Loading...
Minyard-LR 961213 (2)From' 'Conctruction Material~ Te~ting To: t.arry .CLevis Date: 1/?/g7 Time: 00:03:03 Page 5 of ~ CONCRETE CYLINDER TEST REPORT Minyard's Faoility Expansion Freeport Parkway and Bethel Road Coppeli, Texas REPORTED TO: Minyard Properties REPORT NO. 87 P.O. Box 518 REG PROJECT NO. 2891.1 777 Freeport Parkway SAMPLE DATE: 12-13-96 Coppell, Texas 75019 TECHNICIAN: J. Ledbetter Mr. Marion Pritchett CONTRACTOR: Facility Construction Management, Inc. Location of Sample ___ Set Number I Location I Quantity Represented___ ! Floor slab -hne HH5-11 10.'3.20 '/ds 4 Floor slab - hne ~:H.._,-,3 1 160/320 yds 5 Floor slab - i:,ne HH.8-14 0 210/320 yds 6 Floor slab -ii2e HH.4-15 270/320 ',./ds 7 Floor slab - !~ne HH.8-16.4 300/320 yds Design Information I Sourceof I Set Number , Concrete I Mix Identification Specified Strength p.s.i. I TXi 20 3-503 Z TXI 20 3500 4 'TXI 20 35'30 5 TX:. 20 3500 6 TX~ 20 3500 7 TX' 20 3500 Test Results Set ICylinderI I~ Age~ ITotalLoadi Compressive IAverageStrength No. I ID . Date Tested ~ Test lbs. i Strength p.s.!. . p.s.i. I 83.5.7 12-:0-96 7 95500 3380 8387' 01 '0 o? 28 3387 0'1 -!0-97 28 838'7 Ho,d 2 8388 ! 2-20-96 7 95300 3370 8388 01-10-97 28 8388 01-!0-97 28 8388 Ho''~. .~ 3 8389 i ?-~0--96 7 ~ ~,n 8389 91-!0-97 28 6389 01~10-97 28 8389 Hold Testing To'. Larry~vis Date: ~J7J07 Time: 00:04:St Page; of {; No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. - 4 8390 12-20-96 7 85800 3040 8390 01-i0-97 28 8390 01 -i 0-97 28 8390 Hold 5 8391 12-20-96 7 106700 3780 8391 01-!0-97 28 839! 01-I0-97 28 8391 Hold 6 8392 12-20-96 7 98200 3480 8392 01 -i 0-97 28 8392 0!-10-97 28 8392 Hold 7 8393 ! 2-20-96 7 94300 3340 8393 0!-10-97 28 8393 01-10-97 28 8393 Hold Cylinder Data No. ID Slump Air Temp.- Temp. Entrainment Sample: Number:- 1 8387 4 75 61 74 N/A 04:!0 AM 719362 2 8388 5.00 6! 67 N/A 04:50 AM 71937! 3 8389 4 50 61 67 NiA 05'45 AM 719392 4 8390 4 75 6! 69 N/A 06.25 AM 7i9429 5 8391 4.75 66 72 N/A 07:30 AM 719502 6 8392 5 00 69 74 N/A 08:45 AM 719644 7 8393 5.00 70 76 N/A 09:55 AM 719711 Distribution: (1) Minyard Properties...-' Submitted by: Mr. Marion Pritchett (1) Facility Construction Management/ REED ENGINEERING GROUP, INC. Mr. Dirk Harrison (1) City of Coppell/Mr. Larry Davis Original Signed By (1) City of Coppell/Mr. Lee Stone (1) Facility Construction Management/ Keith E. Atkins Mr. Bill Moultrie KEA/cdl (1) Facility Engineering, Inc./ Ms. Terry Fernandez (1) Dalcan, Inc./Mr. Jim Renaud