Northlake 635(7)-CS 990610To: Mike Martin, Asst. City Engineer
Doug Stevens, Engineering Technician
Glenn Hollowell, Director of Public Works
Greg Jones, Chief Building Official
Travis C~e Marshal
From: Larry D.' ,~~/~fUction Inspector
RE: Final WALIGTHRU for Northlake 635 Business Park, Block B, Lot 2
Copper Call Center
Date: June 10, 1999
A final walk-thru for utilities and paving on the referenced project has been scheduled for
Friday, June 18, 1999 at 8:30 a.m.
If I can be of further assistance please call me at 972-304-3684.
cc: Todd Jackson, Halff Assoc. (fax: 214-739-0095)
Jim Maddox, Maddox Const. (fax: 817-596-0399)
Joe White, Bob Moore Const. (fax: 817-640-1250)
Lee Stone, Commercial Inspector
davis/calctrwt