North Texas Mail-SP 880406,/~-¢il./:J //_~_~---"~ The City With A Beautiful Future
~ -7,/ !/---j
P.O. Box 478
Coppell, Texas 75019
214 - 462 - 0022
April 6, 1988
Clyde Sifford
DeShazo Starek & Tang
330 Union Station
Dallas, Texas 75202
Dear Mr. Sifford:
As per your request, here are the letters from Sverdrup Corp. and
MSQ Engineers for entry into box culverts and sealed shop drawing.
There shop drawing conform to Texas Highway standards and they
are using your Design Detail for inlet openings in top of box
culvert.
I wiI1 await your response before allowing Hall construction to
do any work on these culvert walls. Thank you.
SMM/bb
cc: Steve Goram, Director of Public Works
3354 Perimeler Hill Drive
P.O. Box 111892
Na%l~ville, Tennessee 37222-1892
~H5 3:J1 g232
March 28,1988
t.lr. Stove Nor ton
C}l[ef of Land Development
Ci l:.y of: Co12pe].l.
I~.C). P, ox 't7g
COl?[?e ]. ]. , Texas 75019
Reference: North Texas Mail Processing Center
Coppell, Texas
Dear Mr. Morton:
Construction is currently on going on the drainage
structures in front of the new USPS mail facility in Coppell.
Tl~ese drainage structures are being built under contract between
Thompson Development Co. and Ulvalde Construction. It is my
,l~ldorstanding that the drainage will be part of the City easement
Ul.)or~ completion and acceptance by the City of Coppell.
The USPS has contracted with Marie Sinacola & Sons to
,~:onstruct the site work for the postal facility. The contractor
i~; required to tie into the "existing" reinforced concrete box
c~lvet~ts with drainage pipes and curb inlets.
.~inc:e the box culverts have not been construct:ed to date,it
would seen to be a better construction method to blockout the
culvert d__ lng constr~:ction to ~ccommodate the ,j~o~ ~torm sowers.
This would be more structurally sound than cutting the box
culverts after they are constructed.
If Uvalde Construction would be permitted to blockout the
bo~ culver'ts in accordance with our engineers' sketch, then the
II~:PS contractor,Sinacola,can work with Uvalde on the
ce~nstruction particulars. Please call if you have any questions.
Sincerely,
RoJf Prince
Construction Manager
MSQ ENGINEERING, INC.
CONSULTING ENGINEERS
March 24, 1988
~:l~i. ef of Land Development
,'il>/ of Coppell
,,.I). !:',(ix 478
,~,~!,p~'l l , 'rexa~; 75019
North Texas Mail Processing Center
Coppell, Texas
Morton:
hl~e request of Mr. Roy Prince of Sverdrup Corporation, please find enclosed
,!,:i:ai.].s for blockouts which may be utilized on the box culverts along Bethel
[:o accommodate storm sewers from the Post Office site. I request that con-
:,;~l,~,-,-~i ion he given for their use on the city's Bethel Road project. Please
free to call if you should have any questions.
Sincerely,
MSQ ENGINEERING, INC.
Tony ,l~rauska, P.E.
Civil Engineer
Roy Prince - ~v~rdrup
3ef~ Forrest - HDR
:::,495 BELT LINE RD., SUITE 380 · DALLAS, TX 75240 ° TELEPHONE (214) 233-1500
'&fSQ ~
MSQ ENGINEERING, INC.
DALLAS, TEXAS
IPROJECT
SUBJECT
BY 1'"/c.
CHKD.
DATE,,,.-.P-/7-~8 PROJECT NO.
DATE SHEET / OF
T
NON- METALLIC
NON- SHRINK GROUT
L_
BLOCKOUT
FOR
PIPES
BAR B
IN TOP SLAB
OF CULVERT
NG,
SECTION H H
N. T., S,
S I Z E LENGTH NUMBER
BAR A tt 4, 5'-0" 4.