Northlake 635(7)-CS 980803 August 3, 1998 Pat Acker, P.E. ltalff Associates ~ 8616 Northwest Plaza Drive Dallas, TX 75225 RE: Northlake 63S Business Park, Block B, Lot 2 Development Fee Assessment (Revised) Dear Mr. Acker: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $59,815.77 and forward to Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely~/5{~ ~ Martin, P.E. Assistant City Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Northlake 635 Business Park, Block B, Lot 2 (Revised) Date: 8/3/98 TOTAL AMOLrNT'DUE. ''~ FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $8,325.00 $8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $192.15 (100 % due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $5,956.65 (100 % due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100 % due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $90.00 (100 % due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $47,890.77! $47,890.77 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts ....... TOTAL $66,389.57 "~ TOTAL AMOUNT DUE PRIOR TO COU,'NCIL APPROVAL $59,815.77 _-._- ~ Dt:.¢ELOPMENT FEE WORKSHE.-T PROJECT: Northlake 635 Business Park, Block B, Lot 2 (Revised) DATE: 8/3/98 Water Impact Fee: Domestic Meter(s): 1 - 2 inch = 8 ESU's Irrigation Meter(s): 1 - 2 inch = 8 ESU's = ESU's Fireline Meter(s): 2 - 8 inch = 2.5 ESU's Total #: 18.5 ESU's @ $450.00 ea. $8,325.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. $200.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic ~Vater Meter Fee: Total #: 1 Domestic Meter(s) @ $192.15 $192.15 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total Cf: 1 Irrigation Meter(s) @ $192.15 $192.15 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 2 Fireline Meter(s) @ $2,882.25 $5,764.50 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 ea. $35.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. $90.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 8 @ $450.00 ea. $3,600.00 Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (,All developments): Total #: 1 Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Page 3 Dr..VELOPMENT FEE WORKSHI=.=T Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ $150.00 / Lot N/A N/A Multi-family @ $75.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot N/A N/A Multi-family @ $350.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A Single-family @ $1285.00 / Lot N/A _ N/A Multi-family @ $1285.00 / Unit N/A ___ (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $47,890.77 Street Lighting Fees: Information not Assessed for lighting in the City's right-of-way, available at this time This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Information not Assessed for signage in the City's right-of-way, available at this time_. (See attached fee calculations if applicable) Construction Inspection Fees: Need submittal of A copy of the development contract must be submitted for assessment, development contracts The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 4 ROAD *VAY IMPACT FEE CALCULA · iONS PROJECT: Northlake 635 Business Park, Block B, Lot 2 (Revised) DATE: 8/3/98 ROADWAY IMPACT FEE: Service Area * 10 Category ** Office Land Use ** General Office Building Building Size (Sq. Ft.) 80,018 Development Units ** 80.018 Vehicle Miles per Development Unit ** 3.99 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x l(Vehicle Miles per ~Developmen? Unit) x (_F. ee per _Vehicle Mile) = _ _ $95,781.55 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) 50 % Credit as per approval by City Manager = $47,890.77