Minyard-LR 960820 (2). CONCRETE CYLINDER TEST REPORT
Minyard's Facility Expansion .
Freeport Parkway and Bethel Road
Coppell, Texas
REPORTED TO: Minyard Properties REPORT NO. 15
P.O. Box 518 REG PROJECT NO. 2891.1
777 Freeport Parkway SAMPLE DATE: 08-20-96
Coppell, Texas 75019 TECHNICIAN: B. Steadman
Mr. Marion Pritchett
CONTRACTOR: Facility Construction Management, Inc.
Location of Sample
1 Piers - PP-8.05, HH.2-8.1, HH.2-7.4 50~55 yds
Design Information
1 TXI 8273 4000
Test Results
I 3348 08-27-96 7 100900 3570
3348 09-17-96 28 118100 4180
3348 09-17-96 28 134000 4740 4460
3348 Hold
Cylinder Data
I 3348 4.25 94 93 N/A 03:00 PM N/A
Distribution: (1) Minyard Properties/ Submitted by:
Mr. Marion Pritchett
(1) Facility Construction Management/ REED ENGINEERING GROUP, INC.
Mr. Dirk Harrison
(1) City of Coppell/Mr. Larry Davis Original Signed By
Keith E. Atkins
KENcdl
2424 STUTZ DR · SUITE 400 · DALLAS TX 75235 · --=.. [214] 350 5600 · ~-'.,. :214] 350 00,9