Loading...
North Texas Mail-CS 871116 COPPELL PUBLIC WORKS ].6, ].987 '1'O: Sleeve Goram, Director of Public Wor]cs FROM: Per Birdsall, Street Foreman NE: Bethel Rd. U.S. Postal Facility/Royal Ln. Project We are already experiencing rapid pavement deterioration on Bethel Rd. west of Royal Lane. This is being directly caused by the construction activities tx}ing ~rform~d on the titled project. Heavy trucks are bringing in materials i.,~ Iha~ project on that segment of Bethel. The condition and type of the road .~. f,,,-~w~ l~o be poor and in knowing this, provisions should have been made (if ~,! i Io repair related deterioration. The Street Dept. does not have the re- so~t~es to deal with this situation. In the ~IEOG Specifications for Public !.'3~l,s Construction "the contractor shall assume all duties o~ed by the owner {o ~m general public in connection with the general public's in~nediate approach to and travel through the work site and the area adjacent to said work site". Attached is the section that this excerpt has been taken from. I h~!~c ~hat this can be resolved without animosity and if you have any questions,