Loading...
Northlake 635(3)-CS 970806I Halff Associates ENGINEERS · ARCHITECTS · SCIENTISTS PLANNERS ° SURVEYORS August 6, 1997 AVO 16455 Mr. Michael Martin City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 Dear Mr. Martin: Please review the attached site plan for fee estimate. Assume one 2" dot one 2" irrigation meter for each building. The area for Building A is 67; B is 84,000 fL2, Building C is 170,000 ft.2, and Building D is 201,600 12" double detector checks. Please mail this fee estimate to my attentior address. If you have any questions or require any additional information me. Thank you for your assistance. Sincerely, HALFF ASSOCIA aestic meter and !00 ft.2, Building Assume three at the above please contact FES, INC. 8616 NORTHWEST PLAZA DRIVE DALLAS, TEXAS 75225 (214) 739-0094 FAX (214) 739~095 Todd Abbott, E.I.T. Attac.hment DALLAS ° FORT WORTH · HOU. STON · McALLEN · WATER RESOURCES · LAND DEVELOPMENT · MUNICIPAL ° ENVIRONME TRANSPORTATION MECHANICAL ° ELECTRICAL · SURVEYING · GEOGRAPHIC INFORMATION SYSTE ARCHITECTURE · LANDSCAPE ARCHITECTURE · PLANNING qTAL ° STRUCTURAL MS N 3AIWO 3WOHS3NV] (/~ JNI I~'1111 III .., ~_ Aug. 06, 1997 15:59:01 z'"l I I I I I IIII ~t~1 ,,!111 J lllHlll o oo~t. IIIIIII-tli° " ° ._JIIItlll IIIH~ H__ IIII DEVELOPMENT FEE TABLE Project: Date: Copper Business Center 8/8/97 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $32,175.00 $32,175.00 (100% due prior to Council Approval) Water Tap Inspection Fee $550.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $783.92 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $11,525.42 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $120.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $245.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $14,400.00 $14,400.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $200.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $200.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $166,250.40 $166,250.40 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts ITOTAL $226,449.74 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $212,825.40 DEVELOPMENT FEE WORKSHEET PROJECT: Coppell Business Center DATE: 8/8/97 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): 4 - 2 inch 4 - 2 inch 3 - 10 inch 32 32 7.5 Fireline Meter(s): Total #: 71.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 11 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 4 Domestic Meter(s) @ $195.98 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 4 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 3 Fireline Meter(s) @ (100% due prior to issuance of water meters) $195.98 $3,580.50 Water Meter Deposit Fee (Domestic): Total #: 4 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 7 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters fiSH' 32 @ ~450.00 ea Wastewater Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 4 Lots @ $50.00 ea. (100% due prior to issuance of building permit) Page 1 ESU's ESU's ESU's ESU's $32,175.00 $550.00 $783.92 $783.92 $0.00 10,741.50 ~ 120.00 $245.00 $14,400.00 $200.00 $200.00 DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 N/A N/A N/A N/A N/A N/A $166,250.40 Information not available at this time Information not available at this time Need submittal of development contracts PROJECT: DATE: ROADWAY IMPACT FEE CALCULATIONS Coppell Business Center 8/8/97 ROADWAY IMPACT FEE: Service Area * Category ** Land Use ** Buildin~ Size (Sq. Ft.) Developmem Units ** 10 Indus1 General Linch 522,~ 522 rial Industrial Vehicle Miles per Development Unit ** 1.0 ~ Fee per Vehicle Mile *** $3(3 Roadway Impact Fee due = (Development Units) x 'Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $166,250.40 * (Figure 2 - Roadway Impact ** (Table 3 - Roadway Impact l *** (Schedule 2, Page 3 - Roadx~ Fee Study) ~ee Study) ay Impact Fee Study)