Loading...
North Texas Mail-CS 890123January 23. 1989 City E rltJi neet City 9( Coppell 552 Park Blvd. Coppe,,. e Re: '~ Drainage Improvements ~ P~opoSed 6 F~e~~-:PO~a~erVice Dear Mr. Doyle: At your instructions, we have reviewed a proposed alignment for a 6" ~oFce main. Our concerns are as follows: 1. As proposed, the force main crosses a drainage easement at the northwest corner of the Minyard's site. A utility or sanitary sewer easement will be needed from Minyard's. ~. Once this force main is built, it will be awkward to relocate. The proposed alignment fronting Minyard's may conflict with construction of a second 10' x 5' culvert required to operate current Royal Lane hydraulics. Full development will require additional culverts. How will these probable facilities tie into the Postal drainage at the northwest corner of the Minyard site and clear this proposed force main? Sincerely, Director, Civil Engineering CLS/np