Loading...
Minyard-LR 960924 GEOTECHNIICAL A",ID ~ F~ J'-"J U F~ -.'xi'vq RC N M E N T A_ CONSULTANTS CONCRETE CYLINDER TEST REPORT Minyard's Facility Expansion Freeport Parkway and Bethel Road Coppell, Texas REPORTED TO: Minyard Properties REPORT NO. 44 P.O. Box 518 REG PROJECT NO. 2891.1 777 Freeport Parkway SAMPLE DATE: 09-24-96 Coppell, Texas 75019 TECHNICIAN: J. Gray Mr. Marion Pritchett CONTRACTOR: Facility Construction Management, Inc. Location of Sample Piers - HH-~3.2, HH-~3.4, HH-~3.5 ~0/50 yds Design Information 1 TXI 8273 4000 Test Results 1 7006 10-01-96 7 110700 3920 7006 10-22-96 28 143500 5080 7006 10-22-96 28 132600 4690 4890 7006 Hold Cylinder Data I 7006 5.50 80 84 N/A 01:20 PM 670358 Distribution: (1) Minyard Properties/ Submitted by: Mr. Marion Pritchett (1) Facility Construction Management/ REED ENGINEERING GROUP, INC. r~. Dirk Harrison (1,)~,ity of Coppell/Mr. Larry Davis Original Signed By (1) City of Coppell/Mr. Lee Stone (1) Facility Construction Management/ Keith E. Atkins Mr. Bill Moultrie KEA/cdl (1) Facility Engineering, Inc./ Ms. Terry Fernandez (1) Dalcan, Inc./Mr. Jim Renaud 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TE~ [214] 350 5600 · ~^X [214] 350 0019