Northlake 635(3)-CS 970806I Halff Associates
ENGINEERS · ARCHITECTS · SCIENTISTS
PLANNERS ° SURVEYORS
August 6, 1997
AVO 16455
Mr. Michael Martin
City of Coppell
255 Parkway Boulevard
Coppell, Texas 75019
Dear Mr. Martin:
Please review the attached site plan for fee estimate. Assume one 2" dot
one 2" irrigation meter for each building. The area for Building A is 67;
B is 84,000 fL2, Building C is 170,000 ft.2, and Building D is 201,600
12" double detector checks. Please mail this fee estimate to my attentior
address. If you have any questions or require any additional information
me. Thank you for your assistance.
Sincerely,
HALFF ASSOCIA
aestic meter and
!00 ft.2, Building
Assume three
at the above
please contact
FES, INC.
8616 NORTHWEST PLAZA DRIVE
DALLAS, TEXAS 75225
(214) 739-0094
FAX (214) 739~095
Todd Abbott, E.I.T.
Attac.hment
DALLAS ° FORT WORTH · HOU. STON · McALLEN
· WATER RESOURCES · LAND DEVELOPMENT · MUNICIPAL ° ENVIRONME
TRANSPORTATION
MECHANICAL ° ELECTRICAL · SURVEYING · GEOGRAPHIC INFORMATION SYSTE
ARCHITECTURE · LANDSCAPE ARCHITECTURE · PLANNING
qTAL ° STRUCTURAL
MS
N
3AIWO 3WOHS3NV]
(/~
JNI I~'1111 III .., ~_
Aug. 06, 1997 15:59:01
z'"l I I I I I IIII ~t~1 ,,!111
J lllHlll o oo~t.
IIIIIII-tli° " °
._JIIItlll IIIH~ H__
IIII
DEVELOPMENT FEE TABLE
Project:
Date:
Copper Business Center
8/8/97
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $32,175.00 $32,175.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $550.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $783.92
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $11,525.42
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $120.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $245.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $14,400.00 $14,400.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $200.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $200.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 N/A
(100% due prior to Council Approval)
Roadway Impact Fee $166,250.40 $166,250.40
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
ITOTAL $226,449.74
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $212,825.40
DEVELOPMENT FEE WORKSHEET
PROJECT: Coppell Business Center
DATE: 8/8/97
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
4 - 2 inch
4 - 2 inch
3 - 10 inch
32
32
7.5
Fireline Meter(s):
Total #: 71.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 11 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 4 Domestic Meter(s) @ $195.98
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 4 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 3 Fireline Meter(s) @
(100% due prior to issuance of water meters)
$195.98
$3,580.50
Water Meter Deposit Fee (Domestic):
Total #: 4 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 7 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters fiSH'
32
@ ~450.00 ea
Wastewater Tap Inspection Fee:
Total #: 4 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 4 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
Page 1
ESU's
ESU's
ESU's
ESU's
$32,175.00
$550.00
$783.92
$783.92
$0.00
10,741.50
~ 120.00
$245.00
$14,400.00
$200.00
$200.00
DEVELOPMENT FEE WORKSHEET
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
N/A
N/A
N/A
N/A
N/A
N/A
$166,250.40
Information not
available at this time
Information not
available at this time
Need submittal of
development contracts
PROJECT:
DATE:
ROADWAY IMPACT FEE CALCULATIONS
Coppell Business Center
8/8/97
ROADWAY IMPACT FEE:
Service Area *
Category **
Land Use **
Buildin~ Size (Sq. Ft.)
Developmem Units **
10
Indus1
General Linch
522,~
522
rial
Industrial
Vehicle Miles per Development Unit ** 1.0 ~
Fee per Vehicle Mile *** $3(3
Roadway Impact Fee due = (Development Units) x
'Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $166,250.40
* (Figure 2 - Roadway Impact
** (Table 3 - Roadway Impact l
*** (Schedule 2, Page 3 - Roadx~
Fee Study)
~ee Study)