Northlake 635(2)-LR 970120 (3)TECHNOLOGIES INC
Ma~
2~
CLIENT:
PROJECT:
SERVICES:
REPORT OF
WATER INJECTION INSPECTION
Lincoln Property Co.
500 N. AKARD, SUITE 300
ATTN: LARRy MOON
Dallae, TX 75201
COPPELL BUSINESS CENTER
WRANGLER DR. & BELTLINE RD.
COPPELL, TX
PROJECT NO.: 0903
REPORT NO.: 1105'
DATE OF SERVICE: 1:
AUTHORIZATION:
REPORT DATE: 1/i
PERFORM WATER INJECTION INSPECTION.
REPORT OF INSPECTION
ON THIS DATE, A MAXIM TECHNOLOGIES REPRESENTATIVE ARRIVED
SCHEDULED TO PERFORM A WATER INJECTION INSPECTION. SEE AT!
RESULTS OF THE INSPECTION.
TECHNICIAN TIME: START 6:30AM STOP 5:30PM
Technician: Daniel Hernandez
Technician
Report Distribution: MAXIM TE(
(I) LincoLn Property Co.
(1) BUTLER CONSTRUCT]ON ]#CORP. /~
(1) BROC~ETT-DAV[S-DRAKE, ~NC.
(1) THE C[TY OF COPPELL
(1) THE CZTY OF COPPELL
10~ DY O~ let~efl Ifld rl~=~)r~ ~e f~ the ~ulive ule ~ ~ cdient ~ whom ~ftly ~l ecklrlBled ~ ihdl n4X ~ r~xoc~.
full without the ~ovd ~ tYd te~ng J~atoty. r~ u~ ~...m~'~ne. muet re~v~..our wr~ten ~'m/~. ~? w
i4xdy ordy to tJ~ e~mpie teeted end/~ ~ni4)e~, snd ~e not ind~.Mwe ~ the qu4m~tme ~ 1l~4rently identicel ~
im Tech. · Sou{hwestem Labs
75 Lone Star Dr. · P.O. Box 22422.7
Dallas, Texas 75222
Telephone: (2.14) 631-2700
FAX: (214) 920-1891
605034
~3
!/31/96
!0/97
)N SITE AS
~ACHED REPORT FOR
:H. ~SOUTHWESTERN LABS
FBr--acken, B S. Ch E
'oJect Manager
TICHNOLQSIES INC
LINCOLN PROPERTY COMPANY
Project Nn:0903605034
Service Date: 12/31/96
2575 Lone Stir Drive · P.O. Box 224227 · Dellal
(214) 631-2700 · Fex (214) 920-189
I~EPORT OF
WATER INJECTION INSPECTION
TexB 75222
Report N°: 110573
Page 2
On December 31,1996, a representative of MAXIM TECHNOLOGIES, INC. ol
injection of water into the building subgrade for compliance with project specific
observed.
2.
3.
4.
Injection depth intervals marked on rig.
Surfactant added to each load.
Injection pressure maintained at 50 PSI.
Probes forced downward in 12 to 18 inch intervals until
Total depth required on injection 10 feet.
Spacing for injection @ a five feet maximum.
SEE ATTACHED DIAGRAM.
TIME: 6:30 am to 5:30 pm
Our lettMI ind reportI we for the eXdUlive uI· of ~he client to whom they ire ecidrmed Ind ·h4dl not be relxC
m~provei of ih· testing IiborI~My. The uIi of our nimI muir receive mior written iplxovd of Mm~. T .~lv~..
only to the IMT~I telted end/or mpected Mid ~rl not ~cMiv· of the quantity of ~pporentiy Ment]M or Ibl~l
)served the pressure
ations. The following was
ur. ed except in fu# without the
ce. Ino. Lettem end reporm N~ply
productl.
m
b
I