Loading...
Northlake 635(2)-LR 970122 (4)Ma3 2; TECHNOLOGIES INC CLIENT: PROJECT: SERVICES: REPORT OF WATER INJECTION INSPECTION Lincoln Property Co. 500 N. AKARD, SUITE 300 ATTN= LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PROJECT NO.:- 090.' REPORT NO.: 1111 DATE OF SERVICE: AUTHORIZATION: REPORT DATE: 1/ Perform Water Injection Inspection. REPORT OF INSPECTION On this date, a Maxim Technologies representative performe Injection Inspection. The result of this inspection is att Time: 1:30 pm - 6:00 pm Technician: David King Technician Report Distribution: (1) Lincoln Property Co. (1) BUTLER CONSTRUCTION [NCORP. (1) BROCKETT-DAVIS-DRAEE, [NC. 1099 FR Ou~ letters Ind repo~ Ire for the e~cclu~ive u~ of the client to whom they ~'e ~lrelled ~ ihl# not b? full without the a~oprovel of the ta~ttrlg I~orltory. The ull of oul'r~me mw! recmve out written IINWOVII. ULI' ~opiy only to the II~lple t~lt~cI ind/o4' inloected, and Ire not irgliclt~ve of the qum~itml of Ipporlncly idlnticll ',im Tach. ·Southwestem Labs ~75 Lone Star Dr. · P.O. Box 224227 Delle~, Taxe~ 7S222 Telephone: (214) 631-2700 FAX: (214) 920-1891 1605034 D5 1/15/97 22/97 a Water ched. LABS ~B~racken, B.S. Ch.E. :oject Manager except in I~mil~' p~'oductl, TECIIMOLO e,I ES lNG LINCOLN PROPERTY CO. Project N°:0903605034 Service Date:01/15/9? 2575 Lone Star Drive · P.O. Box 224227 * Dalle s, Texas 75222 (214) 631-2700 · Fax (214) 920-18)1 On January 15, 1997 a representative of MAXIM TECHNOLOGIES, IN( injection of water into the building subgrade for compliance with project spec was observed. Report Ne: 111105 Page 2 of 2 observed the pressure Lficafions. The following of rigs probes (ea) P~$ Numb~ 1. Injection depth intervals marked on rig. 2. Surfactant added to each load. 3. Injection pressure maintained between 50 and 200 PSI. 4. Probes forced downward in 12 to 18 inch intervals until refusal. 5. Total depth required on injection 10 feet. 6. Spacing for injection @ a five feet maximum. For explanation of any NO response, see REMARKS below. Additional injection for Building A at the request of GEOTECH Lab Maxim See attached diagmphm. TIME: 1:30 pm to 6:00 pm Technician: David King Our letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduc~ of the testing laboratory. The use of our name rnu~t receive prior written approval of Maxim Technologies. Inc. semi, la tested end/or inspected and are not indicative of the quantity of al3parently identicol or similar product~. NO NO YES YES YES Technologies Inc. d exce~ in full without the approval .attem ami reoorte alNflV only to the w w W~-~ Z w w w ZbJ _jZ .,,JO f ~O,O¢.,,O,N