Loading...
Northlake 635(2)-LR 961216TECHNOLOGIES INC CUENT: L£ncoln Property Co. 500 N. AF~%RD, SUITE 300 ATTN: LARRY MOON Dallas, TX 75201 PROJECT: 25~ REPORT OF WATER INJECTION INSPECTION COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX SERVICES: PERFORM WATER INJECTION INSPECTION. ON THIS DATE, INSPECTION. Technician: Daniel Hernandez Technician Report Distribu~on: (1) Lincotn Property Co. (1) BUTLER CONSTRUCTION INCO~P. (1) BROCKETT-DAVIS-DRAK:E, INC. (1) THE CITY OF COPPELL (1) THE CITY OF COPPELL lOge DY PROJECT NO.: 09031 REPORT NO.: 1097E DATE OF SERVICE: 12 AUTHORIZATION: REPORT DATE: 12/1 REPORT OF INSPECTION MAXIM TECHNOLOGIES REPRESENTATIVE PERFORMED SEE ATTACHED REPORT FOR RESULTS FOR RESULTS OP ~ Tech. ·Southwestem Labs '5 Lone Star Dr. · P.O. Box 224227 Dellae, Texe, 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 ~05034 4 ~11/9G WATER INJECTION THE INSPECTION. MAXIM TEC ..SOU WE ERN LABS PtfoJect Manager TECNNQLOSIES INC LINCOLN PROPERTY COMPANY Project N°:0903605034 Service Date: 12/11/96 2575 Lone Star Drive * P.O. Box 224227 · Datla~l~ Texu 75222 (214} 531-2700 · F~ (214) 920-18'~ ' REPORT OF WATER INJECTION INSPECTION Report :109764. Page 2 On December 11, 1996, a representative of MAXIM TECHNOLOGIES, INC. injection of water into the building subgrade for compliance with project specific observed. 2. 3. 4. ,bserved the pressure ations. The following was Injection depth intervals marked on rig. Surfactant added to each load. Injection pressure maintained at 50 PSI. Probes forced downward in 12 to 18 inch intervals until Total depth required on injection 10 feet. Spacing for injection @ a five feet maximum. RE~~: SFF ATTACHED DIAGRAM. TIME: 6:30 am to 7:00 pm Our lettere and reporta are for the exclueive uae of the c~ent to whom they are addre~ed and eha# not be relxoc~ a~Orovd of the t~'dng I~boratoW. The u~e of our n~ne mu~t receive Ixior written ~olxovd of Mmdrn Technoiogi, only to the sample ta~ted ,ndl,r iml~ected ~nd ,re not indicative of the quantity of apparently identical or C(1) w~d except in full without the m. Inc. Letter, and reoort, aoply ~oduct,. / / //! YICH NOLOIIIES INC LINCOLN PROPERTY COMPANY Project N~:0903605034 Service Date: 12/11/96 2575 Lone Star Ddv® · P.O. Box 224227 · DIdla B, Texa, 75222 (214) 631-2700 * Fax (214) 920-18:11 REPORT OF WATER INJECTION INSPECTION Report: 109764 Page 3 On December 11, 1996, a representative of MAXIM TECHNOLOGIF_.S, INC. (,bserved the pressure injection of water into the building subgrade for compliance with project specifi~ ~ttions. The following was observed. 1. Injection depth intervals marked on rig. } IO 2. Surfactant added to each load. 3. Injection pressure maintained at 50 PSI. 4. Probes forced downward in 12 to 18 inch intervals until 'F_S refusal. 5. Total depth required on injection 10 feet. 'F_,S 6. Spacing for injection @ a five feet maximum. S~ ATrACI-I~,D DIAGRAM. TIME: 6:30 am to 7:00 pm Our I~ttm ~nd r~m~ ~re for the ~xol~ive ~e of ~he ~li~t to whom they ~re ~ldr~sed ~1 ah,a! not b~ r~'od, i¢~1 exert in full without the ~.ov,a of the t~tin~ I~ao~toeV. lhe t~e of our nm mu~t r~ive ~io* only to the sample tested and/or inspected ~nd ara not indlc~tive of the quantity of a;)parontly idonticai or similar ~oduct.. ..!