Minyard-LR 960819 (2)r[17~; ~lTOlfUGlliTn M~Tl~/i~715 Tffsfing To; La/Ty~a¥i$ Oate: 9/~/9o Time:
CONCRETE CYLINDER TEST REPORT
Minyard's Facility Expansion
Freeport Parkway and Bethel Road
Coppell, Texas
REPORTED TO: Minyard Properties REPORT NO. 14
P.O. Box 518 REG PROJECT NO. 2891.1
777 Freeport Parkway SAMPLE DATE: 08-19-96
Coppell, Texas 75019 TECHNICIAN: B. Steadman
Mr. Marion Pritchett
CONTRACTOR: Facility Construction Management, Inc.
Location of Sample
Set Number I Location -'- I Quantity Represented-
1 Piers - KK-5.9= KK-7.05, KK-8.05 44.5/44.5 yds
Design Information
Set NumbS__-" Concrete .. Mix'Identification Specified-Strength p~s.i.
1 TXI 8273 4000
Test Results
No. ID -"-r Date Tested . Test lbs. Strength p.s.i, p.s.i. '
1 3325 08-26-96 7 100400 3550
3325 09-16-96 28
3325 09-16-96 28
3325 Hold
Cylinder Data
: Set Cylinde;- Concret~ Air Time of Ticket.
No. : ID ~ Slump Air Temp. -'
. Temp. Entrainment Sample - Numti-er
1 3325 3.75 93 88 N/A 03'45 PM 648393
Distribution: (1) Minyard Properties/ Submitted by:
Mr. Marion Pritchett
(1) Facility Construction Management/ REED ENGINEERING GROUP, INC.
Mr. Dirk Harrison
(1) City of Coppell/Mr. Larry Davis Original Signed By
Keith E. Atkins
KEA/cdl