Loading...
Northlake 635(7)-LR 980508IN-PLACE DENSITY 5, LSTING - ENGINFY_RING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75~-47 Date of Service: 04/29/1998 Report No.: 9811031 Report Date 05/08/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center .3~PY Attn: David Glass Coppell, Texas '"" 3890 W. N.W. H;~5', Suite 400 Dallas TX 75220 Services: In-place density testing. PROJECT DATA CONTRACTOR: Butler Construction l.aboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: Maximum Project Requirements M/D No. Description Moisture % Density pcf .Moisture Density 1 Yw tan shal cl w/small gravel 20.0 108.0 -1/+3% 95% FIELD DENSITY TESTS TEST M/D MOISTURE DRY DENSIIY DENSITY NO TEST LOCATION No. (%) (pcf) (% max) NW Corner-interior GB backfill 404 Lift 1, 90'S 1 21.0 106.5 99 405 Final lift, 100'S 1 20.7 105.7 98 406 Lift 1,200'S 1 21.2 105.4 98 407 Final lift, 250'S 1 20.9 105.7 98 408 Lift 1,390'S 1 21.2 106.1 98 409 Final lift, 400'$ 1 20.7 106.6 99 S~,V Corner-interior GB backfill 410 Lift 1, 40'E 1 20.9 106.5 99 411 Final lift, 80'E 1 20.6 106.8 99 412 Lift I, 170'E 1 21.2 106.3 98 413 Final lift, 190'E 1 21.4 106.8 99 414 Lift 1,280'E 1 21.0 105.7 98 This report is exclusively for the use of the client indicated above and shall not bc reproduced except in lull without the ~Titten approval ofllBC Engineering, Inc. 07MP Page 1 of 2 Report No.: 9811031 ~ ~.~1~ '- TEST M/D MOISTURE DRY DENSITY DENSITY NO '[EST LOCATION .No. (%) (pcf) (% max) 415 Final lift, 350'E 1 21.3 106.5 99 SE Corner-interior GB backfill 416 Lift 1, 70'N 1 20.9 106.6 99 417 Final lift, 110'N 1 20.3 105.9 98 418 Lift 1,230'N 1 20.7 105.4 98 419 Final lift, 260'N 1 21.0 105.7 98 420 Lift 1,370'N 1 20.9 105.3 98 421 Final lift, 400'N 1 21.0 105.4 98 NE Corner-interior GB backfill 422 Lift 1, 70'W 1 21.4 105.9 98 423 Final lift, 100'W 1 21.6 106.5 99 424 Lift 1, 170'W 1 21.0 106.6 99 425 Final lift, 200'W 1 20.9 105.9 98 426 Lift 1,270'W 1 20.6 106.5 99 427 Final lift, 300'W 1 20.8 106.8 99 Test results on this report meet project specification. Technician: TexKing ~ Engineering, Inc. Report Distribution: (I) Premiss Properties Limited, Inc. (1) ltalff Associa:cs, Inc. (1) Butler Construction (I) Cit? of Coppc3 Paul D. Smith, P.E. (1) Alliance Architects, Inc. (1) I ICBeck Contractors Senior Project Engineer (1) Brockeue Davis Drake, Inc. (1) City of Copp¢'.l This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval oflIBC Engineering, Inc. 07MP Page 2 of 2