Loading...
Northlake 635(7)-LR 980608REPORT OF DRILLEkAELLED PIER INSPEC ION E_NGLNEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/11/1998 Report No.: 9812248 Report Date 06/08/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center Atto: David Glass Coppell, Texas COPY 3890 W. N.W. H;W, Suite 400 Dallas TX 75220 Services: Drilled belled pier inspeczicn. On rkis daze, an HEC EnTineering, 5nc. represen2ative arrive~ at zhe above referenced jobsite as scheduled for ~:~-~x bell=~ ~:=~ insDecEion. See aztacke~ sheet for recorded ~ata. Technician Iime: See Recort ~9812359 Technician: Terry L. Smith ~ Engineering, Inc. Report Distribution: (1) Prentiss Properties Limited, lac. (1) Halff Associates. Inc. (1) Butler Construction (1) City of Coppell Paul D. Smith, P.E. (1) Alliance Architects, Inc. (1) HCBeck Contractors Senior Project Engineer (1) Brockette Davis Drake, Inc. ( 1 ) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 99SS Page I of I ENGINEERING, INC. 8901 Carpenter Frwy.. Suite #100 Dallas, Texas 75247 Report Date Date of Service: 05.."07..-'1998 Report No.: 9811769 06.-'08:-' 1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited. Inc. Project: Callimz~ Center ' ~-~ ~2 ~"'::7 ;~':':'~:' ..- ,' · '~... ,v't~' Attn: David Glass Coppell. Texas '""~ "~'~'."';'" ;-.~ " 3890 W. N.W. Hwy. Suite 400 ' Dallas TX 75220 Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast compressive strcngth samples. PROJECT DATA CONTRACTOR: Butler Construction CON(RETE ('LASS: 9351 CONCRETE SI'PPI.IER: Pioneer Concrete PI.A('EMENT DATE: 05.'07.-'1998 BATC[t TIME: 5:50 alTl PI,ANT: 16 TIME S.AMPI,EI): 6:20 am aY: Marlo \-:illanueva SPECIFIC:VI'ION REQI'IREMENTS V~ EATllEI~, CO.XDrrlONS: Clear STRENGTH: 4000 psi ."'~_/~ 28 Days TEMPERATI'RE(F)-AIR 62 E ('ONCRETE: 65 F S'..t'X~P: 3-5" TRI ('~ TO: 725 TICKET50: 711967 All*,: 3-6°.'o Alit, ('ONTENT (%): 4.3 UNIT WEIGHT (pet): .,~.."h TEST METHOD: .;\$']'.\t C-143 PLA('EMENT LOCATION: P;.'rki::g lot at .norl?, end o:'b'.::ldhlg ASTM C-172 ASTM C-39 SAMPLE I.OC.-\llO"4: 6,)'N"75'\V or'NEC ot'b:clg. REPORT OF TESTS A('('I'.MULATIVE 5'..\1'IDS: 40 CYI.INDER MEASI'RED MAXIMI'M ('OMPRESSIVE MARKEI) SI.I'MP DATE AGE LOAD STRENGTH FR.ACTI.RE SET NO. (inches) lES'I-El) (days) (lbs. force) (psi) TYPE 1 1 5.00 05.."14.-' 1998 ? 101860 3600 1 2 5.00 05.-'14.'"1998 ':' 109970 3890 Average 3750 I 3 5.00 06-04:: 1998 28 126110 4460 i 4 5.00 0604:'1998 28 128690 4550 Average 4510 'I h:s report !.., cxcL:s~xcly for :he ::sc o-:' the cliem ind:.cated a!-ox e and sha[I not bc repm.i:zced except i:: :':fi; xx ithout the xwnten approx al of'I IBC I!ngi::eerh:g. Inc. 01AK Page I of S £N~'F_~, INC. 8901 Carpenter Frw3'.. Suite #100 Dallas, Texas 75247 Report Date Date of Service: 05/07/1998 Report No.: 9811769 06,:08/1998 Client .No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center x~ ~ .~,' ': Attn: David Glass Coppell; Texas 3890 W. N.W. Hwy, Suite 400 Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 935 1 CONCRETE SUPPi. IER: Pioneer Concrete PLACEMENT DATE: 05/07/1998 BATCHTIME: 7:10 am PLANT: 16 TI.XIE SAMPLED: 7:20 am BY: Mario Villanueva SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)- AIR 67 F CONCRETE: 66 F SLUMP: 3-5" TRUCK NO: 725 TICKET NO: 711974 AIR: 3-6% AIR CONTENT (%): 4.7 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: See page I ASTM C- 172 ASTM C-39 SAMPLE I.OCATION: 120'N;150'W of NEC ofbldg. REPORT OF TESTS ACCUMULATIVE YARDS: 1 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 5.25 05/14/1998 7 93170 3290 2 2 5.25 05/14/1998 ~' 100360 3550 Average 3420 2 3 ' 5.25 06,"04/1998 28 120100 4250 2 4 5.25 06/04/1998 28 123290 4360 Average 4310 This reporl is exclusively for the use of the client indicated above and shall not be reproduced except in f~ll without the written approval of 1 IBC Engineering, Inc. 01AK Page 2 of 5 Z-13C CONCRETE COMPRi_. SIVE STRENGTH TES_ ENGINEERIlXiG, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/07/1998 Report No.: 9811769 Report Date 06/08/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center Attn: David Glass Coppell. Texas . ...,.4 3890 W. N.W. Hx~', Suite 400 Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9351 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 05/07/1998 BATCH TIME: 8:51 am PLANT: 16 TLXlE SA~IPLED: 9:10 am BY: Marlo Villanueva SPECIFICATION REQUIREMENTS WEATHERCONDITtONS: Clear STRENGT.: 4000 psi ~ 28 Days TE.~tPERATCRE~E)-AIR 68 F CONCRETE: 66 F SLt:.X~P: 3-5" TRt'C~NO: 759 TIC~ETNO: 711985 AIR: 3-6% AIR CONTENT (%): 4.9 UNIT ~VE1GllT (pcf): N/A TEST METHOD: ASTM C- 143 PI.ACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 75'Ni230'E ofNWC ofbldg. REPORT OF TESTS ACC[.IMULATIVE YARDS: 220 CYLINDER .MEASURED .MAXIMUM COMPRESSIVE MARKED SI.I.'MP DATE AGE LOAD STRENGTH FRACTL'RE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 5.00 05/14/1998 7 88930 3140 3 2 5.00 05/14/1998 7 92440 3270 Average 3210 3 3 5.00 06?04/1998 28 117460 4150 3 4 5.00 06/04/1998 28 113820 4030 Average 4090 This report is exclusively ibr the use of the client indicated aboxc and shall not be reproduced except in frill without the v, titten approval of HBC Engineering, Inc. 01 AK Page 3 of 5 ENGhNEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas. Texas 75247 Date of Service: 05/07/1998 Report No.: 9811769 Report Date 06/08/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: PrentissAttn: DavidPr°pertiesGlass Limited, Inc. Project: Coppell,Calling CenterTexas 3890 W. N.W. Hw,w, Suite 400 Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9351 CONCRETE SL'PPLIER: Pioneer Concrete PLACEMENT DATE: 05/07/1998 BATCH TIME: 10:20 am PLANT: 16 TI.XlE SAMPLED: 10:32 am BY: Mario Villanueva SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)- AIR 70 F CONCRETE: 68 F SLUMP: 3-5" TRUCK NO: 841 TICKET NO: 711997 AIR: 3-6% AIR CONTENT (%): 4.8 t:NIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 95'N:I65'E of NWC of bldg. REPORT OF TESTS ACCUMULATIVE YARDS: 320 CYLINDER MEASURED MAXLMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi} TYPE 4 1 5.00 05/14./1998 7 79360 2810 4 2 5.00 05/14/1998 7 78310 2770 Average 2790 4 3 5.00 06,."'04/1998 28 100530 3560 4 4 5.00 06..'04/1998 28 105000 3710 Average 3640 This report is exclusively for the use of the client indicated abox e and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01AK Page 4 of 5 CONCRETE COMPR 'LSIVE STRENGTH TES . ENGLNEERING, EqC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/07.,.'1998 Report No.: 9811769 Report Date 06./08/1998 Client No.: 71765000 Project No.: 43-2479-97 Client:Attn:PrentissPr°pertiesLimited' InC.David Glass Project: Calling Center COPY 3890 W. N.W. Hwy, Suite 400 Coppell, Texas Dallas TX 75220 Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CL.~,SS: 9351 CONCRETE SUPPLIER: Pioneer Concrete PLACE.XlENT DATE: 05/07/1998 BATCH TreE: 11:40 am PLANT: 16 TI.TIE SA_X~PLED: 11:50 am aY: Mario Villanueva SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 4000 psi 6' 28 Days TEMPERATURE (F)-AIR 82 F CONCRETE: 77 r SLUMP: 3-5" TRUCK NO: 729 TICKET NO: 712008 .SIR: 3-6% AIR CONTENT (%): 4.2 [.INIT WEIGHT (per): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 138'N;80'E of NWC &bldg. REPORT OF TESTS ACCt'.x-nJLAIIVE Y.SRDS: 420 CYI.INDER MEASURED MAXIMI_'M COMPRESSIVE MARKED SLUMP DATE AGE I.OAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 1 5.00 05,'"14/1998 7 83320 2950 5 2 5.00 05/14/1998 7 87920 3110 Average 3030 5 3 5.00 06/04/1998 28 104630 3700 5 4 5.00 06,"04/1998 28 104400 3690 Average 3700 Technician: Mario Villanueva Started: 4:00 am Finished: 12:30 ~'~ Engineering, Inc. Report Distribution: (1) Premiss Properties Limited, Inc. {I) HalffAssoc~ates, Inc. (1) Butler Construction (1) City of Coppell Eugene narbour ( 1 ) Alliance Architects, Inc. (1) Evert.'Butler Const. \.'ice President (1) Brockette Davis Drake, Inc. (1) I IBC Engineering; Mr. Eugene Ha:'bour This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01AK Page 5 ot'5 REPORT OF DRILLE . PIER INSPECTION ENGhN-EERING, LNC. 8901 Car@enter Frwy., Suite #100 Dallas. Texas 75247 Date of Service: 05/11/1998 Report No.: 9812049 Report Date 06/08/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, InC.Atm: David Glass Project: Calling Centercoppell, Texas ~,~' O ~'~q~'~' 3890 W. N.W. Hw.w, Suite 400 Dallas TX 75220 Services: Drilled pier inspec~icn. On this dane, an HBC Engineering representauiTe arrived an nhe above referenced jobsite as scheduled for drilled oier inspecnicn. See annached sheens for recorded daua. NOTE: P stands fcr light pc!e. ?echnician Time: 6:00 am nc 4:00 ur. Technician: Ten3' L. Smith ~ Engineering, Inc. Report Distribution: (l) Prentiss Properties l_imited, Inc. (l) l lalt'f Associates, Inc. (1) Butler Construction (1) City ot'Coppell Paul D. Smith, P.E. ( 1 ) Alliance Architects, Inc. ( 1 ) l ICBeck Con::'actors Senior Project Engineer ( 1 )Brockette Davis Drake, Inc. ( 1 ) City of Coppell This report is exclusively for the use of the client indicated above and shall not be ~'¢produced except in tull without the written approval of IIBC Engineering, Inc. 99SS Page 1 of !