Loading...
Northlake 635(2)-LR 970130Max 25 TECHNOLOGIES INC CLIENT: PROJECT: SERVICES: REPORT OF DRILLED PIER INSPECTION Lincoln Property Co. 500 N. AKARD, SUITE 300 ATTN= LARR~ MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PROJECT NO.: 0903 REPORT NO.: 1115' DATE OF SERVICE: AUTHORIZATION: REPORT DATE: 1/ Perform Drilled Pier Inspection. REPORT OF INSPECTION On this date, a MaximTechnologies representative arrived scheduled to perform a Drilled Pier Inspection. See attach4 the inspection. Time: 7:00 am - 5:00 pm Technician: Abdullah Ethem Technician Report Distribution: (1) Lincoln Proper~y Co. (1) BUTLER CONSTRUCTION [NCORP. (1) BROCKETT-DAV~S-ORAKE, [NC. (1) THE C]TY OF COPPELL (1) THE CITY OF COPPELL full with~ t~ ~prov~ of t~ t~,~ ~.boretorv. T~ ~ oT.o~n.~e ~ rece,v~_~ ~r,5~3.~LTL=_., or m Tech. · Southweetem Labs 75 Lone Star Dr. · P.O. Box 224227 Dallae. Texae 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 5034 /24/97 3/97 )n site as ~d for results of ~LABS , ~_~r~cken, B.S. Ch.E. =oject Manager ced except in similar product~. TECH MOLOGImrS INC LINCOLN PROPERTY COMPANY Project N~:0903605034 Service Date: 1/24/97 2575 Lone Star Drive · P.O. Box 224227 · Dalla~ Texaa 75222 {214) 631-2700 ,, Fax (214) 920-189 DRILLF. D pII~R INSPECTION (STRAIGHT SHAFT) Report N~: 111579 Page 2 of 4 Date Drilled: 1/24/97***OBSERVATION OF DI~H.I.I~D FOUNDATION COl ~ISTRUCTION*** Pier identification E/2.0 E/3.0 E/4.0 E/5.0 E/7.0 E/8.0 Pier diameter(in) 24 24 24 24 24 24 Depth of pier from surface(ft} 33.1 35.5 35.0 34.4 33.6 35.1 Depth bearing stratum from surface(ft) 26.8 29.0 28.5 28.4 27.0 29.0 Required penetration(ft) 6.0 6.0 6.0 6.0 6.0 6.0 Actual penetration(ft)* 6.3 6.5 6.5 6.0 6.6 6.1 Condition of bottom(wet/dry) DRY DRY DRY WET ,WET WET Plumb within tolerance(yes/no) YES YES YES YES YES YES # of bars/Reinforcing bar size(//) 6/#6 6///6 6///6 6///6 5///6 6///6 Length of reinforcing steel(ft) 32.0 34.4 34.0 33.1 32.5 34.0 Time drilling was completed(am/pm) 8:25a 8:45a 9:10a 9:30a 10:10a 12:30p Time concrete was placed(am/pm) 10:15a 10:25a 10:40a ~ 0:50a 1:20p 1:30p Depth of pier from top of concrete(ft) 32.6 35.0 34.5 33.9 28.0 34.6 Elevation:Top of pier (ft) · · 99.0 99.0 99.0 99.0 99.0 99.0 Elevation:Bottom pier {ft)** 66.4 64.0 64.5 65.1 65.9 64.4 Elevation: Top of bearing stratum(ft) ° * 72.7 70.5 71.0 71.1 72.5 70.5 Bearing stratum (Description) DARK GRAY SHALE NOTE: SEE REPORT # 111580 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. TIME: · 3' WATER · 4" WATER ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. ELEVATION BY OTHERS 7:00 A.M. TO 5:00 P.M. Our lettar~ and reports are for the exclusive use of the client to whom they are addressed.end sba# not be reproduced exc? laboratory. The use of our name must receive prior written approval of Maxim Technclog,us, Inc. Lattom and reports apply ~ are not indicative of the quantity of apparently identical or similar product~. ~ in full without the approval of the teeing only to the sarn~le tested endlor in~peoted TECII N OLOISI ES LINCOLN PROPERTY COMPANY Project N~:0903605034 Service Date: 1/24/97 2575 Lone Star Ddve* P.O. Box 224227 * Dallaa Texas 75222 (214) 631-2700 · Fax (214) 920-189 DRILLED PIk'IR INSPECTION (STRAIGHT SHAFT) Report N°: 111579 Page 3 of 4 Date Drilled: 1/24/97***OBSERVATION OF DRII.I.I~ FOUNDATION CO NSTRUCTION*** Pier identification D/2.0 C/2.0 BI2.0 BI3.0 D/3.0 DI8.0 Pier diameter(in) 24 24 24 24 24 24 Depth of pier from surface(ft) 32.7 32.1 31.9 33.2 33.3 34.5 Depth bearing stratum from surface(ft) 26.0 25.3 25.4 26.7 26.7 28.0 Required penetration(ft) 6.0 6.0 6.0 6.0 6.0 6.0 Actual penetration(ft)* 6.7 6.8 6.5 6.5 6.6 6.5 Condition of bottom(wet/dry) DRY DRY DRY ·WET WET WET Plumb within tolerance(yes/no) YES YES YES YES YES YES # of bars/Reinforcing bar size(#) 6/#6 6/#6 6/#6 61#6 6/#6 6/#6 Length of reinforcing steel(ft) 31.8 31.0 30.8 32.0 32.0 33.3 Time drilling was completed(am/pm) 9:50a 1 O: 15A 11:00a 10:30a 2:10p 2:30p Time concrete was placed(am/pm) 10:40a 10:50a 11:20a fl 0:35a 3:00p 3:15p Depth of pier from top of concrete(ft) 32.2 31.6 31.4 32.7 32.8 34.0 Elevation:Top of pier (ft) ·* 99.0 99.0 99.0 99.0 99.0 99.0 Elevation:Bottom pier (ft)** 66.8 67.4 67.6 66.3 66.2 65.0 Elevation: Top of bearing stratum(ft)** 73.5 74.2 74.1 72.8 72.8 71.5 Bearing stratum (Description) DARK GRAY SHALE NOTE: SEE REPORT # 111580 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. * ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. · * ELEVATION BY OTHERS TIME: 7:00 A.M. TO 5:00 P.M. · 3" WATER Our let/em and reports are for the excJusive use of the cJient to whom they are acldre~ed and shall not be reproduced exce laboratory. The use of our nanm must receive prier written approval of Maxim Technologie., Inc. Lattem and repert~ appl~ and are not indicative of the quantity of apparently identical er similer l~oduot,. ~ in full without the approval of the testing only to the sample tared end/er inspected TIiCN N OLOI, IES LINCOLN PROPERTY COMPANY Project N~:090~605034 Service Date: 1/24/97 2575 Lone Star Drive * P.O. Box 224227 * Dallas, Texas 75222 (214) 631-2700 * Fax (214) 920-189 DRILLED PIER INSPECTION (STRAIGHT SHAFT) Report N°: 111579 Page 4 of 4 Date Drilled: 1/24/97***OBSERVATION OF DRILLED FOUNDATION COl ~STRUCTION*** Pier identification C/4.0 C/7.0 Pier diameter(in) 24 24 Depth of pier from surface(fO 36.4 36.0 Depth bearing stratum from surface(fO 30.1 29.5 Required penetration(ft) 6.0 6.0 Actual penetration(ft)* 6.3 6.5 Condition of bottom(wet/dry) WET WET Plumb within tolerance(yes/no) YES YES # of bars/Reinforcing bar size(//) 61#6 61#6 Length of reinforcing steel(ft) 35.2 35.0 Time drilling was completed(am/pm) 3:10p 2:55p Time concrete was placed{am/pm) 3:20p 3:10p Depth of pier from top of concrete(ft) 35.9 , 35.5 Elevation:Top of pier (ft)** 99.0 99.0 Elevation:Bottom pier (ft)** 63.1 63.5 Elevation: Top of bearing stratum(ft)** 69.4 70.0 Bearing stratum (Description) DARK GRAY SHALE ~IOTE: SEE REPORT # 111580 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. * * ELEVATION BY OTHERS TIME: 7:00 A.M. TO 5:00 P.M. TOTAL 16 PIERS DRILLED AND PLACED WITH CONCRETE. PIER El6.0 AND E/7.0 DRILLED AT 10:00 AM AND CONCRETE PLACED 1:1 OPM DURING THIS TI 4' TO 5' WATER. INFORMED BUTLER CONSTRUCTION REPRESENTATIVE JIM. PIER #E/6.0 AT 3.5' BELOW FROM G.S.E., PIER #E/7.0 STOPPED AT APPROXIMATELY 4' BELOW FROM Our letters and reports are for the exclusive use of the client to whom they .ate acIcIre~ed.end shall not be rel~r, oduced exc? laboratory. The use of our name must receive prior written approval of Maxim Technologies, Inc. La<tam en,"' reports ap~y and are not indicative of the quantity of apparently identical or similar produot~. VIE PIERS HAD APPROXIMATELY P OF PIER ELEVATION STOPPED 3.S.E. < in full without the approvd of the testing only to the sarnl~ie tested end/or inspected