Loading...
Northlake 635(2)-LR 970123 (3)Maxi TECHNOLOGIES INC REPORT OF IN-PLACE DENSITY CLIENT: Lincoln Property Co. 500 N. AKARD, SUITE 300 ATTN: LARRY MOON Dallas, TX 75201 PROJECT: COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PROJECT NO.: 0903 REPORT NO.: 1111Z DATE OF SERVICE: AUTHORIZATION: REPORT DATE: 1/ SERVICES: Perform in-place density and moisture content tests to d~ of field compaction. CONTRACTOR: BUTLER CONSTRUCTION TEST OF: Subgrade PROJECT DATA MATERIALS 110175-Light brown clayey sand w/gravel MI OF M~ METHOD OF TEST: DENSITY: ASTM D2922 MOISTURE: ASTM D3017 SPECIFICATION DENSITY: 95% DRY DENSITY Mi REPORT OF TESTS FIELD OPTIMUM F TEST MOISTURE MOISTURE DE NO LOCATION 3e (Retest) South side pad B first lift See attached for locations 13.5 10.5 1( (Retest) South side pad B first lift See attached for locations 13.3 10.5 1( (Reteset) South side pad B first lift See attached for locations 13.4 10.5 1( An asterisk (*) appears next to test results w! do NOT meet the project specifications as noted Technician: Cody Sanderson Technician Report Distribution: (1) Lincoln Property Co. (1) BUTLER CONSTRUCT]ON INC0RP. (1) BROCKETT-DAVIS-DRAKE, INC. (1) THE CITY OF C0PPELL (1) THE CITY OF C0PPELL 1007 LW Started: 10:30AM Stopped: 12:30PM MAXIM TE~ Ow letters and report~ are for the excl~mive u~e of the client to whom they are ad.drem~d full with~ t~ ipprovN of t~ t~ti~ ~orltory. T~ ~e of o~n~e m~ re~v~ adp y on y to t~ simp · t~ed a~/or i~pe~, e~ are not i~ cat ve of t~ qu~tltl~ of apparently id~lcM m Tsch. ·Southwestem Labs 75 Lone Star Dr. · P.O. Box 224227 Dallas, Texel 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 505034 ~8 f16/97 3/97 ~termine the degree )ISTURE/DENSlTY RELATIONS TIMUM MAXIMUM )ISTURE % DENSITY pcf 10.5 125.0 )ISTURE: +3% opt moist IELD MAXIMUM NSITY DENSITY DENSITY Pcf) (Pcf) (% max) 17.6 125.0 86 * t9.3 125.0 87 * ~8.4 lich ~ove. 125.0 87 * ~oject Manager ed except in :em and reports imilar grodu~.