Loading...
Northlake 635(7)-LR 980619 ENGLNEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/20./1998 Report No.: 9812956 Report Date 06/19/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center COPY Attn: David Glass Coppell, Iexas 3890 W. N.W. Hx~.~, Suite 400 Dallas TX 75220 Services: Submitted Cylinders. All information other than that related to compressive strength is submitted and assumed to be correct. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 9351 CONCRETE SUPPI_IER: Pioneer Concrete PLACEMENT DATE: 05/20/1998 BATCH TIME: 9:20 am PLANT: 16 TI.X~E SA.XlPLED: 9:45 am BY: Eddie Elrod SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 4000 psi r~ 28 Days TEMPERATURE (F)-.AIR 79 F CONCRETE: 80 F SLUMP: 5" TRUCK NO: 1 105 TICKET NO: 712329 AIR: 3-6% AIR CONTENT (%): N/A [:NIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Paving. northeast comer parking lot ASTM C-172 ASTM C-39 SAMPLE LOCAIION: 80'S."NE comer, 30'W..'E curb REPORT OF TESTS ACCUMULATIVE YARDS: 90 CYLINDER MEASURED MAXIMUM CO_MPRESSlVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 5.75 05/27/1998 7 99590 3520 1 2 5.75 05/27/1998 7 101490 3590 Average 3560 1 3 5.75 06/17..:1998 28 120830 4270 1 4 5.75 06;17/1998 28 121990 4310 Average 4290 NOTE: Reoc. rt revised to show correz: con~raczcr as -~ECK. This report is exclusively for the use of the client indicated aboxe and shall not be reproduced except in full without the X~-Titten approval of HBC Engineering, Inc. 01AK Page I of 4 CONCRETE COMPR[oMVE STRENGTH TES_ ENGLNEERING, LNC. 8901 Carpenter Fr~3'., Suite #100 Dallas, Texas 75247 Date of Service: 05/20/1998 Report No.: 9812956 Report Date 06/19/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, lnc. Project: Calling Center COPY Attn: David Glass Coppell, Texas 3890 W. N.W. Hw% Suite 400 Dallas TX 75220 Services: Submitted Cylinders. All information other than that related to compressive strength is submitted and assumed to be correct. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 9351 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 05/20/1998 BATCH TIME: 10:45 am PLANT: 16 TIME SAMPLED: 11: 10 am BY: Eddie Elrod SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 4000 psi .~ 28 Days TEMPERATURE (F)-.AIR 84 F CONCRETE: 83 F SLUMP: 5" TRUCK NO: 1884 TICKET NO: 712338 .AIR: 3-6% AIR CONTENT (%): N/A t.'NIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 80'S.'.'N curb, 60'W/E curb REPORT OF TESTS ACCUMULATIVE YARDS: 170 CYI.INDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inehes) TESTED (days) (lbs. foree) (psi) TYPE 2 1 5.50 05/27/1998 7 98100 3470 2 2 5.50 05/27/1998 7 92730 3280 Average 3380 2 3 5.50 06/17/1998 28 117710 4160 2 4 5.50 06/17/1998 28 117480 4150 Average 4160 NOTE: Repor~ revised ~o skc;.~ correz~ conr_ractcr as BECK. This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01AK Page 2 of 4 CONCRETE COMPRIi' ..olVE STRENGTH ENGLNEERLNG, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05,:20..'1998 Report No.: 9812956 Report Date 06/19/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, InC.Atm: David Glass Project: Calling Centercoppell, Texas COPY 3890 W. N.W. Hv~3,, Suite 400 Dallas TX 75220 Services: Submitted Cylinders. All information other than that related to compressive strength is submitted and assumed to be correct. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 9351 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 05/20/1998 BATCH TIME: 11:50 am PLANT: 16 TIME SAMPLED: 12:20 pm BY: Eddie Elrod SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)-AIR 87 F CONCRETE: 90 F SLU.X-IP: 5" TRUCK NO: 1842 TICKET NO: 712344 AIR: 3-6% AIR CONTENT (%): N~A UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page i ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 110'W..'E curb, 40'N/bldg. front REPORT OF TESTS ACCC.X-n:LAT~VE YAm)S: 230 CYLINDER .MEASURED .~IAXL~IU.X-I COMPRESSIVE MARKED SI,UMP DATE AGE I.OAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 5.50 05/27/1998 7 103750 3670 3 2 5.50 05/27/1998 7 96680 3420 Average 3550 3 3 5.50 06./17/1998 28 120110 4250 3 4 5.50 06./17/1998 28 118620 4190 Average 4220 NOTE: Repc. r~ revised ~c show cc. rrec~ con~ractcr as BETK. This report is exclusively for the use of the client indicated abox e and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01AK Page 3 of 4 CONCRETE COMPRL olVE STRENGTH TES_ F_NGhNEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/20/1998 Report No.: 9812956 Report Date 06/19/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center GOPY Ann: David Glass Coppell, Texas 3890 W. NY, V. Hwy, Suite 400 Dallas TX 75220 Services: Submitted Cylinders. All information other than that related to compressive strength is submitted and assumed to be correct. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 9351 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 05/20/1998 BATCH TIME: 1:12 pm PI.ANT: 16 TIME SAMPLED: 1:25 pm BY: Eddie Elrod SPECIFICATION' REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)-AIR 93 V CONCRETE: 88 r SLUMP: 5" TRUCKN'O: 408 TICKETN'O: 712351 AIR: 3-6% AIR CONTENT (%): N/A UNIT WEIGHT (pcO: N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Firclane, I 10'W:'E curb, 15'S/N curb REPORT OF TESTS .-XCCUMULATlVE YARDS: 300 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE I.OAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 5.75 05/27/1998 7 99510 3520 4 2 5.75 05/27/1998 7 104880 3710 Average 3620 4 3 5.75 06; 17/1998 28 127750 4520 4 4 5.75 06/17/1998 28 130110 4600 Average 4560 NOTE: ReForr revised ~o skc;-: correct conr_ractcr as BECK. Technician: Eddie Elrod Started: 7:00 am Finished: 4:30 pm ~ Engineering, Inc. Report Distribution: (l) Prentiss Properties Limited, Inc. (I) Halff Assocmtes, Inc. (1) Butler Construction (1) City of Coppell Eugene Harbour (I) Alliance Architects, Inc. / I ) EverffButler Const. Vice President (I) Brockette Davis Drake. Inc. (1) HBC Engineering; Mr. Eugene Harbour This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01AK Page 4 of 4