Loading...
Northlake 635(7)-LR 980518 ENGINEERING, I~-C. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/04,"1998 Report No.: 9811493 Report Date 05/18/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, InC.Attn: David Glass Project: Calling Centercoppell. Texas GO~"~'y 3890 W. N.W. Hv%w, Suite 400 ' Dallas TX 75220 Services: In-place density testing. PROJECT DATA CONTRACTOR: Butler Construction I.aboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: Maxiraum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Yellow tan shaley cl w/gravel 20.0 108.0 -1/~-3% 95% FIELD DENSITY TESTS TEST M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. (%) (pcf) (% max) Interior Pour Strip backfill 428 Final lift, NW Comer 75'S 1 22.1 105.9 98 429 Final lift, N%V Comer 175'S 1 22.0 105.7 98 430 Final lift, NW Comer 250'S 1 22.4 105.3 98 431 Final lift, NW Comer 350'S 1 21.9 105.4 98 432 Final lift, NW Comer 400'S 1 21.3 106.1 98 433 Final lift, SW Comer 30'E 1 21.6 105.8 98 434 Final lift, SW Comer 90'E 1 22.0 105.9 98 435 Final lift, SW Comer 170'E 1 21.7 105.4 98 436 Final lift, SW Comer 260'E 1 21.6 105.7 98 437 Final lift, SW Comer 340'E 1 21.8 105.4 98 438 Final lift, SE Comer 60'N 1 22.1 105.1 97 439 Final lift, SE Comer 120'N 1 22.3 105.3 98 '[his report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07TMP Page I of 2 TEST M/l) MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. (%) (pcf) (% max) 440 Final lift, SE Comer 240'N 1 21.9 105.5 98 441 Final lift, SE Comer 340'N 1 22.3 105.7 98 442 Final lift, SE Corner 400'N 1 22.0 105.2 97 443 Final lift, SE Comer 60'W I 22.1 105.9 98 444 Final lift, SE Comer 130'W I 21.6 106.5 99 445 Final lift, SE Comer 230'W 1 21.9 106.2 98 446 Final lift, SE Comer 330'W 1 21.7 106.3 98 Test results on this report meet project specification. Technician: Tex King nI~ Engineering, Inc. Report Distribution: (1) Prentiss Properties Limited, Inc. (1) Halff Associa:es, Inc. (1) Butler Construction Il ) City ol~Coppel[ Paul D. Smith, P.E. (1) Alliance Architects, Inc. {1 ) ltCBeck Con:factors Senior Project Engineer ( 1 ) Brockette Davis Drake, Inc. (1) City of Coppeli This report is exclusively for the use of the client indicated above and shall not be reproduced except in fisll without the written approval of HBC Engineering, Inc. 07TMP Page 2 of 2 CONCRETE COMPR[. SIVE STRENGTH TES_ ENGENmrfRING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/16,/1998 Report No.: 9809878 Report Date 05/18/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, InC.Attn: David Glass Project: Calling Centercoppell, Texas CO~Y 3890 W. N.W. Hx~% Suite 400 ' Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9351 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/16/1998 BATCH TIME: 6:06 am PLANT: 22 TIME SAMPLED: 6:50 am BY: Del Ratliff SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cool, hazy, windy STRENGTH: 4000 psi ~' 28 Days TEMPERATL'RE (F)- AIR 58 F CONCRETE: 74 F SLUMP: 5" TRUCK SO: 841 TICKET NO: 648344 AIR: N/A AIR CONTENT (%): N/A L'NIT VCEIGHT (pcf): N/A TEST METliOD: ASTM C-143 PLACEMENT LOCATION: Paving on south side of building 71' east to 200' east along south side, plus 150' south ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 175'E:25'S of'SW bldg. corner REPORT OF TESTS ACCUMULATIVE YARDS: 50 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SI,UMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 6.00 04.:23/1998 7 84950 3000 1 2 6.00 04/23/1998 7 84700 3000 Average 3000 1 3 6.00 05..' 14,/1998 28 102420 3620 1 4 6.00 05,."14/1998 28 113080 4000 Average 3810 -F~is report is exclusixely for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01AK Page I of 3 ENGINEERING, INC. 8901 Carpenter Frwy.. Suite #100 Dallas, Texas 75247 Date of Service: 04."16,"1998 Report No.: 9809878 Report Date 05/18/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center ~~~y Attn: David Glass Coppell, Texas -v.~.~, nt~,~ 3890 W. N.W. Hx~% Suite 400 Dallas TX 75220 Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9351 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENI DATE: 04/16/1998 BATCH TIME: 7:30 am PLANT: 22 TLXI£ SAMPLED: 8:00 am BY: Del Ratliff SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cool, clear, windy STRENGTH: 4000 psi @ 28 Days TEMPERATI_'RE (F)-AIR 59 F CONCRETE: 74 F SI.UMP: 5" TRUCKNO: 1824 TICKETNO: 648354 AIR: N.."A Am CO~TENT (%): N.:'A t'XIT WEIGHT (peri: N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 100'S;150'E of SW bldg.corner REPORT OF TESTS .ACCUMULATIVE YARDS: 150 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLI.'MP DATE AGE I.OAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 6.50 04...,'23/1998 7 86440 3060 2 2 6.50 04/23/1998 7 92270 3260 Average 3160 2 3 6.50 05/14/1998 28 112510 3980 2 4 6.50 05/14/1998 28 114490 4050 Average 4020 This report is exclusively tbr thc use of the client indicated abox c and shall not be reproduced except in (ull x~ ithout the written approval of I IBC Engineering, Inc. 01AK Page 2 of 3 ENGLNEERING, INC. 11901 Carpenter Fr~'., Suite #I00 Dallas, Texas 75247 Date of Service: 04/I 6/1998 Report No.: 9809878 Report Date 05/18/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center ~OPY Attn: David Glass 3890 W. N.W. Hw3r, Suite 400 Coppell, Texas Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9351 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/16/1998 BATCH TIME: 8216 am PLANT: 22 TIME SAMPLED: 9:05 am aY: Del Ratliff SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cool, clear, windy STRENGTH: 4000 psi C~ 28 Days TEMPERATL'RE (F)- AIR 60 F CONCRETE: 76 F SLUMP: 5" TRUCK NO: 552 TICKET NO: 648363 AiR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACE_TI ENT LOCATION: ASTM C- 172 See page 1 ASTM C-39 SAMPLE LOCATION: 100'S/75'E of SW bldg. corner REPORT OF TESTS ACCUMULATIVE YARDS: 230 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SI_UMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 I 7.00 04/23/1998 7 86680 3070 3 2 7.00 04/23/1998 7 86990 3080 Average 3080 3 3 7.00 05.,'14/1998 28 114670 4060 3 4 7.00 05/14/1998 28 106580 3770 Average 3920 Technician: Del Ratliff Started: 5:00 am Finished: 10:00 ~ Engineering, Inc. Report Distribution: (1) Prentiss Properties Limited, Inc. (1) Italff Associates, Inc. (1) Butler Construction ( 1 ) City of Coppe[I Eugene Harbour ( 1 ) Alliance Architects, Inc. ( I ) Evert/Butler Const. Vice President (1) Brockette Daws Drake, Inc. (1) HBC Engineering; Mr. Eugene Harbour This report ns exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01AK Page 3 of 3