Northlake 635(7)-LR 980612REPORT OF DRILLEk BELLED PIER INSPEC .'ION ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/29/1998 Report No.: 9813865 Report Date 06/12/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center COp~r Attn: David Glass Coppell, Texas 3890 W. N.W. Hx~.T, Suite 400 Dallas TX 75220 Services: Drilled Eelled Pier ir. spec%lot. On this date, an HBC Engineering ~ecknician arrived a5 the above referenced jobsi5e as sckeduled fcr drilled belled pier inspection. See attached skeets fcr recorded daza. NOTE: Consrete was held down 4 focn from exisuing grade unzil contractor ccu!d verify top cf pier elevation. Remainder Ec be concreued at a later daze. Technician /ime: 12:3Cpm zo 5:3Cpm Technician: Brian Otis ~ Engineering, Inc. Report Distribution: (1) Prentiss Properties Limited, Inc. (1) HalffAssociates, Inc. (1) Butler Construction (1) City of CoppcH Paul D. Smith, P.E. (l) Alliance Architects, Inc. ( 1 ) l ICBeck Contractors Senior Project Engineer (1) Brockette Dax is Drake, Inc. ( 1 ) Cit? of Coppell This report is exclusively for the use of the client indicated abo~e and shall not be rcproduced except in full without the written approval of HBC Engineering, Inc. 99TMP Page I of 1 COPY ENGINEERING, INC. Project: Calling Center Repo~ No.: 9813865 Coppell. Texas Date of Se~ice: 05.'29-98 Project No.: 43-247%97 Technician: B. Otis Page: 1 of 1 Pier Identification D.1 D.1L5 G.6/.5 C~6 C.2 C.2/.5 B.8 B.8/.5 ~'5.6 J.9/5.6 Pier Diameter (in.) 24 24 24 24 24 24 24 24 24 24 Bell Diameter (in.) 48.0 48.0 48.0 48.0 48.0 48.0 48.0 48.0 48.0 48.0 Top of Pier Elevation (fi) 94.0 94.0 94.0 94.0 94.0 94.0 94.0 94.0 94.0 94.0 Req. Depth From Exist. Grade (fi) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Initial Depth of Pier From Existing Grade (fi) 15.9 15.9 15.8 15.2 15.5 15.2 15.4 15.5 15.8 14.0 Final Depth of Pier From Existing Grade (fi) 16.0 16.0 16.0 15.4 15.5 15.4 15.4 15.6 17.0 14.2 Depth From Top of Concrete (fi) 12.0 12.0 12.0 11.4 11.4 11.4 11.4 11.6 13.0 10.2 Condition of Bottom (wet or dry) DRY DRY DRY DRY DRY DRY DRY DRY DRY DRY Plumb Within Tolerance (yes or no) YES YES YES YES YES YES YES YES YES YES Casing Diameter (in) N/A N/A N/A N]A N/A N/A Cased Depth (fi) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Number of Ve~ical Bars (ea.) 6 6 6 6 6 6 6 6 6 6 Reinforcing Bar Size (~) 6 6 6 6 6 6 6 6 6 6 Length of Ve~ical Bars (ff.) 14.6 14.6 14.6 14.0 14.0 14.0 14.0 14.0 15.6 12.6 Time Drilling Was Completed 08:45AM 09:25AM 09:40 AM 09:50 AM 10:30 AM 10:45AM 12:05 PM 12:20 PM 01:00 PM 01:25 PM Time Concrete Was Placed 03:05 PM 03:15 PM 03:23 PM 03:30 PM 03:45 PM 03:53 PM 04:05 PM 04:10 PM 04:20 PM 04:25 PM ENGI~aERING, IN~. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 06/01/1998 Report No.: 9814043 Report Date 06/12/1998 Client No..: 71765000 Project No.: 43-2479-97 Client: erentiss Properties Limited, Inc. Project: Calling Center COPY Atto: David Glass Coppell, Texas 3890 W. NY3/. Hwg,, Suite 400 Dallas TX 75220 Services: Drilled Belled Pier !nspecmicn On this date, an HBC Engineering uechnician arri,:ed au the above referenced jobsite as scheduled for drilled belled pier inspection. See atEached sheets for recorded da5a. Technician Time: 6:0Cam to 2:3'3pm Technician: Brian Otis ~ Engineering, Inc. Report Distribution: (I) Prentiss Properties Limited, Inc. (I) I lalff Associates, Inc. (1) Butler Construction (I) City of Coppell Paul D. Smith, P.E. (1) Alliance Architects, Inc. (1) HCBeck Contractors Senior Project Engineer (1) Brochette Davis Drake, Inc. (1) City of Coppei'. This report is exclusively lbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 99TMP Page ! of I COPY ENGINEERING, INC. ~.,~-~'l Ca;'pelller I-'1~-~, . ~,l!te ~1:~;~ Dallas. Tcxa~ Project: Calling Center Report No.: 9814043 Coppell, Texas Date of Service: 06/01/98 Project No.: 43-2479-98 Technician: B. Otis Page: ] ofl Pier Identification AA/5.3 C.9/10.1 D.2/10.1 D.4/10.1 D.6/10.1 E.4/10.1 E.5/10.1 I Pier Diameter (in.) 24 24 24 24 24 24 24 Bell Diameter (in.) 48.0 54.0 54.0 54.0 54.0 54.0 54.0 Top of Pier Elevation (ft) 94.0 97.0 97.0 97.0 97.0 97.0 97.0 Req. Depth From Exist. Grade (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Initial Depth of Pier From Existing Grade (ft) 13.0 13.0 13.0 13.0 13.0 13.0 13.0 Final Depth of Pier From Existing ............... Grade (ft) 13.0 13.2 13.5 13.0 13.5 13.3 13.0 Depth From Top of Concrete (ft) 10.0 11.2 11.5 11.0 11.5 11.3 11.0 Condition of Bottom (wet or dry) DRY DRY DRY DRY DRY DRY DRY Plumb Within Tolerance (yes or no) YES YES YES YES YES YES YES Casing Diameter (in) N/A N/A N/A N/A N/A N/A N/A .... C_a_sed_.Depth (ft) ............... N/A N/A N/A N!A N/A N/A N/A __ Number of Vertical Bars (ea.) 6 6 6 6 6 6 6 Reinforcing Bar Size (#) 6 6 6 6 6 8 6 Length of Vertical Bars (ft.) 10.5 11.0 12.2 11.9 13.0 12.2 12.4 Time Drilling Was Completed 08:45 AM 08:52 AM 09:02 AM 09:10 AM 09:19 AM 10:37 AM 10:50 AM Time Concrete Was Placed 12:30 PM 01:09 PM 01:14 PM 01:19 PM 01:30 PM 01:38 PM 02:10 PM CONCRETE COMPRESSIVE STRENGTH TES_ ENGINEERD~. INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 05/11/1998 Report No.: 9812050 06/12/1998 Client :.No.: 71765000 Project No.: 43-247%97 Client: Prentiss Properties Limited, Inc. Project: Calling Center CoPy Attn: David Glass Coppell, Texas 3890 W. N.W. Hwy, Suite 400 Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9337 CONCRETE SUPPLIER: Pioneer Concrete PLAC'EMENT DATE: 05/11/1998 BATCH TIME: I 1:00 am PLANT: 22 TIME SAMPLED: 11:30 am BY: Terry. L. Smith SPECIFICATION REQI_'IREMENTS WEATItER CONOITIONS: Sunny STRENGTH: 3000 psi ~ 28 Days TEMPERATURE (F)- AIR 88 F CONCRETE: 91 F SLUMP: 4" TRUCKNO: 1824 TICKETNO: 708808 Am: N/A .AIR CONTENT (%): N/A UNIT WEIGHT (pet): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Piers ASTM C- 172 ASTM C-39 SAMPLE LOCATION: I:P & 2/P REPORT OF TESTS ACCt.:,~n.'LATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.50 05/18/1998 ~' 98630 3490 1 2 5.50 05/18/1998 7 94930 3360 Average 3430 I 3 5.50 06.-."'08/1998 28 146100 5170 1 4 5.50 06.."08/1998 28 149180 5280 Average 5230 Techr. iciar, tirte -on pier report. Technician: Terry L. Smith Started: Finished: ~ Engineering, Inc. Report Distribution: ( 1 ) Prentiss Properties Limited, [nc. ( 1 ) Hal ft' Associates, Inc. (I) Butler Construction ( I ) City of Coppeil Eugene narbour (1) Alliance Architects, Inc. ( I ) Evert:'Butler Const. Vice President {,1) Brockettc Davis Drake, Inc. (1) HBC Engineering; Mr. Eugene I Iarbour -[-his report is exclusively for the use of the client indicated abo',e and shall not be reproduced except m l~ll without the written approval of }IBC Engineering, Inc. 01AK Page I of 1 CONCRETE COMPRE 3IVE STRENGTH TESA ENG~EERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75147 Report Date Date of Service: 05/12/1998 Report No.: 9812156 06/12/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, lnc. Project: Calling Center COPY AtT: David Glass Coppell, Texas 3890 W. N.W. HxW, Suite 400 Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTILatCTOR: Butler Construction CONCRETE CLASS: 9351 CONCREIE SUPPLIER: Pioneer Concrete PLACEMENT DALE: 05/12/1998 BAICH lIME: 5:25 am eLANT: 16 TIME SAMPLED: 6:12 am BY: Jack Fan'is SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 4000 psi ~Sw. 28 Days TEMPERATURE (F)-AIR 60 F CONCRETE: 80 F SLUMP: 5" TRUCK NO: 860 TICKET NO: 712055 .SIR: 3-6% .SIR CONTENT (%): 3.4 C.~lr WEIGHT (pet): N/A TEST .METHOD: ASTM C-143 PLACEMENT LOCATION: Paving, parking on northwest side of building; see attached diagram ASTM C-172 ASTM C-39 SAMPLE LOCATION: From SE corner 5'N/YW REPORT OF TESTS ACCU.MULATIVE YARDS: 40 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.50 05,,"19/1998 7 91220 3230 1 2 5.50 05/19/1998 7 98150 3470 Average 3350 1 3 5.50 06i09/1998 28 129080 4560 I 4 5.50 06.,.-"09/1998 28 133770 4730 Average 4650 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01AK Page I of 6 ENGLNEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/12/1998 Report No.: 9812156 Report Date 06/12/1998 Client No.: 71765000 Project No.: 43-2479-97 Client:Atm:Prentiss Properties Limited, InC.David Glass Project: Coppell,Calling CenterTexas COPY 3890 W. N.W. Hw% Suite 400 Dallas TX 75220 Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9351 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 05./12/1998 BATCH TIME: 7:20 am PLANT: 16 TIME SAMPLED: 8:25 am BY: Jack Farris SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)-.AIR 65 F CONCRETE: 80 F SLUMP: 5" TRUCK NO: 1854 TICKET NO: 712067 .',IR: 3-6% ,AIR CONTENT (%): 4.2 UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page l ASTM C- 172 ASTM C-39 SAMPLE LOCATION: From NE comer 15'W/5'S REPORT OF TESTS ACCUMUL&TIVE YARDS: 160 CYIANDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 5.00 05/19/1998 7 91830 3250 2 2 5.00 05/19/1998 7 95070 3360 Average 3310 2 3 5.00 06..."09/1998 28 140300 4960 2 4 5.00 06/09/1998 28 141860 5020 Average 4990 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01AK Page 2 of 6 CONCRETE COMPRE 31VE STRENGTH TES- F~NGLNEERING, ExIC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/12/1998 Report No.: 9812156 Report Date 06/12/1998 Client :No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center CO~n~' Attn: David Glass Coppell, Texas 3890 W. N.W. Hwy, Suite 400 Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9351 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 05/12/1998 BATCH TIME: 8'15 am PLANT: 16 TIME SAMPLED: 9:25 am BY: Jack Farris SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 70 E CONCRETE: 84 F SLUMP: 5" TRL'CK NO: 860 TICKET NO: 712075 AIR: 3-6% AIR CONTENT (%): 3.4 rNIT WEIGHT (per): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: From SE comer 24 yds. W & 3'N REPORT OF TESTS ACCUMULATIVE YARDS: 240 CYLINDER MEASURED .M.&.XIMUM CO.MPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 5.25 05/19/1998 7 100400 3550 3 2 5.25 05.."19/1998 7 102420 3620 Average 3590 3 3 5.25 06/09/1998 28 122350 4330 3 4 5.25 06/09/1998 28 120370 4260 Average 4300 This report is exclusively for the use of the client indicated above and shall not be reproduced except in fifll without the written approval of HBC Engineering, Inc. 01AK Page 3 of 6 CONCRETE COMPR ._MVE STRENGTH TES ENGhNEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/12..'1998 Report No.: 9812156 Report Date 06/12/1998 Client No.: 71765000 Project No.: 43-2479-97 Client:Attn:Prentiss Properties Limited, InC.David Glass Project: Calling Center COPY 3890 W. N.W. Hw~, Suite 400 Coppell, Texas Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9351 CONCRETE St'PPL~ER: Pioneer Concrete PLACEMENT DATE: 05/12/1998 BATCH TI.XtE: 10:10 am PLANT: 16 TIME SAMPLED: 10:58 am BY: Jack Farris SPECIFICATION REQI_'IREMENTS WEATHER CONDITIONS: Sunny, windy STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)- AIR 69 F CONCRETE: 80 F SLUMP: 5" TRUCKNO: 858 TICKETNO: 712086 AIR: 3-6% AIR CONTENT (%): 4.0 UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: From SW corner 12'E & 12 yds. N REPORT OF TESTS ACCI..IMULATIVE YARDS: 330 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 I 5.50 05/19/1998 7 88580 3130 4 2 5.50 05/19/1998 7 92560 3270 Average 3200 4 3 5.50 06/09/1998 28 107090 3790 4 4 5.50 06/09/1998 28 109580 3880 Average 3840 '/his report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of I IBC Engineering, Inc. 01AK Page 4 of 6 CONCRETE COMPRE_SIVE STRENGTH TES_ ENGLNEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 05/12/1998 Report No.: 9812156 06/12/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center coPY Atto: David Glass Coppell, Texas 3890 W. N.W. Hx~?, Suite 400 Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9351 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENTDATE: 05/12/1998 BATCHTIS1E: 11:18 am PLANT: 16 Tree S.4.MPLED: 12:05 pm BY: Jack Farris SPECIFICATION REQUIRESIENTS WEATHER CO,NDITIONS: Sunny STRENGTH: 4000 psi ..~ 28 Days TEMPERATURE {F)-AIR 70 F CONCRETE: 84 F SLUMP: 5" TRUCKNO: 858 TIC,CrT,TO: 712094 AiR: 3-6% Am CONTENT (%): 3.4 UNIT WRIGHT (OEO: N/A TEST 51£TaOD: ASTM C-143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: From NW corner 8'E/10'S REPORT OF TESTS ACCU.MULATIVE YARDS: 410 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE I.OAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 1 5.75 05/19/1998 7 87690 3100 5 2 5.75 05/19/1998 7 85830 3040 Average 3070 5 3 5.75 06:09/1998 28 145850 5160 5 4 5.75 06/09/1998 28 139170 4920 Average 5040 This repo,'t is exclusively for the use of the client indicated above and shall not be reproduced except in IL!I without the written approval of HBC Engineering, Inc. 01AK Page 5 of 6 CONCRETE COMPR1L_SIVE STRENGTH TES ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/12/1998 Report No.: 9812156 Report Date 06/12/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, lnc. Project: Calling Center COpy Att'n: David Glass Coppell, Texas 3890 W. N.W. Hwy, Suite 400 Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9351 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 05/12/1998 BATCH TIME: 1:35 pm PLANT: 16 TI.ME SAMPLED: 2:50 pm BY: Jack Farris SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, hot STRENGTH: 4000 psi @: 28 Days TEMPERATURE (F)- AIR 85 F CONCRETE: 90 E SLUMP: 5' TRUCK NO: 1854 TICKET NO: 712105 AIR: 3-6% AIR CONTENT (%): 4.2 UNIT WEIGHT (pcf): N/A TEST .METHOD: ASTM C- 143 PLACEMENT I.OCATION: See page l ASTM C- 172 ASTM C-39 SAMPLE LOCATION: From NE corner 6'S;4'W REPORT OF TESTS ACCUMULATIVE YARDS: 510 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SI. UMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 6 1 5.00 05/19/1998 7 91240 3230 6 2 5.00 05/19/1998 7 94080 3330 Average 3280 6 3 5.00 06/09/1998 28 125290 4430 6 4 5.00 06/09/1998 28 129250 4570 Average 4500 Technician: Jack Farris Started: 4:30 am Finished: 2:30 pm ~ Engineering, Inc. Report Distribution: (1) Prentiss Properties Limited, Inc. (1) Hal ff Associates, Inc. (1) Butler Construction ( 1 ) City of Coppell Eugene Harbour (1) Alliance Architects, Inc. (1) Evert-'Butler Const. Vice President (1) Brockette Davis Drake, Inc. (1) HBC Engineering; Mr. Eugene Harbour This report is exclusively for the use of the client indicated above and shall not be reproduced except in tull without the written approval of I IBC Engineering, Inc. 01AK Page 6 of 6