REPORT OF
WATER INJECTION INSPECTION
Lincoln Property Co.
500 N. AKARD, SUITE 300
ATTN: LARRY MOON
Dallas, TX 75201
COPPELL BUSINESS CENTER
WRANGLER DR. & BELTLINE RD.
COPPELL, TX
PROJECT NO.: 090:
REPORT NO.: 1096
DATE OF SERVICE: 1
AUTHORIZATION:
REPORT DATE: 1/
PERFORMED DRILLED PIER INSPECTION
REPORT OF INSPECTION
ON THIS DATE, A MAXIM TECHNOLOGIES REPRESENTATIVE PERFORME]
INJECTION INSPECTION. THE RESULT OF THIS INSPECTION IS AT!
TIME: 9:00A TO 6:30P
Technician: Daniel Hernandez
Technician
Report Distribution: (1) LincoLn Property Co.
(1) BUTLER CONSTRUCT[O# ~NCOEP.
(1) BROCKETT-OAViS-ORAEE, INC.
(1) THE CiTY OF COPPELL
(1) THE CiTY OF COPPELL
108o DY
:ira TaCh. · Southwestern Labs
;7S Lone Star Dr. · P.O. Box 224227
Dallas, Texas 75222
Telephone: (214) 631-2700
FAX: (214) S20-18S1
605034
2/09/96
) A WATER
~ACHED.
TICHNOLQelIS INC
LINCOLN PROPERTY CO.
Project :0903605034
Service Date: 12/09/96
2575 Lone S~r Drive · P.O. Box 224227 · Dalla s, Texas 75222
(214) 831-2700 · F~x (214) 920-18111
REPORT OF
WATER INJECTION INSPECTION
Report: 109629
Page 2 of 3
On December 9, 1996, a representative of MAXIM TECHNOLOGIES, INC. ol
injection of water into the building subgradc for compliance with project specifi~
observed.
2.
3.
4.
Injection depth intervals marked on rig.
Surfactant added to each load.
Injection pressure maintained at 50 PSI.
Probes forced downward in 12 to 18 inch intervals until
Total depth required on injection 10 feet.
Spacing for injection @ a five feet maximum.
REMARKS: SEE ATTACHED DIAGRAlVl
TIME: 9:00am 6:30pm
Our lettere and reporl~ are for the exchmive u~e of the client to whom they are ecldraeaed and shall not be relxo
· Ol~'ovd of the te~ing laboratory. Th,, uae of our name must receive prior written aOprovd of Maxim Tee. hnolooi
only to the .eml~e teated and/or inapected and are not indicative of the quantity of aOOarently identical or .irnilar
,served the pressure
~tions. Thc following was
Jced except in full without the
m, Inc. Let'tam and reporl~ appJy
~oduc'm.
, I
£J
Ej
TICHNOLOelIS
LINCOLN PROPERTY CO.
Project Nn:0903605034
Service Date: 12/09/96
On December 9,
2575 Lone Star Ddve · P.O. Box 224227 · Dfdi~ ~, Texas 75222
(214) 631-2700 · Fox (214) 920-18.Cll
ItEPORT OF
WATER INJECTION INSPECTION
1996, a representative of MAXIM TECHNOLOGIES, INC.
Report Na: 109629
Page 3 of 3
~served the pressure
injection of water into the building subgrade for compliance with project specifil
observed.
2.
3.
4.
Injection depth intervals marked on rig.
Surfactant added to each load.
Injection pressure maintained at 50 PSI.
Probes forced downward in 12 to 18 inch intervals until
Total depth required on injection 10 feet.
Spacing for injection @ a five feet maximum.
REMARKS: SEE ATFACHED DIAGRAM.
TIME: 9:00 am to 6:30 pm
Our letter, and repot, are for the excluaive use of the dlent to whom they are addreeeed and ehdl not be reprc
approval of the teeting Id)oratcxy. The use of our name mu~t receive prior written ~glxovd of Maxim Tec:hnoloO
rely to the sample tNted m~cl/ar inepected end me nat indicative of the ClUm~Jty of apgermtly identical or similar
ations. The following was
ur. ed oxcem in full without tho
es. ho. Letters and roe. xts 8~dV
~roduct8.
EJ
SO'30'OO"W
64..74'
S(
C