Loading...
Northlake 635(2)-LR 970131 (2)2~ TECHNOLOGIES INC CLIENT: PROJECT: SERVICES: REPORT OF DRILLED PIER INSPECTION Lincoln Proper~y Co. 500 N. AKARD, SUITE 300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PROJECT NO.: 0903 REPORT NO.: 1118~ DATE OF SERVICE: AUTHORIZATION: REPORT DATE: 1/ Perform Drilled Pier Inspection. REPORT OF INSPECTION On this date, Maxim Technologies representative arrived on scheduled to perform a Pier Inspection on the aboved referE (see attached for details). Technician Time: 6:30am to 5:30pm Technician: Abdullah Ethem Technician Report Distribution: (1) L~nco[n Property Co. (1) BUTLER CONSTRUCTION INCORP. C1) BROCKETT-DAVIS-DRAKE, INC. (1) THE CITY OF COPPELL (1) THE CITY OF COPPELL lOSe DY OU~ .~.am ami ~ a~e f~ ~ eF~umve ~ of ~ diet4 t.o WhOm ~hey ere addreaNd a~d ehMI not b? f~Jwib~oucthiMNx~vdMtheteet~r~JdoorMMy, f ne uN M. ~ m~t reQev? .a~r written MNwo~. M. (.rut leu im Tech. · Southwestern Labs 75 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 605034 ./29/97 ~l/97 site as ~nced project S TECHNOLOIIIIS INC Lincoln Property Company Project Na: 0903605034 Service Date: 01/29/97 2575 Lone Star DM · P.O. Box 224227 · Della;i, Texm 75222 (214) 6.11-2700 · F~x (214) 920-18~1 Report Na: 111841 Page 2 of 3 DRH.L~ ~ INSPECTION (STRAIGHT SHAFD Date Drilled: 1/29/97***OBSERVATION OF DRILL~I~ FOUNDATION CONSTRUCTION*** Pier identification A.5/9.0 A.6/9.0 BI9.0 B.5/9.0 C/9.0 F/3.4 F/4.2 Pier diameter(in)/Type 24 24 24 24 24 24 24 Depth of pier from surface(ft) 30.3 31.2 30.7 30.2 30.4 34.3 32.7 Depth bearing stratum from surface(ft) 22.8 24.5 23.7 23.7 23.7 28.0 26.2 Required penetration(ft) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Actual penetration(ft) * 7.5 6.7 7.0 6.5 6.7 6.3 6.5 Condition of bottom(wet/dry) wet wet wet wet wet wet wet Plumb within tolerance(yes/no) yes yes yes yes yes yes yes Casing diameter(in)/I.ength(ft) n/a n/a n/a n/a n/a n/a n/a # of bars/Reinforcing bar size(l) 6/6 6/6 6/6 6/6 6/6 6/6 6/6 Length of reinforcing steel(ft) 29.0 30.0 29.7 29.8 30.0 33.7 32.0 Time drilling was completed(am/pm) 10:15am 10:45am 1:45pm 2:20pm 3:30pm 3:15pm 3:00pm Time concrete was placed(am/pm) 1:20pm 1:30pm 2:00pm o i 2:30pm 3:45pm 3:30pm 3:10pm Depth of pier from top of concrete(ft) 29,8 30.7 30.2 30.2 30.4 34.3 32.7 Elevation:Top of pier (ft)** 95.5 95.5 95.5 95.5 95.5 95.5 95.5 Elevation:Bottom pier fit)* * 65.7 64.8 65.3 65.3 65.1 61.2 62.8 Bevation:Top of bearing stratum(fi)** 73.2 71.5 72.3 71.8 71.8 67.5 69.3 Bearing stratum (Description} Dark gray shale. NOTE: SEE REPORT # 111842 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. · ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. · * ;I ;VATION BY OTHERS TIME: 6:30 A.M. TO 5:30 P.M. Our letter, and relx~m are for the exdueive uee of the dient to whom they are addroeeed and ~ha# not be re~'o~h ~ ~oe~t in full withou~ the ~Gp~ovd of the tasting labot-*oty. The use of our neme must reoeive ;wior written Igqxovd of Mmdm Technologi~ ~, inc. Le(tem and reporm qNdy TSC#NOLOelES INC Lincoln Property Company Project N~: 0903605034 Service Date: 01/29/97 2575 Lone Star Drive · P.O. Box 224227 · Dallal (214) 631-2700 · Fax {214) 920-18g Texas 75222 Report N°: 111841 Page 3 of 3 DRH~LED PrER INSPECTION (STRAIGHT SHAFT) Date Drilled: 1/29/97***OBSERVATION OF DRILLED r Pier identification F/4.8 F/5.6 F/(~.3 C.5/9.0 / Pier diameter{in)/Type 24 24 2tI 24 Depth of pier from surface(ft) 31.7 33.6 31t2 29.5 Required penetration(ft) 6.0 6.0~l.' 6.0 Actual penetration(ft) ° 6.6 6.2 7.2 Condition of bottom(wet/dry) wet wet weF wet Plumb within tolerance(yes/no) yes yes yel yes Casing diameter{in)/Length(ft) n/a n/a n/ n/a # of bars/Reinforcing bar size(#) 6/6 6/6 6(~ 6/6 Length of reinforcing steel(ft) 31.0 33.0 3017 29.0 Time drilling was completed(am/pm) 2:30pm 2:20pm 2:C~0pm 4:00pm / Time concrete was placed(am/pm) 3:00pm 3:10pm 3:2~0pm 4:30pm / Depth of pier from top of concrete(ft) 31.7 33.6 31t2 29.5 Elevation:Top of pier (ft}** 95.5 95.5 95t5 95.5 / Elevation:Bottom pier (ft) · · 63.8 61.9 64t3 66.0 / Elevation:Top of bearing stratum(ft} · · 70.4 68.1 70t5 73.2 Bearing stratum (Description) Dark gray shale. NOTE: TIME: SEE REPORT//111842 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. ELEVATION BY OTHERS 6:30 A.M. TO 5:30 P.M. Our letters end reports are for the exclusive use of the client to whom they are addressed and shall not be reprodt approval of the testing laboratory. The uae of our name must receive prior written approval of Maxim Technologic only to the sample tested and/or inspected and are not indicative of tho quantity of apparently identical or similar ced except in full without the B, Inc. Letters end reports apply ~reducts.