Northlake 635(2)-LR 970109 (2)TECHNOLOGIES INC
REPORT OF
IN-PLACE DENSITY
CLIENT:
Lincoln Property-Co.
500 N. AKARD, SUITE 300
ATTN: LARRY MOON
Dallas, TX 75201
PROJECT:
COPPELL BUSINESS CENTER
WRANGLER DR. & BELTLINE RD.
COPPELL, TX
M8
SERVICES:
PROJECT NO.: 094
REPORT NO.: 11(~
DATE OF SERVICE:
AUTHORIZATION:
REPORT DATE: i
Perform in-place density and moisture content tests to
of field compaction.
PROJECT DATA
MATERIALS
LT BRN CLAYEY SAND W/GRAVEL
CONTRACTOR: BUTLER CONSTRUCTION
TEST OF: PAD FILL 110175
SPECIFICATION
DENSITY: 95 OR ABOVE
REPORT OF TESTS
METHOD OF TEST:
DENSITY: ASTM D2922
MOISTURE: ASTM D3017
FIELD OPTIMUM
TEST MOISTURE MOISTURE
NO LOCATION {%) {%}
1. BLDG PAD 20'E 60'N OF SW
CORNER FINAL LIFT 10.5 10.5
2. BLDG PAD 50'W 60'N OF SE
CORNER FINAL LIFT 10.8 10.5
3. BLDG PAD 100'S 63'W OF NE
CORNER FINAL LIFT 11.8 10.5
4. BLDG PAD 50'S 50'E OF NW
CORNER FINAL LIFT 11.9 10.5
An asterisk (*) appears nex~ to test results ~
do NOT meet the project specifications as noted
Technician: Burl Thomas Star=ed: ll:00AM S=opped: 12:30PM
Report Distribution: MAXIM TE{
(1) Lincoln Prol=erty Co.
(1) BUTLER CONSTRUCT]01d lldC0RP. ~/- ~
(1) BROCKETT-DAV~$-0RAKE, [NC.
(1) THE CITY 0F ~PELL // /~
(1) THE CITY 0F C~PELL ~~
1007 O~ ~ ~ r~l Me fM ~ ex~vl ~ of t~ ~ to w~ ~y Me ~ ~ M ~ ~ r~
f~ Wlm~ t~ ~MoY/of %~ t~l~ I~MIt~. T~ m of.~ m~% ~l~l ~ wr~ word. ~ M
xim Tech. ·Southwestem Labs
S75 Lone Star Dr. · P.O. Box 224227
Dallas, Texas 75222
Telephone: (214} 631-2700
FAX: (214} $20-1891
3605034
~39
,2/28/96
o9/9?
Letermine the degree
IOISTURE/DENSITY RE~LATIONS
~FTIMUM MAXIMUM
IOISTURE % DENSITY pcf
10.5 125.0
IOISTURE: OPT TO +3
FIELD MAXIMUM
ENSITY DENSITY DENSITY
(Pcf} (Pcf) (% mex}
18.0 125.0 94
12.0 125.0 90
18.3 125.0 95
18.2 125.0 95
hich
above.
~acken, B.S. Ch.E.
~oject Manager