Loading...
Northlake 635(3)-CS 980729MEMORANDUM To.' From: RE: Date: Mike Martin, Asst. City Enigneer Doug Stevens, Engineering Technician Glenn HoHowell, Director of Public Works Greg/ones, Chief Building Official Travis Cramp, Fire Marshal Larry Davis, Construction ~j 0 WALK-THRU for Coppeil Business Park H July 29, 1998 A final walk-thru for paving and utilities on the referenced project has be Friday, July 31, 1998 at 2:00 p.m. If I can be of further assistance please let me know. cc: Sherman Hudson, Texas Sprinkler Chris Buffer, Butler Construction Tfi Dal Ltd. Lee Stone, Building Inspections Fax/(817)596-9349 Fax/(817)589-9618 Fax/(817)481-8195 file/ldavislOwalkthru, mm n scheduled for