM. O~ k ~ ~ re~
~ply ~y to t~ ~p~ t~ ~/~ i~ctM, ~ ~e ~( i~ic;~e of t~ qumtit~ of ~y i~cd ~ ~ imil~ ~M~.
Lincoln Property Co.
PROJECT NO. 0903605034
DATE OFSERVICE: 1/29/97
REPORT OF TESTS
(Continued)
FIELD OPTIMUM
TEST MOISTURE MOISTURE
NO LOCATION (%) (%)
20' S 275' E of NW building
corner. 3rd lift. 24.6 24.5
50' N 75' S of NE building,
corner. 3rd lift.
24.1 * 24.5
An asterisk (*) appears next to test results w
do NOT meet the project specifications as noted on
ADDITIONALCOMMENTS:
** clay with gray limestone.
Stayed all day at contractrors request.
Technician: steve Long
Technician
Started: 08:30AM
Stopped: 07:00AM
Report Distribution: M~
(1) LJncotn Property Co.
(1) BUTLER CONSTRUCTION ]NCORP.
(1) BROCKETT-DAVIS-DRAk'E,
(1) THE CITY OF COPPELL
(1) THE CITY OF COPPELL
1007 FR Ow le~em end repor~ we f~ the ~du~ve u~e ~ the ~ie~t to whom they ~® ed~. ree~ed ~ ~ net be
fu~l wi~ou~ the ~ov~ ~ the t~fi~ I~ow. The u~ ~ ourfl~ mu~ receive ~ur wn~ ~provM.
REPORT NO. 111839
PAGE 2
-'IELD MAXIMUM
-'NSITY DENSITY DENSITY
[Pcf) {Pcf) {% max)
)1.2 93.5 98
)1.5 93.5 98
~ich
page 1.
LABS
~acken, B.S. Ch.E.
'oject Manager
imilw ~oduc~.