Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Northlake 635(7)-LR 980630
COPY ENC,]]qF_~R[NG. D,-C. $9'.2.1 Ce.q~en:¢r F:eewa'.,-. Suite I.'.'~!~ Dalla~. Texas Project: Calling Center Report No.: 9816947 Coppell, Texas Date of Service: 06/30/98 Project No.: 43-2479-97 Technician: B. Otis Page: 1 of 1 Pier Identification A-1 A-2 #6 #8 Pier Diameter (in.) 24 24 24 24 Bell Diameter (in.) 48 48 48 48 Top of Pier Elevation (ft) N/A N/A N/A N/A Req. Depth From Exist. Grade (ft) 10.0 10.0 12.0 12.0 Initial Depth of Pier From Existing Grade (ft) 11.5 11.9 12.0 12.5 Final Depth of Pier Fr~-n~ Existing '-- Grade (fi) 11.9 12.0 12.3 12.7 Depth From Top of Concrete (ft) 11.0 10.6 10.8 10.7 Condition of Bottom (wet or dry) Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Casing Diameter (in) N/A N/A N/A N/A Cased Depth (ft) N/A N/A N/A N/A Number of Vertical Bars (ea.) 6 6 6 6 Reinforcing Bar Size (#) 6 6 6 6 Length of Vertical Bars (fi.) 11.9 11.2 10.3 10.0 Time Drilling Was Completed 1:15 pm 9:30 am 2:29 pm 12:00 pm Time Concrete Was Placed 3:10 pm 3:22 pm 3:34 pm 3:47 pm