Loading...
Northlake 635(7)-LR 980804 ENGLNEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/24,"1998 Report No.: 9819034 Report Date 08/04/1998 Client No.: 71765000 Project No.: 43-2479-97 Client:Attn:Prentiss Properties Limited, lnC.David Glass Project: Calling Centercoppell, Texas COPY 3890 W. N.W. H~W, Suite 400 Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perlbrm required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler/BECK CONCRETE CLASS: 9339 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT OATE: 07/24/1998 BATCH TIME: 9:35 am PLANT: 16 Xl~'tE S.~,XIPLEO: 10:00 am BY: B.J. Clark SPECIFICATION REQUIREMENTS WEATHERCONmTIO.~S: Clear STRENGTH: 3000psi ~ 28 Days TEMPERATURE ff)- AIR 91 V CONCRETE: 92 V SLt'MP: 3" Tm.'CKNO: N/A TICKETNO: 729095 AIR: N/A AIR CONTENT {%): N/A [:NIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: South turn lane on Belt Line Rd. ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 30' N of start of turn REPORT OF TESTS ACCUML'LATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTtl FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 4.00 07/31/1998 7 130710 4620 1 2 4.00 07/31/1998 7 128740 4550 Average 4590 1 3 4.00 08/21/1998 28 1 4 4.00 08/21/1998 28 Technician: B.J. Clark Started: 8:30 am Finished: 3:30 pm ~ Engineering, Inc. Report Distribution: (1) Premiss Properties Limited, Inc. (1) Hal ff Associates, Inc. (1) Butler Construction (1) City of Coppcll Eugene Harbour (1) Alliance Architects, Inc. (1) Evert:Butler Const. Vice President (1) Brockette Davis Drake, Inc. (1) I iBC Engineering; Mr. Eugene l larbour This report is exclusively for the use of the client indicated above and shall not be reproduced except in lull without the ,a~-itten approval of HBC Engineering, Inc. 01AK Page 1 of 1