Loading...
Northlake 635(2)-LR 970108 (2)Mm 2! TECHNOLOGIES INC CLIENT: PROJECT: SERVICES: REPORT OF WATER INJECTION INSPECTION Lincoln Property Co. 500 N. AKARD, SUITE 300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PROJECT NO.: 090: REPORT NO.: 1096 DATE OF SERVICE: 1 AUTHORIZATION: REPORT DATE: 1/ PERFORMED DRILLED PIER INSPECTION REPORT OF INSPECTION ON THIS DATE, A MAXIM TECHNOLOGIES REPRESENTATIVE PERFORME] INJECTION INSPECTION. THE RESULT OF THIS INSPECTION IS AT! TIME: 9:00A TO 6:30P Technician: Daniel Hernandez Technician Report Distribution: (1) LincoLn Property Co. (1) BUTLER CONSTRUCT[O# ~NCOEP. (1) BROCKETT-OAViS-ORAEE, INC. (1) THE CiTY OF COPPELL (1) THE CiTY OF COPPELL 108o DY :ira TaCh. · Southwestern Labs ;7S Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) S20-18S1 605034 2/09/96 ) A WATER ~ACHED. TICHNOLQelIS INC LINCOLN PROPERTY CO. Project :0903605034 Service Date: 12/09/96 2575 Lone S~r Drive · P.O. Box 224227 · Dalla s, Texas 75222 (214) 831-2700 · F~x (214) 920-18111 REPORT OF WATER INJECTION INSPECTION Report: 109629 Page 2 of 3 On December 9, 1996, a representative of MAXIM TECHNOLOGIES, INC. ol injection of water into the building subgradc for compliance with project specifi~ observed. 2. 3. 4. Injection depth intervals marked on rig. Surfactant added to each load. Injection pressure maintained at 50 PSI. Probes forced downward in 12 to 18 inch intervals until Total depth required on injection 10 feet. Spacing for injection @ a five feet maximum. REMARKS: SEE ATTACHED DIAGRAlVl TIME: 9:00am 6:30pm Our lettere and reporl~ are for the exchmive u~e of the client to whom they are ecldraeaed and shall not be relxo · Ol~'ovd of the te~ing laboratory. Th,, uae of our name must receive prior written aOprovd of Maxim Tee. hnolooi only to the .eml~e teated and/or inapected and are not indicative of the quantity of aOOarently identical or .irnilar ,served the pressure ~tions. Thc following was Jced except in full without the m, Inc. Let'tam and reporl~ appJy ~oduc'm. , I £J Ej TICHNOLOelIS LINCOLN PROPERTY CO. Project Nn:0903605034 Service Date: 12/09/96 On December 9, 2575 Lone Star Ddve · P.O. Box 224227 · Dfdi~ ~, Texas 75222 (214) 631-2700 · Fox (214) 920-18.Cll ItEPORT OF WATER INJECTION INSPECTION 1996, a representative of MAXIM TECHNOLOGIES, INC. Report Na: 109629 Page 3 of 3 ~served the pressure injection of water into the building subgrade for compliance with project specifil observed. 2. 3. 4. Injection depth intervals marked on rig. Surfactant added to each load. Injection pressure maintained at 50 PSI. Probes forced downward in 12 to 18 inch intervals until Total depth required on injection 10 feet. Spacing for injection @ a five feet maximum. REMARKS: SEE ATFACHED DIAGRAM. TIME: 9:00 am to 6:30 pm Our letter, and repot, are for the excluaive use of the dlent to whom they are addreeeed and ehdl not be reprc approval of the teeting Id)oratcxy. The use of our name mu~t receive prior written ~glxovd of Maxim Tec:hnoloO rely to the sample tNted m~cl/ar inepected end me nat indicative of the ClUm~Jty of apgermtly identical or similar ations. The following was ur. ed oxcem in full without tho es. ho. Letters and roe. xts 8~dV ~roduct8. EJ SO'30'OO"W 64..74' S( C