Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Minyard-LR 960826
GEO~ECi--N CAL .:..%~' G ~ ~ I I ~ E'"- ~' F.O I% I'" E Ix - ~' L CONCRETE CYLINDER TEST REPORT Minyard's Facility Expansion Freeport Parkway and Bethel Road Coppell, Texas REPORTED TO: Minyard Properties REPORT NO, 19 P.O. Box 518 REG PROJECT NO. 2891.1 777 Freeport Parkway SAMPLE DATE: 08-26-96 Coppell, Texas 75019 TECHNICIAN: B. Steadman & Mr. Marion Pritchett S. Hope CONTRACTOR: Facility Construction Management, Inc. Location of Sample 1 Floor slab - 50'N,50'W of the NE corner of existing 20/500 yds building 2 Floor slab - 90'N,50'W of the NE corner of existing 80/500 yds building 3 Floor slab - 110'N,25'W of the SE corner of existing 130/500 yds building 4 Floor slab - 140'N,30'W of the NE corner of existing 170/500 yds building 5 Floor slab - 150'N, 15'W of the NE corner of existing 210/500 yds building 6 Floor slab - 200'N,35'W of the NE corner of existing 260/500 yds building 7 Floor slab - 220'N,50'W of the NE corner of existing 320/500 yds building 8 Floor slab - 250'N,50'W of the NE corner of existing 390/500 yds building 9 Floor slab - 325'N, 15'W of the NE corner of existing 420/500 yds building 10 Floor slab - 360'N,40'W of the NE corner of existing 470~500 yds building Information 1 TXl 0020 3500 2 TXI 0020 3500 3 TXI 0020 3500 4 TXI 0020 3500 5 TXI 0020 3500 6 TXl 0020 3500 7 TXl 0020 3500 8 TXI 0020 3500 9 TXl 0020 3500 10 TXI 0020 3500 2424 S-~TZ DR· S~!TE 400 · D.,~:_LAS "tX 75235 · ---_ _2.4,r . ' 350 5600 · =:,.,' [2141. 350 0019 Test Results 1 3472 09-02-96 7 118300 4190 , 3472 09-23-96 28 160200 5670 3472 09-23-96 28 148400 5250 5460 3472 Hold 2 3473 09-02-96 7 99600 3520 3473 09-23-96 28 136600 4830 3473 09-23-96 28 138500 4900 4870 3473' Hold 3 3474 09-02-96 7 108700 3850 3474 09-23-96 28 123900 4390 3474 09-23-96 28 132900 4700 4550 3474 Hold 4 3475 09-02-96 7 105300 3730 3475 09-23-96 28 131300 4650 3475 09-23-96 28 129800 4590 4620 3475 Hold 5 3476 09-02-96 7 98500 3490 3476 09-23-96 28 127100 4500 3476 09-23-96 28 123100 4360 4430 Hold 6 3477 09-02-96 7 104100 3680 3477 09-23-96 28 131400 4650 3477 09-23-96 28 120400 4260 4460 Hold 7 3478 09-02-96 7 112100 3970 3478 09-23-96 28 135100 4780 3478 09-23-96 28 142100 5030 4910 3478 Hold 8 3479 09-02-96 7 101100 3580 3479 09-23-96 28 133300 4720 3479 09-23-96 28 132100 4680 4700 3479 Hold 9 3480 09-02-96 7 113600 4020 3480 09-23-96 28 140000 4950 3480 09-23-96 28 131500 4650 4800 Hold 10 3481 09-02-96 7 90400 3410 3481 09-23-96 28 121000 4280 3481 09-23-96 28 125100 4430 4360 3481 Hold Cylinder Data 1 3472 4.00 76 86 N/A 04:35 AM 652678 2 3473 3.25 76 86 N/A 04:55 AM 652686 3 3474 4.00 76 87 N/A 05:25 AM 652707 4 3475 4.25 77 87 N/A 06:00 AM 652737 5 3476 5.00 75 88 N/A 06:25 AM 652756 Cylinder Data 6 3477 4.00 76 87 N/A 07:45 AM 652807 7 3478 4.00 76 88 N/A 08:20 AM 652884 ' 8 3479 4.00 78 88 N/A 09:05 AM 652991 9 3480 4.00 78 87 N/A 09:25 AM 653048 10 3481 4.50 78 86 N/A 10:10 AM 653085 Distribution: (1) Minyard Properties/ Submitted by: Mr. Marion Pritchett (1) Facility Construction Management/ REED ENGINEERING GROUP, INC. Mr. Dirk Harrison (1) City of Coppell/Mr. Larry Davis Original Signed By Keith E. Atkins KENcdl