Loading...
Northlake 635(7)-LR 980427CONCRETE COMPRL, ._SIVE STRENGTH TES_ ENGLNEERING, LNC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03,"25/1998 Report No.: 9808096 Report Date 04/27/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center COPY Attn: David Glass Coppell. Texas 3890 W. N.W. H~, Suite 400 ' Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9351 CONCRETE SUPPLIER: Pioneer Concrete PLACE.MENT DATE: 03/25/1998 BATCH TIME: 4:20 am PLANT: 22 TI.ME SAMPLED: 4:50 am BY: Jack Farris SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)-.AIR 62 F CONCRETE: 79 F SLt,.~IP: 5" TRUCKNO: 512 TICKETNO: 645576 AIR: 3-6% AIR CONTENT (%): 4.0 UNIT WEIGHT (peO: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Paving, parking east side of building ASTM C-172 ASTM C-39 SAMPLE LOCATION: From NWC, 3 yds E, 3 yds S REPORT OF TESTS ACCUMULATIVE YARDS: 40 CYLINDER MEASURED M.42~IMUM COMPRESSIVE MARKED SLL'MP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.00 04.'"'01/1998 7 88410 3130 1 2 5.00 04/01/1998 7 83960 2970 Average 3050 1 3 5.00 04;22/1998 28 113990 4030 1 4 5.00 04/22/1998 28 116530 4120 Average 4080 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of ItBC Engineering, Inc. 01AK Page I of 4 ENGLN-EERIbG, ~'C. 8901 Carpenter Frwy.. Suite #100 Dallas, Texas 75247 Date of Service: 03/'25/'1998 Report No.: 9808096 Report Date 04/27/1998 Client No.: 71765000 Project No.: 43-2479-97 Prentiss Properties Limited, lnc. Project: Callin~Center COPY Client: Attn: David Glass ~ 3890 W. N.W. HxW, Suite 400 Coppell, Texas Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9351 CONCRETE SUPPLIER: Pioneer Concrete PLAC'EMENT DATE: 03/25/1998 BATCH TIME: 5:25 am PLANT: 22 TIME SAMPLED: 5:55 am BY: Jack Farris SPECIFICATION REQUIREMENTS WEATHERCONmTIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 62 F CONCRETE: 80 V SLt'MP: 5" TRUCKNO: 1805 TICKET.~O: 645594 AIR: 3-6% AIR CONTENT ("/o): 3.0 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: ASTM C- 172 See page 1 ASTM C-39 SAMPLE LOCATION: From SWC 12 yds E, 4 yds N REPORT OF TESTS ACCUMULATIVE TAROS: 137 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLt:M P DATE AG E LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 5.00 04/01/1998 7 95230 3370 2 2 5.00 04/01/1998 7 88850 3140 Average 3260 2 3 5.00 04/22/1998 28 113700 4020 2 4 5.00 04."22/1998 28 112970 3990 Average 4010 This report is exclusp;ely lbr the use of thc client indtcated above and shall not be reproduced except in i'ull v,'ithout the written approval ofl IBC Engineering, Inc. 01AK Page 2 of 4 Dallas, Texas 75247 Date of Service: 03/25/1~9g Report No.: ~0g0~ Report Date 04/27/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: PrentissPropeniesLimited, lnc. Project: Calling Center ~~~~ A~: David Glass 3890 W. N.W. H~W, Suite 400 Coppell, Texas Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONURETE CLASS: 9351 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 03/25/1998 BATCH TIME: N./A PLANT: 22 TIME SAMPLED: 7:15 am BY: Jack Farris SPECIFICATION REQUIREMENTS WEATItER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPER_ATL'RE (F)-AIR 62 F CONCRETE: 80 F SLUMP: 5" TRUCK NO: 1824 TICKET NO: 645608 AIR: 3-6% AIR CONTENT (%): 3.2 UNIT WEIGHT (pef): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: ASTM C- 172 See page 1 ASTM C-39 SAMPLE LOCATION: From NEC, 40 yds W, 6 yds S REPORT OF TESTS ACCUML'LATIVEYAROS: 235 CYLINDER .MEASURED MAXIMUM COMPRESSIVE MARKED SLU.MP DATE AGE I.OAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 5.25 04/01/1998 7 104210 3690 3 2 5.25 04/01 / 1998 7 99510 3520 Average 3610 3 3 5.25 04/22/1998 28 123520 4370 3 4 5.25 04..'22/1998 28 119380 4220 Average 4300 This report is exclusively for the use of' the client indicated abox c and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01AK Page 3 of 4 CONCRETE COMPRE- SIVE STRENGTH TES ENGI2qEERING. INC. 8901 Carl}enter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03,'25/1998 Report No.: 9808096 Report Date 04/27/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: erentiss Properties Limited, Inc. Project: Calling Center GOPY Attn: David Glass 3890 W. N.W. Hx~3', Suite 400 Coppell, Texas Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CL.,SS: 9351 CONCRETE SUPPLIER: Pioneer Concrete PLAC£.XlENTDATE: 03/25/1998 BATCH TIME: 7:25 am PLANT: 22 TIME SAMPLED: 8:30 am By: Jack Farris SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)- AIR 63 F CONCRETE: 80 F SLUMP: 5" TRUCK,~O: 552 TICK, TN'O: 645619 AIR: 3-6% .AIR CONTENT (%): 4.2 CNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page i ASTM C- 172 ASTM Co39 SAMPLE LOCATION: From SEC, 12 yds W, 2 3'ds N REPORT OF TESTS ACCt:Mt:L~IIVE YARDS: 335 CYLINDER MEASURED _MAXIMU.M COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 5.50 04/01/1998 7 98120 3470 4 2 5.50 04/01/1998 7 89900 3180 Average 3330 4 3 5.50 04/22/1998 28 120000 4240 4 4 5.50 04/22,.'1998 28 121500 4300 Average 4270 Technician: Jack Farris Started: 3:00 am Finished: 10:30 ~ Engineering, Inc. Report Distribution: (I) Premiss Properties Limited, Inc. ~1 ) HalffAssociatcs, Inc. (1) Butler Construction (1) City of Coppcll Eugene Uflrbour (1) Alliance Architects. Inc. (1) Every'Butler Const. Vice President (1) Brockettc Davis [)rake. Inc. (1) I tBC Engineering; Mr. Eugene ltarbour This report is exclusively for the use of the client in&cared above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01AK Page 4 of 4