Loading...
Northlake 635(2)-LR 970122 (2)TECHNOLOGIES INC Max CLIENT: PROJECT: SERVICES: REPORT OF DRILLED PIER INSPECTION Lincoln Property Co. 500 N. AKARD, SUITE 300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PROJECT NO.: 0902 REPORT NO.: 11111 DATE OF SERVICE: AUTHORIZATION: REPORT DATE: 1/ Perform Drilled Pier Inspection. REPORT OF INSPECTION On this date, a Maxim Technologies representative performe~ Inspection. The result of this inspection is attached. Time: 7:00 am - 3:00 pm Technician: Abdullah Ethem Technician Report Distribution: MAXII~X~ (1) Lincoln Property Co. (1) BUTLER CONSTRUCTION ]NCORP. (1) BROCKETT-DAVIS-DRAKE, INC. (1) THE CITY OF COPPELL / ~--a~r~ (1) THE CITY OF COPPELL 1099 FR Ow letters and repor~ we for the e?clu~ve use 0f apply o~y ~o t~ S~ t~ ~/~ m~ct~, im Tech. ·Southwestem Labs 75 Lone Sta~ Dr. · P.O. Bex 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 605034 13 L/16/97 !2/97 a Drilled Pier BS ~-~en, B.S. Ch. E. ~oJ ·'ct Manager except in ~er~ ~ rel~or~ ~mil~ 2 TICH IlOLOII ES IHC LINCOLN PROPERTY CO. Project Na:0903605034 Service Date: 1/16/97 2575 Lone Star Drive * P.O. Box 224227 * DalI~ B, Texa. 75222 (214) 631-2700 * Fax (214) 920-18,~ DRILLED PIER INSPECTION (STRAIGHT SHAFT) Report N~: 111133 Page 2 of 3 Date Drilled: 1/16/97***OBSERVATION OF DRII.I~D FOUNDATION CC NSTRUCTION*** Pier identification E/1.0 D5/1.0 D/1.0 C.5/1.0 C/1.0 B.5/1.0 B/1.0 Pier diameter(in) 24 24 24 24 24 24 24 Depth of pier from surface(ft) 33.0 33.3 33.8 36.3 32.5 36.2 33.3 Depth bearing stratum from surface(ft) 27.0 26.0 27.0 29.0 26.0 29.8 27.2 Required penetration(ft} 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Actual penetration(ft)* 6.0 7.3 6.8 7.3 6.5 6.4 6.1 Condition of bottom(wet/dry) DRY DRY DRY DRY DRY DRY DRY Plumb within tolerance(yes/no) YES YES YES YES YES YES YES //of bars/Reinforcing bar size(//) 6///6 6///6 6///6 6///6 61#6 6///6 6///6 Length of reinforcing steel(ft) 31.8 32.0 32.7 35.2 31.5 35.0 32.1 Time drilling was completed(am/pm) 8:25a 9:20a 9:50a 10:10a 8:50a 10:20a 11:10a Time concrete was placed(am/pm) 9:45a 9:30a lO:OOa ° 10:30a 10:15a 10:50a 11:45a Depth of pier from top of concrete(ft) 32.5 32.8 33.3 35.8 32.0 35.7 32.8 Elevation:Top of pier (ft)** 98.0 98.0 98.0 98.0 98.0 98.0 98.0 Elevation:Bottom pier (ft)** 65.5 65.2 64.7 62.2 66.0 62.3 65.2 Elevation: Top of bearing stratum(ft)** 71.5 72.5 71.5 69.5 72.5 68.7 71.3 Bearing stratum (Description) GRAY SHALE NOTE: SEE REPORT # 111134 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. * ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. * * ELEVATION BY OTHERS TIME: 7:00 A.M. TO 3:00 P.M. Our letters and report~ are for the exclusive use of the clieot to whom they are adclreeeed and sheil not be reproduced exc. pt in full without the approvd of the te~tJng laboratory. The u~e of our name mu~t receive prior written aoprovd of Mexim Technologie., Inc. Lettem and re~=rt~ appll ' only to the sample te~ted and/or inapeoted and are not indicative of the quantity of apparently identical or similar preduot~. 'TECN N OLQI, I El, LINCOLN PROPERTY CO. Project N~:0903605034 Service Date: 1/16/97 2575 Lone Star Drive * P.O. Box 224227 · Dalla B, Texaa 75222 (214) 631-2700 · Fax (214) 920-18!11 DRILLF, D PI'ER INSPECTION (STRAIGHT SHAFT) Report N": 111133 Page 3 of 3 Date Drilled: 1/16/97***OBSERVATION OF DRILLED FOUNDATION CC ~NSTRUCTION*** Pier identification A.6/1.0 A.5/1.0 Al1.0 Pier diameter(in) 24 24 24 Depth of pier from surface(ft) 34.1 35.5 36.4 Depth bearing stratum from surface(ft) 28.0 28.0 30.0 Required penetration(ft) 6.0 6.0 6.0 Actual penetration(ft)* 6.1 7.5 6.4 Condition of bottom(wet/dry) DRY DRY DRY Plumb within tolerance(yes/no) YES YES YES # of bars/Reinforcing bar size(//) 6/#6 6///6 6/#6 Length of reinforcing steel(ft) 33.0 34.5 35.3 Time drilling was completed(am/pm) 11:00a 11:25a 12:00p Time concrete was placed(am/pm) 12:35p ° 12:50p 1:15p Depth of pier from top of concrete(ft) 33.6 35.0 35.9 Elevation:Top of pier (ft)** 98.0 98.0 98.0 Elevation:Bottom pier (ft)* · 64.4 63.0 62.1 Elevation: Top of bearing stratum(ft)** 70.5 70.5 68.5 Bearing stratum (Description) GRAY SHALE NOTE: SEE REPORT # 111134 FOR COMPRESSNE STRENGTH TEST SPECIMENS. · ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. · · ELEVATION BY OTHERS TIME: 7:00 A.M. TO 3:00 P.M. Our lettem and report~ are for the exclusive use of the client to whom they are addressed and shall not be reproduced exc~ laboratory. The use of our name must receive prior written approval of Maxim Technologies, Inc. Lettem and reports appl and are not indicative of the quantity of apparently identical or similar ~.oduots. ~t in full without tho approval of the t~ting only to the sample te~ted and/or insp®oted