Loading...
Northlake 635(7)-LR 980812CONCRETE COMPRI. 31VE STRENGTH TES ENGINEERING, LNC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/30/I 998 Report No.: 9820032 Report Date 08/12/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center COPY Attn: David Glass Coppell, Texas 3890 W. N.W. Hx~3~, Suite 400 Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler/BECK CONCRETE CLASS: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 07/30/1998 BATCH TLXIE: 10:20 am PLANT: 16 TIME SAMPLED: 10:45 am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: clear STRENGTll: 3500 psi (~ 28 Days TEMPERATURE (F)-AIR 91 F CONCRETE: 90 F SLUMP: 5" TRUCKNO: 551 TlCKETNO: 732795 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcl): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Sidewalks on east side of building, approximately D-10/G-10 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Sidewalk next to Bldg at D-10 REPORT OF TESTS ACCUMt'I. ATIVEYAm)S: 20 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.00 08/06/1998 7 94820 3350 1 2 5.00 08/06/1998 7 97210 3440 Average 3400 1 3 5.00 08/27/1998 28 1 4 5.00 08,'27/1998 28 Technician: Greg Dimock Started: 9:30 am Finished: 11:30 ~ Engineering, Inc. Report Distribution: (1) Prentiss Properties Limited, Inc. ( 1 ) I lalff Associa:es, Inc. ( 1 ) Butler Construction ( 1 ) Git5- of Coppell Eugene Harbour (1) Alliance Architects, Inc. (1) EverffButler Const. Vice President (1) Brockette Davis Drake. Inc. (I) I IBC Engineering; Mr. Eugene I larbour This report is exclusively for tP.e use of the client indicated above and shall not be reproduced except in tull without the written approval of l IBC Engineering, Inc. 01AK Page I of I