Northlake 635(2)-LR 970110 (2)TECHNOLOGIES INC
Max
REPORT OF
IN-PLACE DENSITY
CLIENT: Lincoln Property Co.
500 N. AKARD, SUITE 300
ATTN: LARRY MOON
Dallas, TX 75201
PROJECT:
COPPELL BUSINESS CENTER
WRANGLER DR. & BELTLINE RD.
COPPELL, TX
PROJECT NO.: 0903
REPORT NO.: 1108'
DATE OF SERVICE:
AUTHORIZATION:
REPORT DATE: 1/
SERVICES: Perform in-place density and moisture content tests to d;
of field compaction.
CONTRACTOR: BUTLER CONSTRUCTION
TEST OF: SELECT FILL 110175
PROJECT DATA M,
OI
MATERIALS M,
LT BRN CLAYEY SAND W/GRAVEL
METHOD OF TEST:
DENSITY: ASTM D2922
MOISTURE: ASTM D3017
SPECIFICATION
DENSITY: 95% DRY DENSITY
TEST
NO
1.
2.
3.
LOCATION
PAD B 1ST LIFT (SEE ATTACHED)
PAD B 1ST LIFT (SEE ATTACHED)
PAD B 1ST LIFT (SEE ATTACHED)
REPORT OF TESTS
FIELD OPTIMUM
MOISTURE MOISTURE
{%)
10.3 * 10.5
10.2 * 10.5
10.0 * 10.5
An asterisk (*) appears next to teat results w]
do NOT meet the project specifications as noted
Technician: Cody Sanderson
Technician
Started: 02:00PM
Stopped: 04:00PM
Report Distribution: (1) Lincotn Property Co.
(1) BUTLER CONSTRUCTION [NCORP.
(1) BROCKETT-DAVIS-DRAKE, ZHC.
T
(1) THE C! Y OF COPPELL
(1) THE C,TY OF COPPELL
1007 Our letter, and rep~ are f~' the exclumiYe u~e of the client to where they
f~ w~ ~ ~a ~ ~ t~i~ I~. T~ ~ ~.~ ~ ~ ~ w~ ~d.
;m Tech. · Southwestern Labs
75 Lone Star Dr. · P.O. Box 224227
Dallas, Texas 75222
Telephone: (214) 631-2700
FAX: (214) 920-i891
605034
~6
./07/97
.0/97
~termine the degree
)ISTURE~DENSlTY RELATIONS
q'IMUM MAXIMUM
)ISTURE % DENSITY Dcf
10.5 125.0
M,)ISTURE: OPT +3
I~IELD
D! iNSITY
Pof)
1:.0.8
1~.7.4
.2.1
rich
~ove.
MAXIMUM
DENSITY DENSITY
{Pcf) {% max)
125.0 89
125.0 94
125.0 90
_~cken, B.S. Ch.E.
'oject Manager