Minyard-LR 961105 G~OTEC:-IN CAL AND ~ ~ I'---I I I p
EN'/ RO~IMC-.NTA~ COi~SUL-ANTS
CONCRETE CYLINDER TEST REPORT
Minyard's Facility Expansion
Freeport Parkway and Bethel Road
Coppell, Texas
REPORTED TO: Minyard Properties REPORT NO. 77
P.O. Box 518 REG PROJECT NO. 2891.1
777 Freeport Parkway SAMPLE DATE: 11-05-96
Coppell, Texas 75019 TECHNICIAN: B. Lucas
Mr. Marion Pritchett
CONTRACTOR: Facility Construction Management, Inc.
Location of Sample
1 Piers - stair landings, 2nd, 3rd and 4th east of the 9/9 yds
NW corner
Design Information
~i~s~iN~I~i~¢~i;~i~i~;i~i~i~i~ii~i~f~t~i~i~i~i~!~?~i!;i~:::Ii:.~;~i~:i~i~i~is~i~i~d~s~"dt~:s;i~?~.;~
1 TXl 8273 4000
Test Resul~
3 7795 11-12-96 7 83500 2950
7795 12-03-96 28 111000 3930
7795 32-03-96 28 ~ 09300 3870 3900
7795 Hold
Cylinder Data
I 7795 7.00 75 80 N/A 02:30 PM 698335
Distribution: (1) Minyard Prope~ies/ Submitted by:
Mr. Marion Pritchett
(~) Facility Construction Managemen~ REED ENGINEERING GROUP, INC.
Mr. Dirk Harrison
(1) City of Coppell/Mr. Lar~ Davis Original Signed By
(1) City of Coppell/Mr. Lee Stone
(1) Facility Construction Management/ keith E. Atkins
Mr. Bill Moultrie kE~cdl
(1) Facility Engineering, Inc./
Ms. Ter~ Fernandez
(1) Dalcan, Inc./Mr. Jim renaud
2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 · TEL [214] 350 5600 · ~× [214] 350 0019