Loading...
Northlake 635(7)-LR 980701 COPY ENCLN'EEP, ING, INC. 8901 C~,~'ee. nter Freew ay. Su!te i 0~ Dalla_~. Texm~ 7~247 Project; Calling Center Report No.: 9817026 Coppell, Texas Date of Service: 07/01/98 Project No.: 43-2479-97 Technician: B. Otis Page: 1 Of 1 Pier Identification A-3 A-4 B-1 B-2 #9 #1 #2 #3 ~M Pier Diameter (in.) 24 24 30 30 24 24 24 24 24 Bell Diameter (in.) 48 48 72 72 54 54 54 54 54 Top of Pier Elevation (ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A Req. Depth From Exist. Grade (ft) 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 Initial Depth of Pier From Existing Grade (ft) 11.2 11.7 11.9 10.8 12.9 14.2 14.0 12.2 13.0 Final Depth of Pier From Existing Grade (ft) 11.4 11.8 12.0 11.0 13.0 14.6 14.2 12.3 13.4 Depth From Top of Concrete (ft) 9.7 9.6 10.3 9.0 11.0 12.6 12.6 11.0 12.2 Condition of Bottom (wet or dry) Dry Dry D~.. Dry .........Dry ............ Dry D~ ..... .D_~. . _D~ .............. Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in) N/A N/A N/A N/A N/A N/A N/A N/A N/A } Cased Depth (ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A Number of Vertical Bars (ea.) 6 6 10 10 6 6 6 6 6 Reinforcing Bar Size (#) 6 6 8 8 6 6 6 6 6 Length of Vertical Bars (ft.) 10.1 10.3 10.9 9.6 10.4 12.0 12.0 10.4 11.6 Time Drilling Was Completed 8:30 am 9:30 am 10:50 am 10:33 am 1:32 pm 1:40 pm 1:49 pm 1:59 pm 2:15 pm Time Concrete Was Placed 12:10 pm 12:19 pm 12:27 pm 12:34 pm 2:30 pm 2:36 pm 2:47 pm 2:56 pm 3:07 pm