Loading...
Minyard-LR 961004 GEOTEC~N'CAL AND B J~J ~ I I p ENVIRO~P1EI~.'r AL CONSULTANTS CONCRETE CYLINDER TEST REPORT Minyard's Facility Expansion Freeport Parkway and Bethel Road Coppell, Texas REPORTED TO: Minyard Properties REPORT NO. 60 P.O. Box 518 REG PROJECT NO. 2891.1 777 Freeport Parkway SAMPLE DATE: 10-04-96 Coppell, Texas 75019 TECHNICIAN: J. Gray Mr. Marion Pritchett CONTRACTOR: Facility Construction Management, Inc. Location of Sample J I Piers - QQ-15.3, QQ-15.4, QQ-16 20~20 yds J Design Information 1 TXl 8273 4000 Test Results , 7247 ~ 0-~ 1-96 7 83300 2950 7247 ,1-0,-96 28 ~ ~ 5200 4080 7247 ,1-0, -96 28 1 ~ 5600 4090 4090 7247 Hold Cylinder Data , 7247 5.50 7~ 80 N/A 02:05 PM 678943 Distribution: (~) Minyard Propedies/ Submitted by: Mr. Marion Pritchett (~) Facility Construction Management/ REED ENGINEERING GROUP, INC. . ~Dirk Harrison (~City of Coppell/Mr. Lar~ Davis Original Signed By (,) City of Coppell/Mr. Lee Stone (,) Facility Construction Management/ Keith E. Atkins Mr. Bill Moultrie KEA/cdl (,) Facility Engineering. Inc./ ' Ms. Ter~ Fernandez (,) Dalcan. Inc./Mr. Jim Renaud 2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 · TELl214] 350 5600 · ~AX [214] 350 0019