Loading...
Northlake 635(7)-LR 980818CONCRETE COMPRi .SIVE STRENGTH TES_ ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Serw'ice: 07/17/1998 Report No.: 9818337 08/18/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: UrentisseropertiesLimited, Inc. Project: Calling Center COPY Atto: David Glass Coppell, Texas 3890 W. N.W. Hr%w, Suite 400 Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Batler/BECK CONCRETE CLASS: 9349 CONCRETES[.PPLIER: Pioneer PL&CEMENTDATE: 07/17/1998 BATCHTIME: N/A PLANT: 16 TIME SAMPLED: 1 1: 1 5 am BY: Damon Elrod SPECIFICATION REQUIREMENTS WEATHER CO.nmTIONS: Partly cloudy, light winds STRENGTH: 4000 psi @ 28 Days TEMPERAT[.RE(F)-.SIR 90 F CONCRETE: 96 F SLUMP: 5" TR[.CKNO: 843 TICKETNO: 729013 .&IR: N/A AIR CONTENT (%): N.:'A ['NIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION': Grade beam D-F, 10; Panels MP-I, MP-2 and MP-3 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Grade beam E/10 REPORT OF TESTS ACCUM[.LATIVE YARDS: 30 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE I.OAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 6.00* 07/24/1998 7 96740 3420 1 2 6.00* 07/24/1998 7 97480 3450 Average 3440 1 3 6.00* 08/14/1998 28 128240 4540 1 4 6.00* 08/14/1998 28 133210 4710 Average 4630 *Does nor .r. ee.z project specificaticns. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of IIBC Engineering, Inc. 01SS Page I of 2 CONCRETE COMPRI _SIVE STRENGTH TES _ ENGINEERDG, INC. 8901 Carpenter Fr~3'., Suite #100 Dallas, Texas 75247 Date of Service: 07/17/1998 Report No.: 9818337 Report Date 08/18/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, InC.Attn: David Glass Project: Calling Center GOPY 3890 W. N.W. Hw% Suite 400 Coppell, Texas Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler/BECK CONCRETE CLASS: 9349 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 07/17/1998 BATCH TIME: 1:20 pm PLANT: 16 TIME SAMPLED: 1:45 pm BY: Damon Elrod SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly clouyd, light winds STRENGTH: 4000 psi ~: 28 Days TEMPERATURE (F) - AIR 97 F CONCRETE: 97 r SIoUMP: 5" TRUCK NO: 853 TICKET NO: 729022 .aiR: N/A AIR CO.~TENT (%): N/A CNIT WEIGHT (pcf): N/A TEST M£THOD: ASTM C-143 PLACEMENT LOCATION: ASTM C-172 See page 1 ASTM C-39 SAMPLE LOCATION: Panels MP-2 and MP-3 REPORT OF TESTS ACCUMULATIVE YARDS: 120 CYLINDER MEASURED .M.4~XIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 7.00* 07/24/1998 7 94800 3350 2 2 7.00' 07/24/1998 7 96010 3400 Average 3380 2 3 7.00' 08/14/1998 28 120850 4270 2 4 7.00* 08/14/1998 28 125210 4430 Average 4350 *Does not neet project specifications. Technician: Damon Elrod Started: 10:00 Finished: 3:00 pm ~ Engineering, Inc. Report Distribution: (1) Prentiss Properties Limited. Inc. (I) I lalffAssoc~ates, Inc. (1) Butler Construction (I) City of CoppeH Eugene narbour (1) Alliance Architects, Inc. (1) Evert:Butler Const. Vice President (1) Brockette Davis Drake. Inc. (1) HBC Engineering; Mr. Eugene l larbour This report is exclusively for the use of the client indicated abox e and shall not be reproduced except in full without the written approval of I {BC Engineering, Inc. 01SS Page 2 of 2