Northlake 635(7)-LR 980804 ENGLNEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 07/24,"1998 Report No.: 9819034 Report Date
08/04/1998
Client No.: 71765000 Project No.: 43-2479-97
Client:Attn:Prentiss Properties Limited, lnC.David Glass Project: Calling Centercoppell, Texas COPY
3890 W. N.W. H~W, Suite 400
Dallas TX 75220
Services: Obtain samples of fresh concrete at the placement locations, perlbrm required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Butler/BECK CONCRETE CLASS: 9339
CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT OATE: 07/24/1998 BATCH TIME: 9:35 am
PLANT: 16 Xl~'tE S.~,XIPLEO: 10:00 am BY: B.J. Clark
SPECIFICATION REQUIREMENTS WEATHERCONmTIO.~S: Clear
STRENGTH: 3000psi ~ 28 Days TEMPERATURE ff)- AIR 91 V CONCRETE: 92 V
SLt'MP: 3" Tm.'CKNO: N/A TICKETNO: 729095
AIR: N/A AIR CONTENT {%): N/A [:NIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
South turn lane on Belt Line Rd.
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 30' N of start of turn
REPORT OF TESTS ACCUML'LATIVE YARDS: 10
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTtl FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 4.00 07/31/1998 7 130710 4620
1 2 4.00 07/31/1998 7 128740 4550
Average 4590
1 3 4.00 08/21/1998 28
1 4 4.00 08/21/1998 28
Technician: B.J. Clark Started: 8:30 am Finished: 3:30 pm ~
Engineering,
Inc.
Report Distribution:
(1) Premiss Properties Limited, Inc. (1) Hal ff Associates, Inc.
(1) Butler Construction (1) City of Coppcll Eugene Harbour
(1) Alliance Architects, Inc. (1) Evert:Butler Const. Vice President
(1) Brockette Davis Drake, Inc. (1) I iBC Engineering; Mr. Eugene l larbour
This report is exclusively for the use of the client indicated above and shall not be reproduced except in lull without the ,a~-itten approval of HBC Engineering, Inc.
01AK Page 1 of 1