Loading...
Northlake 635(7)-LR 980702 ENG12qEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 06/01/1998 Report No.: 9814044 Report Date 07/02/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center I~,~;g--.~a~ ,~' Attn: David Glass 3890 W. N.W. H~W, Suite 400 Coppell, Texas Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9337 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 06/01/1998 BATCH TreE: 11: 15 am eLANT: 22 TIME SAMPLED: 12:31 pm BY: Brian Otis SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear, hot STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)-AIR 100 F CONCRETE: 100 F SLUMP: 5" TRt'CKNO: 512 TICKETNO: 703761 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Piers ASTM C- 172 ASTM C-39 SAMPLE I.OCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLIN'DER MEASURED MAXIMUM COMPRESSIVE MARKED SI.UMP DATE AGE I.OAD STRENGTH FRACTURE SET NO. (inches) TESTED (da) s) (lbs. force) (psi) TYPE 1 1 6.25 06/08/1998 7 84350 2980 1 2 6.25 06.."08/1998 7 77570 2740 Average 2860 1 3 6.25 06.."29/1998 28 109250 3860 1 4 6.25 06/29/1998 28 105280 3720 Average 3790 Sample location: .'~f~.-5.3, 10.1-C.9, L3.i-B.2, 23.!-2-.4 Note: Contractor notified of high soncre.-_e nemperagure. Samples caken from :tuck. Technician ~ime on repor~ 9~24043. Technician: Brian Otis Started: Finished: ~ Engineering, Inc. Report Distribution: (1) Prentiss Properties Limited, Inc. (1) l lalffAssocmtcs, Inc. (1) Butler Construction (I) City of Coppcll Eugene Harbour (1) Alliance Architects, Inc. (1) Evert. Butlcr Const. Vice President (1) Brockette Davis Drake, Inc. (1) HBC Engineering; Mr. Eugene 1 larbour This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01AK Page I of I