Loading...
Northlake 635(7)-LR 980424CONCRETE COMPRI, ,SIVE STRENGTH TES_ ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, lexas 75247 Date of Service: 03/'26.-"1998 Report No.: 9808202 Report Date 04/24/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center GOPY Attn: David Glass Coppell, Texas 3890 W. N.W. Hx~3', Suite 400 Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9349 CONCRETE SUPPI. IER: Pioneer Concrete PLACEMENT DATE: 03/26/1998 hATCH TreE: 7:45 am PLANT: 22 TIME SAMPLED: 8:15 am By: Damon Elrod SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy, windy STREN'GTH: 4000 psi @ 28 Days TEMPERATURE (F)-.AIR 63 E CONCRETE: 62 r SLUMP: 5" TRUCKNO: 806 TICKET.X'D: 645776 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (peO: N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Panels ASTM C-172 ASTM C-39 SAMPLE LOCATION: Panel 53 REPORT OF TESTS ACCUMULATWE YAI~S: 30 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED S[.UMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 4.75 04/02/1998 7 117270 4150 1 2 4.75 04.-'02/1998 7 109120 3860 Average 4010 1 3 4.75 04.,"23/1998 28 142970 5060 1 4 4.75 04..'23;' 1998 28 146210 5170 Average 5120 This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01AK Page 1 of 4 C;OINCRF~TE COMPRi._ SIVE STRENGTH TES_ ENGLNEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/26/1998 Report No.: 9808202 Report Date 04/24/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center ~ Att-n: David Glass Coppell, Texas 3890 W. N.W. Hvo~, Suite 400 Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9349 CONCRETE SUPPI.IER: Pioneer Concrete PLAC'EMENT DATE: 03/26/1998 BATCHTIME: 9:30 am PL.&NT: 22 TIME SAMPLED: 9:57 am BY: Damon Elrod SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy, windy STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)-AIR 63 F CONCRETE: 64 F SLI.;MP: 5" TRI.'CKNO: 760 TICKETNO: 645798 AIR: N/A AIR CONTENT (%): N;"A UNIT WEIGHT (per): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPI.E LOCATION: Panel 61 REPORT OF TESTS ACCL'MULATIVE YARDS: 130 CYLINDER MEASURED MAXIMUM CO.MPRESSIVE MARKED SI.UMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 5.00 04..'02/1998 7 103760 3670 2 2 5.00 04/02/1998 7 101490 3590 Average 3630 2 3 5.00 04/23/1998 28 148410 5250 2 4 5.00 04..'23/1998 28 152150 5380 Average 5320 This report is exclusively tbr the use of tile client indicated abox e and shall not be reproduced except in full without thc xxTitlen approval of HBC Engineering, Inc. 01AK Page 2 of 4 CONCRETE COMPRL-_ SIVE STRENGTH TES-_ ENGLNEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/26/1998 Report No.: 9808202 Report Date 04/24/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: PrentissProperties Limited, Inc. Project: Calling Center -"~~,~'r~.~g' Attn: David Glass '"~.,.-.~'~;~ '.'..~ '-'-'~.' ~. 3890 W. N.W. Hx~j, Suite 400 Coppell, Iexas Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9349 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 03/26/1998 BATCHTLXIE: 11:30 am PLATT: 22 TreE SA~PLED: 12:00 pm BY: Damon Elrod SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy, windy STRENGTH: 4000 psi ~ 28 Days TE.~n'ERATVRE (F)- AIR 68 F CONCRETE: 64 F SLt?.X~P: 5" TRt'C~NO: 736 TICKETNO: 645822 AIR: N/A AIR CONTENT (%): .N,':"A UNIT 'WEIGHT (pcl): N/A TEST METUOD: ASTM C- 143 PLACE.TreNT LOCATION: ASTM C- 172 See page l ASTM C-39 SAMPLE LOCATION: Panel 38 REPORT OF TESTS ACCt:.~trLAT~VE YAROS: 230 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLU51P DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 5.25 04/02/1998 7 126080 4460 3 2 5.25 04/02/1998 7 115340 4080 Average 4270 3 3 5.25 04/23/1998 28 157010 5550 3 4 5.25 04/23/1998 28 154640 5470 Average 5510 This report is exclusively for the use of the client indicated aboxe and shall not be reproduced except in full without the written approval of 1IBC Engineering, Inc. 01AK Page 3 of 4 ENG/NEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/26/1998 Report No.: 9808202 Report Date 04/24/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center Attn: David Glass Coppell, Texas 3890 W. N.W. Hw3,, Suite 400 Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9349 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 03/26/1998 BATCH XI.~tr: 1:05 pm PLANT: 22 TIME SAMPLED: 1:30 pm nv: Damon Elrod SPECIFICATION REQL'IREMENTS WEATHER CONDITIONS: Sunny, windy STRENGTH: 4000 psi 6:28 Days TE_MPERA. TURE (F)-.AIR 73 F CONCRETE: 70 F SLUMP: 5" TRUCK NO: 1824 TICKET NO: 645842 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Panel 21 REPORT OF TESTS ACCt.',m:L,WlVE YARDS: 330 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 4.75 04/02/1998 7 113080 4000 4 2 4.75 04/02/1998 7 103190 3650 Average 3830 4 3 4.75 04/23/1998 28 149080 5270 4 4 4.75 04.':23/1998 28 150740 5330 Average 5300 Technician: Damon Elrod Started: 7:00 am Finished: 4:00 pm nI~ Engineering, Inc. Report Distribution: (1) Prentiss Properties Limited, Inc. (1) I Ialff Associates, lnc. (1) Butler Construction I1 ) City of Coppell Eugene Harbour (1) Alliance Architects, Inc. (I) Evert-'Butler Const. Vice President (1) Brockette Davis Drake, Inc. (I) HBC Engineering; Mr. Eugene Harbour This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of I IBC Engineering, Inc. 01AK Page 4 of 4