Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Northlake 635(7)-LR 980604
REPORT OF DRILLED BELLED PIERS COPY ENGINEEP~qG. ~-C. $901 Ca~enter F.m.-y. S::ite =] :~ Dall~. Tex~ 752~- Project: Calling Center Report No.: 9814389 Coppell, Texas Date of Service: 06/04/98 Project No.: 43-2479-98 Technician: K. Fowler Page: 1 of 1 Pier Identification B.5/0.3 B.7/0.3 B.9/0.3 C.2/0.3 C.35/0.3 C.5/0.3 C.8/0.3 D.2/0.3 D.4/0.3 I Pier Diameter (in.) 24 _._2.4 .... 24 __2_4. ..... 24 24 ......... _2_4 24 .... 24- ............... Bell Diameter {in.) 54.0 54.0 54.0 54.0 54.0 54.0 54.0 54.0 54.0 Top of Pier Elevation (ft) 95.8 95.8 ...... _9.6.0 96.0 ..... 96.4 96.4 .. 96.5 96.5 9_6.--7 ...... Req. Depth From Exist. Grade (ft) .... 13.0 13.0_ .......!3.0 13.0_ .... 13.0 13.0 .... 1..3.0 _ 13.0 1__3._0. ....... Initial Depth of Pier From Existing Final Depth of Pier From Existing Grade (fi) 14.5 14.0 14.2 14.0 14.~_ 14.4 13.2 13.2 14.8 Depth From Top of Concrete (ft) .._ 1__3.0 12.5 __ _ 1_.2_:7 12.5 _ 12.7 12.9 11.7 _. 11.7 13.3 ......... Condition of Bottom (wet or dry) ._. D~_. Dry ...... ._Dry .... Dry Dry Dry Dry .....Dry Dry ............ Plumb Within Tolera_.n_ce (--yes or no) Yes Yes Yes Yes Yes __ Yes Yes Y~_s Yes __ Casing Diameter (in) N/~A .... N/A N/A_ ..... _N_/A N/A N/A N/A N/A N/A ....... _C_a_sed Depth (ft) ......... N/A .__ N/A N/A N/A N/A N/A .... N_/A N/A ..... N/.A ..... Number of Vertical Bars (ea.) 6 6 __ 6 6 ........ .6_ 6 __ 6 ..... 6 6 ........... Reinforcing Bar Size (#) _._6. ....... 6 6 .......... 6_ 6 ........ .(~ 6 ...... 6 6 ........... Length of Vertical Bars (ft.) 14.8 ...... 14...3. 14.5 1.4.~3 ..... 14.5 14._7~.. _1_3_:5 13.5 15.1 .... Time Drilling Was Completed 1:00 pm 1:15 pm .... 1:_3_0 p_m_ . 1:45 pm 2_:00 pm_ ..... 2:15 pm 2:30_ p__m 2:45 pm 3:00 pm ...... Time Concrete Was Placed 1:30 pm 1:45 pm 2:15 pm 2:45 pm 3:00 pm 4:00 pm 4:10 pm 4:20 pm 4:30 pm