Loading...
Northlake 635(2)-LR 970106Ma TECHNOLOGIES INC CLIENT: PROJECT: SERVICES: REPORT OF WATER INJECTION INSPECTION Lincoln Proper~y Co. 500 N. AKARD, SUITE 300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PROJECT NO.: 09( REPORT NO.: 110( DATE OF SERVICE: AUTHORIZATION: REPORT DATE: PERFORM WATER INJECTION INSPECTION. REPORT OF INSPECTION ON THIS DATE, A MAXIM TECHNOLOGIES REPRESENTATIVE ARRIVED SCHEDULED TO PERFORM A WATER INJECTION INSPECTION AS SCHEE ATTACHED REPORT FOR RESULTS OF THE INSPECTION. TECHNICIAN TIHE: 6:30AM TO 6:30PM Technician: Daniel Hernandez Technician Reoor~ Distribution: (1) Lincoln Property Co. (1) ~UTLER C0#STRUCT[0# (1) BR0C~ETT-DAVIS-0EAKE, l#C. (1) THE CITY OF C0PPELL (1) THE CITY OF C0PPELL 10gt DY Ow le~em and rel~,~ ~e f~ the u~u~ve uae ~ the ~n~to w~ they ~l addressed~'/ //"n 'and ~ ~ ~ ~1 dm Tach. ·Southwestem Labs 575 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 - ' Telephone: (214) 631-2700 FAX: (214} 920-1891 3605034 84 1/02/97 06/97 ON SITE AS ULED. SEE :H. -SOUTHWESTERN .LABS ject Manager TICNNOLOSIIS INC LINCOI2q I~OPgRTY COMP~ Project NU:0903605034 Service Date:01/02/97 2575 Lone Stat D~ive · P.O. Box 224227 · DSI; 4, Texu 75222 (214) 631-2700 · F~x (214) 920-1fl91 RF~PORT OF WATER INJECTION INSPECTION Report Na: 110684 Page 2 On lanuary 2, 1996, a representative of MAXIM TECHNOLOGIES, INC. ob.~ of water into the building subgrade for ~mplianc~ with project specifications. observed. 2. 3. 4. 4 Injection depth intervals marked on fig. Suffactant added to each load. Injection pressure maintained at 50 PSI. Probes forced downward in 12 to 18 inch intervals until Total depth required on injection 10 feet. Spacing for injection @ a five feet maximum. See attached diagram. TIME: 6:30 am to 6:30 pm uced exc~ ;n full withou~ the N, :nc. Letter~ and ret}ohs apply ~'ociuctJ. :ned the pressure injection the following was t IoF'T I i ~o?~