Northlake 635(2)-LR 970106Ma
TECHNOLOGIES INC
CLIENT:
PROJECT:
SERVICES:
REPORT OF
WATER INJECTION INSPECTION
Lincoln Proper~y Co.
500 N. AKARD, SUITE 300
ATTN: LARRY MOON
Dallas, TX 75201
COPPELL BUSINESS CENTER
WRANGLER DR. & BELTLINE RD.
COPPELL, TX
PROJECT NO.: 09(
REPORT NO.: 110(
DATE OF SERVICE:
AUTHORIZATION:
REPORT DATE:
PERFORM WATER INJECTION INSPECTION.
REPORT OF INSPECTION
ON THIS DATE, A MAXIM TECHNOLOGIES REPRESENTATIVE ARRIVED
SCHEDULED TO PERFORM A WATER INJECTION INSPECTION AS SCHEE
ATTACHED REPORT FOR RESULTS OF THE INSPECTION.
TECHNICIAN TIHE: 6:30AM TO 6:30PM
Technician: Daniel Hernandez
Technician
Reoor~ Distribution: (1) Lincoln Property Co.
(1) ~UTLER C0#STRUCT[0#
(1) BR0C~ETT-DAVIS-0EAKE, l#C.
(1) THE CITY OF C0PPELL
(1) THE CITY OF C0PPELL
10gt DY Ow le~em and rel~,~ ~e f~ the u~u~ve uae ~ the ~n~to w~ they ~l addressed~'/ //"n 'and ~ ~ ~ ~1
dm Tach. ·Southwestem Labs
575 Lone Star Dr. · P.O. Box 224227
Dallas, Texas 75222 - '
Telephone: (214) 631-2700
FAX: (214} 920-1891
3605034
84
1/02/97
06/97
ON SITE AS
ULED. SEE
:H. -SOUTHWESTERN .LABS
ject Manager
TICNNOLOSIIS INC
LINCOI2q I~OPgRTY COMP~
Project NU:0903605034
Service Date:01/02/97
2575 Lone Stat D~ive · P.O. Box 224227 · DSI; 4, Texu 75222
(214) 631-2700 · F~x (214) 920-1fl91
RF~PORT OF
WATER INJECTION INSPECTION
Report Na: 110684
Page 2
On lanuary 2, 1996, a representative of MAXIM TECHNOLOGIES, INC. ob.~
of water into the building subgrade for ~mplianc~ with project specifications.
observed.
2.
3.
4.
4
Injection depth intervals marked on fig.
Suffactant added to each load.
Injection pressure maintained at 50 PSI.
Probes forced downward in 12 to 18 inch intervals until
Total depth required on injection 10 feet.
Spacing for injection @ a five feet maximum.
See attached diagram.
TIME: 6:30 am to 6:30 pm
uced exc~ ;n full withou~ the
N, :nc. Letter~ and ret}ohs apply
~'ociuctJ.
:ned the pressure injection
the following was
t
IoF'T
I i
~o?~