Loading...
Northlake 635(3)-CS 981118MEMO~~ To: From: RE: Date: Chris Buffer, Buffer Construction Larry Davis, Construction Inspector~ WALK-THRU fo~ ............. ~~ Beitline at La~ November 18, 1998 A final walk-thru for streets, utilities and drainage on the referenced scheduled for Monday, November 23, 1998 at 9:00 a.m. If I can be of further assistance please let me know. Mike Martin, Asst. City Engineer Doug Stevens, Engineering Technician Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal Lee Stone, Commercial Inspector P.O. Box 478 Coppell, Texas 75019 972-462-0022 ~eshore ~roject l~s been