Loading...
Northlake 635(3)-CS 970918CASE: (COPPELL BUSINESS CENTER H, LOT 1, ] CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT REPLAT AND SITE PLAN OF A PO]~TION OF NORTHLAKE 635 BUSINESS PARK ~LOCK 1) P & Z HEARING DATE: September 18, 1997 C.C. HEARING DATE: October 14, 1997 LOCATION: SIZE OF AREA: Southwest comer of Lakeshore Drive and Belt 33.2 acres; 4 Buildings, Total 530,800 comb Building A: 67,200 s.f. Building B: 84,000 s.f. Building C: 170,000 s.f. Building D: 209,600 s.f. LI (Light Industrial) CURRENT ZONING: Approval of Replat and Site Plan to allow the separate office/warehouse facilities. REQUEST: APPLICANT: Developer: Lincoln Property Company 3300 Lincoln Plaza 500 North Akard Dallas, TX 75201 (214) 740-3300 Planner/Engineer: Halff Associates, 8616 Northwest [ Dallas, TX 75225 (214) 739-0094 On January 10, 1996, City Council approved a replat this 33.2 acre tract of land. The plat never was re~ County. This was the original site Haverty F considered for its office/retail/distribution facility locating its facility on Gateway Boulevard. HISTORY: Beltline Road is an existing 6-lane divided mai wide right-of-way. Lakeshore Drive is an exisl undivided road built to standard in a 60-foot ri Item # 6 TRANSPORTATION: Line Road. ~ned square footage development of 4 Inc. 'laza Drive for 26.76 acres of ~orded with Dallas lmiture Company n Coppell before arterial in a 120' ing C2U, two-lane ght-of-way. SURROUNDING LAND USE & ZONING: North South - East - West - vacant (proposed Vari-Lite office/warehouse Industrial zoning vacant; "A" Agriculture North Lake; City of Dallas vacant; "A" Agriculture and "LI" Light Indm COMPREHENSIVE PLAN: The Comprehensive Plan shows the p~ light/industrial showroom uses. DISCUSSION: Staff would like to commend the applicant for the o, project. Orienting tracks courts away from the m limiting the use of exposed aggregate walls tO porti~ concealed from arterials, and extensively landscaping and the interiors of the site greatly enhances the aesth project and creates a highly-appealing work environm At the Development Review Committee, staff suggest{ modify the percentages of office space indicated fc match the provided parking spaces. Currently, if ti percentages were applied to each building, the apl parking spaces. The only other recourse the applica~ obtain from the Board of Adjustment a special excep of parking spaces. The zoning ordinance requires that planting islands no more than 15 parking spaces and the islands must tree. The landscape plan does not show the planting "B" and "C", and trees must be planted in the Plantint of parking spaces located against the southern elevati¢ RECOMMENDATION TO THE PLANNING AND ZONING COMMISS Staff recommends approval of the replat and the site plan subj conditions: 1) 2) 3) Modify the percentages of office space indicated fc match the provided parking spaces. Provide planting islands every 15 parking spaces. Provide at least one tree each for all planting islands. Item # 6 acility); "LI" Light rial 'operty suitable for ,erall design of the tjor thoroughfares, ms of the building both the perimeter ~tics of the overall ent. ..d that the applicant r each building to te maximum office flicant is short 18 it would have is to :ion for the number all be separated by :ontain at least one lands for Buildings ;islands in the strip o of Building "C". [ON: ect to the following r each buiMing to 4) 5) ALTERNATIVES: ATTACHMENTS: Overhead power lines along Beltline Road be remov~ Compliance with Engineering comments. 1) Recommend approval of the request 2) Recommend disapproval of the request 3) Recommend modification of the request 4) Take under advisement for reconsideration at a lat 1) Replat 2) Site Plan 3) Building Elevation for Building A 4) Building Elevation for Building B 5) Building Elevation for Building C 6) Building Elevation for Building D 7) Landscape Plan 8) Irrigation Plan 9) Departmental Comments Item # 6 i, if possible. er date. DEVELOPMENT REVIEW COMMYI'~'EE ENGINEERING COMMENTS I ! ITEM: ~tev~t a~ut S~te rta~ of a ron~,~ o! ~ro~ ~s that wal allow tl~ development of four faca~s on $$.2 aera of property, Ioea~ at tl~ so~lmest corner of Lakeslmre Drive and Belt Liae Road, at the ~ of Halff Assodates, Inc. I DRC DATE: August 2S, 1~)7 and ~ 4, 1~7 I COMMENT STATUS: .~'PRELIMINAR Y ~ ~ 1. Water line around site should be private, not public. 2. Roadway Impact Fee will be based on use.