Northlake 635(7)-LR 980608REPORT OF DRILLEkAELLED PIER INSPEC ION
E_NGLNEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 05/11/1998 Report No.: 9812248 Report Date
06/08/1998
Client No.: 71765000 Project No.: 43-2479-97
Client: Prentiss Properties Limited, Inc. Project: Calling Center
Atto: David Glass Coppell, Texas COPY
3890 W. N.W. H;W, Suite 400
Dallas TX 75220
Services: Drilled belled pier inspeczicn.
On rkis daze, an HEC EnTineering, 5nc. represen2ative arrive~ at zhe above
referenced jobsite as scheduled for ~:~-~x bell=~ ~:=~ insDecEion. See aztacke~
sheet for recorded ~ata.
Technician Iime: See Recort ~9812359
Technician: Terry L. Smith ~ Engineering, Inc.
Report Distribution:
(1) Prentiss Properties Limited, lac. (1) Halff Associates. Inc.
(1) Butler Construction (1) City of Coppell Paul D. Smith, P.E.
(1) Alliance Architects, Inc. (1) HCBeck Contractors Senior Project Engineer
(1) Brockette Davis Drake, Inc. ( 1 ) City of Coppell
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
99SS Page I of I
ENGINEERING, INC.
8901 Carpenter Frwy.. Suite #100
Dallas, Texas 75247
Report
Date
Date of Service: 05.."07..-'1998 Report No.: 9811769
06.-'08:-' 1998
Client No.: 71765000 Project No.: 43-2479-97
Client: Prentiss Properties Limited. Inc. Project: Callimz~ Center ' ~-~ ~2 ~"'::7 ;~':':'~:' ..- ,' · '~... ,v't~'
Attn: David Glass Coppell. Texas '""~ "~'~'."';'" ;-.~ "
3890 W. N.W. Hwy. Suite 400 '
Dallas TX 75220
Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast
compressive strcngth samples.
PROJECT DATA
CONTRACTOR: Butler Construction CON(RETE ('LASS: 9351
CONCRETE SI'PPI.IER: Pioneer Concrete PI.A('EMENT DATE: 05.'07.-'1998 BATC[t TIME: 5:50 alTl
PI,ANT: 16 TIME S.AMPI,EI): 6:20 am aY: Marlo \-:illanueva
SPECIFIC:VI'ION REQI'IREMENTS V~ EATllEI~, CO.XDrrlONS: Clear
STRENGTH: 4000 psi ."'~_/~ 28 Days TEMPERATI'RE(F)-AIR 62 E ('ONCRETE: 65 F
S'..t'X~P: 3-5" TRI ('~ TO: 725 TICKET50: 711967
All*,: 3-6°.'o Alit, ('ONTENT (%): 4.3 UNIT WEIGHT (pet): .,~.."h
TEST METHOD: .;\$']'.\t C-143 PLA('EMENT LOCATION:
P;.'rki::g lot at .norl?, end o:'b'.::ldhlg
ASTM C-172
ASTM C-39
SAMPLE I.OC.-\llO"4: 6,)'N"75'\V or'NEC ot'b:clg.
REPORT OF TESTS A('('I'.MULATIVE 5'..\1'IDS: 40
CYI.INDER MEASI'RED MAXIMI'M ('OMPRESSIVE
MARKEI) SI.I'MP DATE AGE LOAD STRENGTH FR.ACTI.RE
SET NO. (inches) lES'I-El) (days) (lbs. force) (psi) TYPE
1 1 5.00 05.."14.-' 1998 ? 101860 3600
1 2 5.00 05.-'14.'"1998 ':' 109970 3890
Average 3750
I 3 5.00 06-04:: 1998 28 126110 4460
i 4 5.00 0604:'1998 28 128690 4550
Average 4510
'I h:s report !.., cxcL:s~xcly for :he ::sc o-:' the cliem ind:.cated a!-ox e and sha[I not bc repm.i:zced except i:: :':fi; xx ithout the xwnten approx al of'I IBC I!ngi::eerh:g. Inc.
01AK Page I of S
£N~'F_~, INC.
8901 Carpenter Frw3'.. Suite #100
Dallas, Texas 75247
Report Date
Date of Service: 05/07/1998 Report No.: 9811769
06,:08/1998
Client .No.: 71765000 Project No.: 43-2479-97
Client: Prentiss Properties Limited, Inc. Project: Calling Center x~ ~ .~,' ':
Attn: David Glass Coppell; Texas
3890 W. N.W. Hwy, Suite 400
Dallas TX 75220
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Butler Construction CONCRETE CLASS: 935 1
CONCRETE SUPPi. IER: Pioneer Concrete PLACEMENT DATE: 05/07/1998 BATCHTIME: 7:10 am
PLANT: 16 TI.XIE SAMPLED: 7:20 am BY: Mario Villanueva
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear
STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)- AIR 67 F CONCRETE: 66 F
SLUMP: 3-5" TRUCK NO: 725 TICKET NO: 711974
AIR: 3-6% AIR CONTENT (%): 4.7 UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C-143 PLACEMENT LOCATION:
See page I
ASTM C- 172
ASTM C-39
SAMPLE I.OCATION: 120'N;150'W of NEC ofbldg.
REPORT OF TESTS ACCUMULATIVE YARDS: 1 10
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
2 I 5.25 05/14/1998 7 93170 3290
2 2 5.25 05/14/1998 ~' 100360 3550
Average 3420
2 3 ' 5.25 06,"04/1998 28 120100 4250
2 4 5.25 06/04/1998 28 123290 4360
Average 4310
This reporl is exclusively for the use of the client indicated above and shall not be reproduced except in f~ll without the written approval of 1 IBC Engineering, Inc.
01AK Page 2 of 5
Z-13C
CONCRETE COMPRi_. SIVE STRENGTH TES_
ENGINEERIlXiG, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 05/07/1998 Report No.: 9811769 Report Date
06/08/1998
Client No.: 71765000 Project No.: 43-2479-97
Client: Prentiss Properties Limited, Inc. Project: Calling Center
Attn: David Glass Coppell. Texas . ...,.4
3890 W. N.W. Hx~', Suite 400
Dallas TX 75220
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Butler Construction CONCRETE CLASS: 9351
CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 05/07/1998 BATCH TIME: 8:51 am
PLANT: 16 TLXlE SA~IPLED: 9:10 am BY: Marlo Villanueva
SPECIFICATION REQUIREMENTS WEATHERCONDITtONS: Clear
STRENGT.: 4000 psi ~ 28 Days TE.~tPERATCRE~E)-AIR 68 F CONCRETE: 66 F
SLt:.X~P: 3-5" TRt'C~NO: 759 TIC~ETNO: 711985
AIR: 3-6% AIR CONTENT (%): 4.9 UNIT ~VE1GllT (pcf): N/A
TEST METHOD: ASTM C- 143 PI.ACEMENT LOCATION:
See page 1
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 75'Ni230'E ofNWC ofbldg.
REPORT OF TESTS ACC[.IMULATIVE YARDS: 220
CYLINDER .MEASURED .MAXIMUM COMPRESSIVE
MARKED SI.I.'MP DATE AGE LOAD STRENGTH FRACTL'RE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
3 1 5.00 05/14/1998 7 88930 3140
3 2 5.00 05/14/1998 7 92440 3270
Average 3210
3 3 5.00 06?04/1998 28 117460 4150
3 4 5.00 06/04/1998 28 113820 4030
Average 4090
This report is exclusively ibr the use of the client indicated aboxc and shall not be reproduced except in frill without the v, titten approval of HBC Engineering, Inc.
01 AK Page 3 of 5
ENGhNEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas. Texas 75247
Date of Service: 05/07/1998 Report No.: 9811769 Report
Date
06/08/1998
Client No.: 71765000 Project No.: 43-2479-97
Client: PrentissAttn: DavidPr°pertiesGlass Limited, Inc. Project: Coppell,Calling CenterTexas
3890 W. N.W. Hw,w, Suite 400
Dallas TX 75220
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Butler Construction CONCRETE CLASS: 9351
CONCRETE SL'PPLIER: Pioneer Concrete PLACEMENT DATE: 05/07/1998 BATCH TIME: 10:20 am
PLANT: 16 TI.XlE SAMPLED: 10:32 am BY: Mario Villanueva
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy
STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)- AIR 70 F CONCRETE: 68 F
SLUMP: 3-5" TRUCK NO: 841 TICKET NO: 711997
AIR: 3-6% AIR CONTENT (%): 4.8 t:NIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
See page 1
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 95'N:I65'E of NWC of bldg.
REPORT OF TESTS ACCUMULATIVE YARDS: 320
CYLINDER MEASURED MAXLMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi} TYPE
4 1 5.00 05/14./1998 7 79360 2810
4 2 5.00 05/14/1998 7 78310 2770
Average 2790
4 3 5.00 06,."'04/1998 28 100530 3560
4 4 5.00 06..'04/1998 28 105000 3710
Average 3640
This report is exclusively for the use of the client indicated abox e and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01AK Page 4 of 5
CONCRETE COMPR 'LSIVE STRENGTH TES .
ENGLNEERING, EqC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 05/07.,.'1998 Report No.: 9811769 Report Date
06./08/1998
Client No.: 71765000 Project No.: 43-2479-97
Client:Attn:PrentissPr°pertiesLimited' InC.David Glass Project: Calling Center COPY
3890 W. N.W. Hwy, Suite 400 Coppell, Texas
Dallas TX 75220
Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Butler Construction CONCRETE CL.~,SS: 9351
CONCRETE SUPPLIER: Pioneer Concrete PLACE.XlENT DATE: 05/07/1998 BATCH TreE: 11:40 am
PLANT: 16 TI.TIE SA_X~PLED: 11:50 am aY: Mario Villanueva
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy
STRENGTH: 4000 psi 6' 28 Days TEMPERATURE (F)-AIR 82 F CONCRETE: 77 r
SLUMP: 3-5" TRUCK NO: 729 TICKET NO: 712008
.SIR: 3-6% AIR CONTENT (%): 4.2 [.INIT WEIGHT (per): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
See page 1
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 138'N;80'E of NWC &bldg.
REPORT OF TESTS ACCt'.x-nJLAIIVE Y.SRDS: 420
CYI.INDER MEASURED MAXIMI_'M COMPRESSIVE
MARKED SLUMP DATE AGE I.OAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
5 1 5.00 05,'"14/1998 7 83320 2950
5 2 5.00 05/14/1998 7 87920 3110
Average 3030
5 3 5.00 06/04/1998 28 104630 3700
5 4 5.00 06,"04/1998 28 104400 3690
Average 3700
Technician: Mario Villanueva Started: 4:00 am Finished: 12:30 ~'~
Engineering,
Inc.
Report Distribution:
(1) Premiss Properties Limited, Inc. {I) HalffAssoc~ates, Inc.
(1) Butler Construction (1) City of Coppell Eugene narbour
( 1 ) Alliance Architects, Inc. (1) Evert.'Butler Const. \.'ice President
(1) Brockette Davis Drake, Inc. (1) I IBC Engineering; Mr. Eugene Ha:'bour
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01AK Page 5 ot'5
REPORT OF DRILLE . PIER INSPECTION
ENGhN-EERING, LNC.
8901 Car@enter Frwy., Suite #100
Dallas. Texas 75247
Date of Service: 05/11/1998 Report No.: 9812049 Report Date
06/08/1998
Client No.: 71765000 Project No.: 43-2479-97
Client: Prentiss Properties Limited, InC.Atm: David Glass Project: Calling Centercoppell, Texas ~,~' O ~'~q~'~'
3890 W. N.W. Hw.w, Suite 400
Dallas TX 75220
Services: Drilled pier inspec~icn.
On this dane, an HBC Engineering representauiTe arrived an nhe above referenced
jobsite as scheduled for drilled oier inspecnicn. See annached sheens for
recorded daua.
NOTE: P stands fcr light pc!e.
?echnician Time: 6:00 am nc 4:00 ur.
Technician: Ten3' L. Smith ~ Engineering, Inc.
Report Distribution:
(l) Prentiss Properties l_imited, Inc. (l) l lalt'f Associates, Inc.
(1) Butler Construction (1) City ot'Coppell Paul D. Smith, P.E.
( 1 ) Alliance Architects, Inc. ( 1 ) l ICBeck Con::'actors Senior Project Engineer
( 1 )Brockette Davis Drake, Inc. ( 1 ) City of Coppell
This report is exclusively for the use of the client indicated above and shall not be ~'¢produced except in tull without the written approval of IIBC Engineering, Inc.
99SS Page 1 of !