Loading...
Northlake 635(2)-LR 970110 (2)TECHNOLOGIES INC Max REPORT OF IN-PLACE DENSITY CLIENT: Lincoln Property Co. 500 N. AKARD, SUITE 300 ATTN: LARRY MOON Dallas, TX 75201 PROJECT: COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PROJECT NO.: 0903 REPORT NO.: 1108' DATE OF SERVICE: AUTHORIZATION: REPORT DATE: 1/ SERVICES: Perform in-place density and moisture content tests to d; of field compaction. CONTRACTOR: BUTLER CONSTRUCTION TEST OF: SELECT FILL 110175 PROJECT DATA M, OI MATERIALS M, LT BRN CLAYEY SAND W/GRAVEL METHOD OF TEST: DENSITY: ASTM D2922 MOISTURE: ASTM D3017 SPECIFICATION DENSITY: 95% DRY DENSITY TEST NO 1. 2. 3. LOCATION PAD B 1ST LIFT (SEE ATTACHED) PAD B 1ST LIFT (SEE ATTACHED) PAD B 1ST LIFT (SEE ATTACHED) REPORT OF TESTS FIELD OPTIMUM MOISTURE MOISTURE {%) 10.3 * 10.5 10.2 * 10.5 10.0 * 10.5 An asterisk (*) appears next to teat results w] do NOT meet the project specifications as noted Technician: Cody Sanderson Technician Started: 02:00PM Stopped: 04:00PM Report Distribution: (1) Lincotn Property Co. (1) BUTLER CONSTRUCTION [NCORP. (1) BROCKETT-DAVIS-DRAKE, ZHC. T (1) THE C! Y OF COPPELL (1) THE C,TY OF COPPELL 1007 Our letter, and rep~ are f~' the exclumiYe u~e of the client to where they f~ w~ ~ ~a ~ ~ t~i~ I~. T~ ~ ~.~ ~ ~ ~ w~ ~d. ;m Tech. · Southwestern Labs 75 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-i891 605034 ~6 ./07/97 .0/97 ~termine the degree )ISTURE~DENSlTY RELATIONS q'IMUM MAXIMUM )ISTURE % DENSITY Dcf 10.5 125.0 M,)ISTURE: OPT +3 I~IELD D! iNSITY Pof) 1:.0.8 1~.7.4 .2.1 rich ~ove. MAXIMUM DENSITY DENSITY {Pcf) {% max) 125.0 89 125.0 94 125.0 90 _~cken, B.S. Ch.E. 'oject Manager