Loading...
Minyard-LR 961105 G~OTEC:-IN CAL AND ~ ~ I'---I I I p EN'/ RO~IMC-.NTA~ COi~SUL-ANTS CONCRETE CYLINDER TEST REPORT Minyard's Facility Expansion Freeport Parkway and Bethel Road Coppell, Texas REPORTED TO: Minyard Properties REPORT NO. 77 P.O. Box 518 REG PROJECT NO. 2891.1 777 Freeport Parkway SAMPLE DATE: 11-05-96 Coppell, Texas 75019 TECHNICIAN: B. Lucas Mr. Marion Pritchett CONTRACTOR: Facility Construction Management, Inc. Location of Sample 1 Piers - stair landings, 2nd, 3rd and 4th east of the 9/9 yds NW corner Design Information ~i~s~iN~I~i~¢~i;~i~i~;i~i~i~i~ii~i~f~t~i~i~i~i~!~?~i!;i~:::Ii:.~;~i~:i~i~i~is~i~i~d~s~"dt~:s;i~?~.;~ 1 TXl 8273 4000 Test Resul~ 3 7795 11-12-96 7 83500 2950 7795 12-03-96 28 111000 3930 7795 32-03-96 28 ~ 09300 3870 3900 7795 Hold Cylinder Data I 7795 7.00 75 80 N/A 02:30 PM 698335 Distribution: (1) Minyard Prope~ies/ Submitted by: Mr. Marion Pritchett (~) Facility Construction Managemen~ REED ENGINEERING GROUP, INC. Mr. Dirk Harrison (1) City of Coppell/Mr. Lar~ Davis Original Signed By (1) City of Coppell/Mr. Lee Stone (1) Facility Construction Management/ keith E. Atkins Mr. Bill Moultrie kE~cdl (1) Facility Engineering, Inc./ Ms. Ter~ Fernandez (1) Dalcan, Inc./Mr. Jim renaud 2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 · TEL [214] 350 5600 · ~× [214] 350 0019